Drilling Strikes 4.0m @ 23.7g/t Au at Trafalgar, NE Tasmania
Released
Released
Announcement PDF
ASX Announcement
ASX Announcement
14 September 2023
19 January 2023
Drilling Strikes 4.0m @ 23.7g/t Au
at Trafalgar, NE Tasmania
Highlights
•
ASX: FG1
ABN 82 644 122 216
CAPITAL STRUCTURE
•
o TFDD013:
4.0m @ 23.7g/t Au from 23.0m, including
o 0.5m @ 169.8g/t Au from 25.9m
Further gold intersected within the granodiorite intrusive, including:
o TFDD009:
2.7m @ 3.06g/t Au from 68.0m including
o 1.2m @ 5.09g/t Au from 69.0m
Share Price: A$0.071
Cash (30/06/23): A$3.8M
Debt: Nil
and within the adjacent metasediments, including:
Ordinary Shares: 136.4M
Market Cap: A$9.7M
o TFDD011:
2.3m @ 1.56g/t Au from 12.0m
5.5m @ 1.58g/t Au from 255.0m, including
o 0.5m @ 5.58g/t Au from 260.5m
Options: 3.4M
Performance Rights: 3.7M
BOARD OF DIRECTORS
o TFDD012:
62.0m @ 0.63g/t Au from 222.0m, including
o 3.4m @ 4.53g/t Au from 256.0m, and
o 0.75m @ 10.44g/t Au from 262.65m.
Clive Duncan
Non-Executive Chair
Neil Marston
Managing Director / CEO
Bonanza gold intercept at shallow depth from extensional
diamond drilling in Mathinna Group sediments at the Trafalgar
Prospect in NE Tasmania including:
•
Gold system at the 100% owned Trafalgar Prospect expanded
beyond 400m East-West strike length, from surface to a depth of
420m and remains open in all directions
•
Phase 2 drilling completed with 8 holes advanced for 1,987.35m
Non-Executive Director
•
Assay results pending for 925m of drilling
COMPANY SECRETARY
Flynn Gold Limited (ASX: FG1, “Flynn Gold” or “the Company”) is
pleased to provide an update on its diamond drilling program being
carried out at the Company’s 100% owned Golden Ridge Project located
in NE Tasmania (see Figure 1).
Sam Garrett
Technical Director
John Forwood
Mathew Watkins
CONTACT
Level 4, 96-100 Albert Road,
South Melbourne,
Victoria, 3205
+61 (0) 3 9692 7222
info@flynngold.com.au
www.flynngold.com.au
Managing Director and CEO, Neil Marston commented,
“We are thrilled that drilling at the Trafalgar Prospect at Golden Ridge in
north-east Tasmania has delivered another high-grade gold intersection.
“The latest results include 4 metres at 23.7g/t gold from just 23 metres
downhole. Within this intersection we have recorded the highest gold
grade interval seen to date at Golden Ridge with 0.5m at 169.8g/t Au.
“This drill hole was sited to test beneath a recently discovered historical adit and has produced
an exciting intercept as we grow the scale of the deposit beyond a 400m strike length. There
is no drilling down dip or along strike east of this very high-grade intersection, presenting an
excellent opportunity to follow-up.
“We have paused drilling at Trafalgar to allow time for our technical team to assess further
assay results as they become available and plan the next drill program. With assay results for
925m of diamond drilling still pending, we look forward to announcing further results in the
coming weeks.”
Golden Ridge Project
The Company’s Golden Ridge Project is situated within EL17/2018 in North-east Tasmania
(see Figure 1).
Figure 1 - Location of Flynn Gold tenements in NE Tasmania.
Page 2 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Exploration by the Company at Golden Ridge has identified anomalous gold extending over
an 8km long contact zone along the southern margin of the Golden Ridge Granodiorite. The
Golden Ridge Project exhibits attributes of a large intrusive-related gold system (IRGS) and
the Company is continuing to identify and test multiple exploration targets, with the aim of
making further discoveries.
The focus of recent drilling has been at the Trafalgar Prospect (see Figure 2).
Figure 2 - Flynn Gold’s Golden Ridge Project, NE Tasmania, showing prospect areas.
Trafalgar Drilling Update
The Company’s drilling program at Trafalgar has advanced with a total of 14 drill holes
completed in 2 phases since May 2022.
Page 3 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
The Phase 1 drill program completed in February 2023, comprised 7 diamond holes
(TFDD002-TFDD008) and delivered highly encouraging results, including the best gold
intersection recorded so far at Golden Ridge, being 12.3m @ 16.8g/t Au from 108.7m in
TFDD005 1.
The Phase 2 drill program was completed in August 2023, with step-out diamond drill holes
designed to test the extent and continuity of the gold vein system at Trafalgar. Drill holes
TFDD008 (extension) and TFDD009 to TFDD015 were completed for a total of 1,987.35m in
the program.
New assay results reported in this update are from 5 drill holes, including all of TFDD0010 and
TFDD013, the remainder of TFDD009 and parts of TFDD011 and TFDD012. Results for drill
holes TFDD014, TFDD015, and the remaining parts of TFDD011 and TFDD012, totalling
925m, will be reported once laboratory assays are available over the coming weeks.
Significant mineralised intercepts are detailed in Table 2 and selectively shown in Figure 3.
Best intercepts include:
TFDD013:
•
4.0m @ 23.7g/t Au from 23m, including 0.5m @ 169.8g/t Au from 25.9m
TFDD009:
•
2.7m @ 3.06g/t Au from 68m, including 1.2m @ 5.09g/t Au;
•
1.5m @ 2.09g/t Au from 117.5m, including 0.5m @ 5.93g/t Au.
TFDD010:
•
1m @ 3.63g/t Au from 56m, including 0.4m @ 8.03g/t Au;
•
1m @ 1.1g/t from 127m;
•
1m @ 1.23g/t Au from 182m;
•
1m @ 2.32g/t Au from 216m;
•
1m @ 1.13g/t Au from 230m.
TFDD011:
•
2.3m @ 1.56g/t Au from 12m depth (below historical adit void);
•
0.5m @ 3.39g/t Au from 73.5m depth;
•
5.5m @ 1.58g/t Au from 255.5m depth; including 0.5m @ 5.58g/t Au.
TFDD012:
•
1
62.0m @ 0.63g/t Au from 222.0m, including 3.4m @ 4.53g/t Au from 256.0m, and
0.75m @ 10.44g/t Au from 262.65m.
See FG1 ASX Announcement dated 12 December 2022 for full details.
Page 4 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Figure 3 - Drill hole location plan, Trafalgar Prospect, Golden Ridge Project. Significant intercepts reported as
downhole length
All holes reported were successful in intersecting zones of gold mineralisation. Importantly, the
new assay results continue to grow the Trafalgar gold mineralisation system, which now
extends over an east-west drilled strike length of at least 400m and to depths of up to 420m
from surface. Mineralisation currently remains open in all directions.
TFDD013 was drilled beneath a historical mine adit which was identified by a void intersected
in drill hole TFDD011 at 10.5-11.1m depth with mineralised quartz veins adjacent to the void
(2.3m @ 1.56g/t Au from 12.0m). TFDD013, drilled at a steeper angle to TFDD011, intersected
a zone of quartz vein stockwork veining around a central 0.5m wide quartz-sulphide vein lode
containing coarse disseminated to banded pyrite-arsenopyrite-galena-pyrrhotite-chalcopyritesphalerite and disseminated fine grained visible gold (see Figure 4 & Figure 5). The central
vein lode assayed over the 0.5m interval as 169.8g/t Au from 25.9m.
Page 5 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
The TFDD013 intercept is located approximately 100m along strike to the northeast of 12.3m
@ 16.8g/t Au from 108.7m intersected in hole TFDD005 2 and is currently interpreted to be a
continuation of the same high-grade mineralised vein lode.
The results received to date for hole TFDD012 include a broad zone of low to moderate grade
gold mineralisation (62.0m @ 0.63g/t Au from 222.0m) associated with a zone of stockwork
and sheeted fracture-controlled veining in hornfelsed and silicified meta-sediments, and is
considered to be an extension of similar veining intersected in hole TFDD008 3 (94.1m @
0.44g/t Au from 202.0m, including 49.55m @ 0.67g/t Au from 246.55m) approximately 50m
to the east.
The latest results and observations continue to support Flynn’s exploration model that the
Golden Ridge Project is a large-scale intrusive-related gold system.
The Company is currently finalising geological and structural studies towards advancing its
understanding of the controls to mineralisation and a new geological framework interpretation
for Trafalgar and the wider Golden Ridge project area, the outcomes of which will be reported
in upcoming announcements.
Figure 4 - TFDD013 drill core - quartz vein with coarse sulphides at ~26m depth
2
3
See FG1 ASX Announcement dated 12 December 2022 for full details
See FG1 ASX Announcement dated 18 July 2023 for previously assay results
Page 6 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
~10 mm
Figure 5 - TFDD013 drill core - visible gold (circled) at ~26m depth
Other Exploration Activity
The Company has completed preliminary planning for a wide step-out drill program to test
continuity of mineralisation between the Brilliant and Trafalgar Prospects through the Link Zone
area – a strike length of approximately 2.5km (See Figure 2). An initial 4 diamond drill holes
across the Link Zone have been approved by Mineral Resources Tasmania (MRT).
Planning for follow-up drilling at the Trafalgar Prospect is on-going with a number of drill pad
locations already permitted. Additional drill pad locations will be identified once all drilling
information has been received and interpreted.
MRT permits for drilling at the Derby North Prospect within the recently acquired Warrentinna
Project 4 have been received with drilling is expected to start in late-September 2023.
Further details will be provided once drilling commences.
Approved by the Board of Flynn Gold Limited.
For more information contact:
Neil Marston
Managing Director & CEO
+61 3 9692 7222
info@flynngold.com.au
4
Ben Creagh
Media & Investor Relations
+61 (0) 417 464 233
benc@nwrcommunications.com.au
See FG1 ASX Announcement dated 5 June 2023 for full details
Page 7 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Table 1: Location Data for Phase 2 Trafalgar Drillholes (FG1 Drilling)
Drillhole ID
Easting
(m)
Northing
(m)
Elevation
(m)
Azimuth
(degrees)
Dip
(degrees)
Depth
(m)
TFDD008
TFDD009
TFDD010
TFDD011
TFDD012
588354
588074
588367
588420
588380
5416588
5416577
5416649
5416613
5416600
195
180
178
162
180
120
150
164
164.5
160
-55
-55
-53
-55
-50
149.9 (341.5)
213.95
269.5
315.4
322.9
TFDD013
TFDD014
TFDD015
588420
588456
588324
5416614
5416535
5416389
162
154
263
164.5
125.5
319.2
-65
-55
-70
TOTAL
47.5
236.6
431.6
1,987.35
Notes:
•
Co-ordinate projection is MGA94, zone 55.
•
Hole TFDD008 was extended by 149.9m from 191.6m to 341.5m in Phase 2.
Table 2 - Significant Intercepts Reported for Trafalgar Prospect Drillholes
Drillhole ID
From (m)
To (m)
TFDD009
0.0
68.0
69.0
70.7
80.0
81.0
95.0
96.0
117.5
117.5
118.0
135.0
154.5
161.9
162.8
209.25
209.75
68.0
70.7
70.2
80.0
81.0
95.0
96.0
117.5
119.0
118.0
135.0
162.8
155.0
162.8
209.25
209.75
213.8 (EOH)
0
56.0
56.0
57.0
127.0
128.0
157.0
159.0
161.0
162.0
165.0
169.0
174.0
175.0
182.0
183.0
196.0
56.0
57.0
56.4
127.0
128.0
157.0
159.0
161.0
162.0
165.0
169.0
174.0
175.0
182.0
183.0
196.0
197.0
including
including
including
and
TFDD010
including
Interval
(m)
2.7
1.2
1.0
1.0
1.5
0.5
27.8
0.5
0.9
0.5
1.0
0.4
1.0
2.0
1.0
4.0
1.0
1.0
1.0
Au (g/t)
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
3.06
5.09
0.36
0.83
2.09
5.93
0.28
1.53
1.70
5.05
3.63
8.03
1.1
0.36
0.35
0.32
0.47
1.23
0.33
Page 8 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Comment
New
New
New
New
New
New
New
New
New
New
New
Previous, 0.1g/t cut-off
Previous
Previous
Previous
Previous
Previous
New
New
New
New
New
New
New
New
New
New
New, 0.1g/t cut-off
New
New
New
New
New
New
Interval
(m)
Drillhole ID
From (m)
To (m)
TFDD010
(cont.)
197.0
200.3
202.8
205.4
206.4
216.0
217.5
227.8
231.0
236.0
237.0
249.0
251.0
258.4
258.8
266.0
267.0
200.3
202.8
205.4
206.4
216.0
217.5
227.8
231.0
236.0
237.0
249.0
251.0
258.4
258.8
266.0
267.0
269.5 (EOH)
0
10.5
11.1
12.0
14.3
73.5
74.0
111.9
111.9
114.0
122.0
153.0
154.0
160.0
161.0
185.6
186.0
194.0
229.0
231.0
235.0
255.5
260.5
261.0
266.0
267.0
268.0
270.0
271.0
282.0
10.5
11.1
12.0
14.3
73.5
74.0
111.9
114.0
113.2
122.0
153.0
154.0
160.0
161.0
185.6
186.0
194.0
229.0
231.0
235.0
255.5
261.0
261.0
266.0
268.0
267.6
270.0
271.0
282.0
315.7 (EOH)
NSI
Adit Void – No Sample
NSI
2.3
1.56
NSI
0.5
3.39
NSI
2.1
8.28
1.3
11.86
NSI
NSI
1.0
0.30
NSI
1.0
0.32
NSI
0.4
8.46
8.0
0.30
Assays Pending
NSI
4
0.5
NSI
5.5
1.58
0.5
5.58
NSI
2.0
0.67
0.6
1.85
NSI
1.0
0.32
NSI
Assays Pending
New
New
New
New
New
New
Previous
Previous
Previous
Previous
New
New
New
New
New
New
New, 0.1g/t Au cut-off
Previous
New
New
New
New
New
New
New
New
New
New
New
Previous
0
188.0
222.0
260.0
262.65
284.0
299.0
188.0
222.0
284.0
263.4
263.4
299.0
300.0
Assays Pending
NSI
62.0
0.63
3.4
4.53
0.75
10.44
NSI
1.0
0.69
New
New
New, 0.1g/t Au cut-off
New
New
New
New
TFDD011
including
including
including
TFDD012
including
and
2.5
1.0
1.5
3.2
1.0
2.0
0.4
1.0
Au (g/t)
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
0.41
0.44
1.85
0.62
0.39
0.63
1.12
0.44
Page 9 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Comment
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
Interval
(m)
Drillhole ID
From (m)
To (m)
TFDD012
(cont.)
300.0
312.0
313.0
322.0
312.0
313.0
322.0
322.9 (EOH)
0
23.0
25.9
25.9
27.0
23.0
27.0
27.0
26.4
47.5 (EOH)
4.0
1.1
0.5
TFDD014
0
236.6 (EOH)
Assays Pending
New
TFDD015
0
431.6 (EOH)
Assays Pending
New
TFDD013
including
including
1.0
0.9
Au (g/t)
NSI
NSI
NSI
NSI
0.52
0.56
23.7
82.3
169.8
Comment
New
New
New
New
New
New
New
New
New
Notes:
•
•
•
•
•
•
All reported intersections are assayed on geological intervals ranging from 0.3 to 2m.
Significant Intercepts cut-off grade is 0.3g/t gold unless indicated otherwise.
Reported grades are calculated as length-weighted averages.
Intercepts are downhole lengths.
NSI means No Significant Intercept.
Drill core samples are analysed for gold by fire assay (50-gram charge) with an AAS finish (ALS method
code Au-AA26).
Page 10 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
About Flynn Gold Limited
Flynn Gold is an Australian mineral exploration company with a portfolio of projects in Tasmania and
Western Australia (see Figure 6). The Company has nine 100% owned tenements located in northeast
Tasmania which are highly prospective for gold as well as tin/tungsten. The Company also has the
Henty zinc-lead-silver project on Tasmania’s mineral-rich west coast and the Firetower gold and battery
metals project located in northern Tasmania.
Flynn has also established a portfolio of gold-lithium exploration assets in the Pilbara and Yilgarn regions
of Western Australia.
For further information regarding Flynn Gold please visit the ASX platform (ASX: FG1) or the Company’s
website www.flynngold.com.au.
Figure 6 - Location Plan of Flynn Gold Projects
Page 11 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Competent Person Statement
The information in this ASX Announcement that relates to Exploration Results is based on information
compiled by Mr Sean Westbrook, a Competent Person who is a Member of the Australian Institute of
Geoscientists. Mr Westbrook is a consultant to Flynn Gold and is a shareholder in Flynn Gold. Mr
Westbrook has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’. Mr Westbrook consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
This announcement includes information that relates to Exploration Results prepared and first disclosed
under the JORC Code (2012) and extracted from the Company’s previous ASX announcements as
noted, and the Company’s Prospectus dated 30 March 2021. Copies of these announcements are
available from the ASX Announcements page of the Company’s website: www.flynnngold.com.au.
The Company confirms that it is not aware of any new information or data that materially affects the
information included within the Prospectus dated 30 March 2021.
Forward Looking and Cautionary Statements
Some statements in this announcement regarding estimates or future events are forward-looking
statements. They include indications of, and guidance on, future earnings, cash flow, costs and financial
performance. Forward-looking statements include, but are not limited to, statements preceded by words
such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”,
“believes”, “potential”, "predict", "foresee", "proposed", "aim", "target", "opportunity", “could”, “nominal”,
“conceptual” and similar expressions. Forward-looking statements, opinions and estimates included in
this report are based on assumptions and contingencies which are subject to change without notice, as
are statements about market and industry trends, which are based on interpretations of current market
conditions. Forward-looking statements are provided as a general guide only and should not be relied
on as a guarantee of future performance. Forward-looking statements may be affected by a range of
variables that could cause actual results to differ from estimated or anticipated results and may cause
the Company’s actual performance and financial results in future periods to materially differ from any
projections of future performance or results expressed or implied by such forward-looking statements.
So, there can be no assurance that actual outcomes will not materially differ from these forward-looking
statements.
Page 12 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
JORC Code Table 1 for Exploration Results –
Golden Ridge Project Drilling
Section 1: Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g.
cut channels, random chips, or
specific specialised industry standard
measurement tools appropriate to
the minerals under investigation,
such as downhole gamma sondes, or
handheld XRF instruments, etc.).
These examples should not be taken
as limiting the broad meaning of
sampling.
The sampling described in this report refers to diamond (DD) drilling.
Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used.
Sampling is guided by Flynn’s protocols and Quality Control
procedures, as per industry standards.
Samples were all collected by qualified geologists or under geological
supervision.
The samples are judged to be representative of the rock being drilled.
The nature and quality of sampling is carried out under QAQC
procedures as per industry standards.
Diamond core is sampled to geological boundaries with sample
lengths generally between 0.3m and 2.0m.
The core is cut on site and half core sampled. The remaining half core
is stored on site.
Care is taken when sampling the diamond core to sample the same
half side of the core as standard practice.
During sampling of the diamond drill core, certified reference material
(CRM) standards are inserted at least every 20 samples. Blank samples
are also inserted at least every 20 samples. Duplicate samples are
routinely submitted and checked against originals.
Aspects of the determination of
mineralisation that are Material to
the Public Report.
Whole samples were pulverised and split to produce a 50g charge for
fire assay (ALS Au-AA26 method).
All samples are pulverised to nominal 85% passing 75 microns before
being split for analyses.
Coarse gold was observed in some drill core intervals. Additional
sampling using various techniques and duplicate samples is ongoing to
allow an assessment of any sampling issues. Current results appear to
be consistent with historical drilling assay results associated with
coarse visible gold.
Drilling
techniques
Drill type (e.g. core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core
diameter, triple or standard tube,
depth of diamond tails, facesampling bit or other type, whether
core is oriented and if so, by what
method, etc.).
Drilling is undertaken by diamond core technique at triple tube PQ3
(83.1mm diameter),HQ3 (61.1mm diameter), and NQ3 (42mm) core
sizes.
Industry standard diamond drilling techniques are used.
HQ core is orientated using a Boart Longyear Truecore UPIX core
orientation system or similar.
Hole traces are surveyed using a digital down-hole survey camera tool.
The location of each hole was recorded by handheld GPS with
positional accuracy of approximately +/-5m. Location data was
collected in MGA94 zone 55.
Drill holes are planned to intersect mineralisation at an optimum
angle.
Drill sample
recovery
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Core recovery was logged and recorded in the company’s database.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Triple tube diamond core drilling techniques are used.
The core recovery is logged for each run of drilling and measured
against the drilled length.
Page 13 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code explanation
Commentary
Generally, sample weights are comparable, and any bias is considered
negligible.
Logging
Whether a relationship exists
between sample recovery and grade
and whether sample bias may have
occurred due to preferential
loss/gain of fine/coarse material.
No relationship has been noticed between sample recovery and grade.
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
All diamond core holes are geologically logged in full for core recovery,
RQD, geotechnical parameters, weathering, oxidation, lithology,
grainsize, alteration, mineralisation, vein types and vein intensity,
structure, and magnetic susceptibility.
The geological logging was done using a standardised logging system.
This information and the sampling details were transferred into Flynn
Gold’s drilling database.
The geological and geotechnical logging is considered to be completed
to a sufficient level to support appropriate future geological, Mineral
Resource estimation, mining, and metallurgical studies.
Subsampling
techniques
and sample
preparation
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
Logging is both qualitative and quantitative in nature.
The total length and percentage of
the relevant intersections logged.
All drill holes are logged in full and to the total length of each hole.
If core, whether cut or sawn and
whether quarter, half or all core
taken.
The core is cut on site and half core sampled. The remaining half core
is stored on site.
Drill core is photographed as wet and dry, and before (full core) and
after cutting (half core).
Care is taken when sampling the diamond core to sample the same
half side of the core as standard practice.
Large diameter core drilling (PQ, HQ) is utilised to maximise recovery
and obtain larger samples to maximise representivity of samples.
If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
N/A for DD drilling
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
Samples were transported by road to ALS Global’s laboratory in
Adelaide, South Australia.
The sample preparation for all samples follows industry best practice.
At the laboratory all samples are weighed, dried, crushed and
pulverised (to 85% passing 75 microns) prior to sub-sampling for
assay.
Standardised equipment used with QC performed at the pulverisation
stage at the labs.
Quality control procedures adopted
for all subsampling stages to
maximise representivity of samples.
Flynn Gold has protocols that cover the sample preparation at the
laboratories and the collection and assessment of data to ensure that
accurate steps are used in producing representative samples.
The crusher and pulveriser are flushed with barren material at the
start of every batch.
Measures taken to ensure that the
sampling is representative of the insitu material collected, including for
instance results for field
duplicate/second-half sampling.
Sampling is carried out in accordance with Flynn Gold’s protocols as
per industry best practice.
Field QC procedures involve the use of certified reference material as
assay standards and blanks, as well as coarse crush duplicates.
For analysis of diamond core, CRM standards and blanks are inserted
by the field Geologist at intervals accounting for 7 to 10% of total
samples which is considered to be to industry standards.
CRM results over low-, moderate-, and high-grade gold ranges indicate
acceptable levels of accuracy and precision of assay batch results.
Page 14 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
Quality of
assay data
and
laboratory
tests
JORC Code explanation
Commentary
Whether sample sizes are
appropriate to the grain size of the
material being sampled.
Sample sizes are considered appropriate for the style of mineralisation
sought.
The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
All rock and drill core samples are sent to ALS (Adelaide) for sample
preparation and sub-sampling prior to being on-sent to ALS
Townsville, Brisbane, or Perth laboratories for assay.
All drill core samples are analysed for gold by fire assay (50-gram
charge) with an AAS finish (ALS method code Au-AA26). Over-range
gold samples are re-assayed using a gravimetric finish These
techniques are considered total in nature and is an industry standard
technique.
Multielement assaying done on selected samples. ALS method code
ME-MS61. This is a four-acid digest with ICP-MS finish.
Flynn Gold has its own internal QAQC procedure involving the use of
certified reference material (CRM) standards, blank (non-mineralised)
materials, and duplicate samples.
ALS laboratories are accredited to ISO/IEC standards.
External laboratory checks have not been used to date.
Verification
of sampling
and assaying
For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the parameters
used in determining the analysis
including instrument make and
model, reading times, calibrations
factors applied and their derivation,
etc.
No geophysical tools were used to determine any element
concentrations
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory
checks) and whether acceptable
levels of accuracy (i.e. lack of bias)
and precision have been established.
Sample preparation checks for fineness were carried out by the
laboratory as part of their internal procedures to ensure the grind size
of 90% passing 75 microns.
Internal laboratory QAQC checks are reported by the laboratory.
Review of the internal laboratory QAQC suggests the laboratory is
performing within acceptable limits.
The verification of significant
intersections by either independent
or alternative company personnel.
All reported data was subjected to validation and verification by
company personnel prior to reporting.
The use of twinned holes.
Flynn Gold is yet to twin any of the historical drill holes. However,
confirmation drilling is being carried out within close proximity to
previous drillholes to verify historical drilling grade and widths.
Documentation of primary data,
data entry procedures, data
verification, data storage (physical
and electronic) protocols.
Primary data is collected both manually onto paper logging forms and
digitally using a field laptop computer using in-house logging codes.
The data is checked and verified prior to entering into a master
database.
Flynn Gold has done sufficient verification of the data, in the
Competent Person’s opinion to provide sufficient confidence that
sampling was performed to adequate industry standards and is fit for
the purpose of planning exploration programs and generating targets
for investigation.
Location of
data points
Discuss any adjustment to assay
data.
All original drilling and logging records are kept on file.
Accuracy and quality of surveys used
to locate drillholes (collar and
downhole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation.
Drill hole collars are pegged before drilling and surveyed using a
handheld GPS to a lateral accuracy of +/-5m.
No adjustments have been made to any of the assay data.
Final collar locations are surveyed again upon completion of drilling.
A Mineral Resource estimate has n
Share your feedback
Discover