More Firetower Shallow High-Grade Gold-Tungsten Intercepts
Released
Released
Announcement PDF
JOIN FLYNN GOLD’S INTERACTIVE INVESTOR HUB to interact
with Flynn’s announcements and updates by asking questions or
making comments which our team will respond to where possible
ASX Announcement
24 March 2026
ASX: FG1
ABN 82 644 122 216
CAPITAL STRUCTURE
Share Price: A$0.020
Cash (31/12/25): A$3.45M
Debt: Nil
Ordinary Shares: 608.6M
Market Cap: A$12.2M
Options
Listed (FG1O): 50.6M
Listed (FG1OA): 118.7M
Unlisted Options: 65.5M
BOARD OF DIRECTORS
Clive Duncan
Non-Executive Chair
Neil Marston
Managing Director and CEO
Sam Garrett
Technical Director
John Forwood
Non-Executive Director
COMPANY SECRETARY
Mathew Watkins
CONTACT
Suite 2, Level 11
385 Bourke Street
Melbourne VIC 3000
info@flynngold.com.au
www.flynngold.com.au
More Shallow High-Grade Gold-
Tungsten Intercepts at Firetower
Follow-up drilling to commence next quarter
Highlights
• Latest assaying results from re-sampling of historical drill core
confirms shallow high-grade gold-tungsten mineralisation including:
2019FTD011
10.0m @ 2.64g/t Au, 0.19% WO3 from 63.0m, including:
o 4.0m @ 2.75g/t Au, 0.46% WO3, 0.07% Co, 0.02% Cu from 69.0m
2019FTD012
17.0m @ 1.65g/t Au, 0.17% WO3 from 76.0m, including:
o 2.0m @ 2.41g/t Au, 0.58% WO₃, 0.17% Co, 0.18% Cu from 78m,
and
o 2.0m @ 4.09g/t Au, 0.55% WO₃, 0.04% Co, 0.12% Cu from 88
• The mineralised intersections in 2019FTD011 and 2019FTD012 are up-
dip of previously reported high-grade polymetallic mineralisation1
, which
extends to a depth of approximately 150 metres from surface, including:
2019FTD007E
17.0m @ 2.3g/t Au, 0.73% WO₃, 0.16% Co, 0.16% Cu from 121.0m,
including:
o 1.7m @ 6.64g/t Au, 1.08% WO3, 0.13% Co, 0.14% Cu
o 3.8m @ 2.18g/t Au, 0.88% WO3, 0.27% Co, 0.10% Cu, and
o 5.5m @ 3.27g/t Au, 0.61% WO3, 0.24% Co, 0.33% Cu
• Latest results support the continuity of high-grade polymetallic
mineralisation and validate the use of a more accurate analytical
technique to determine tungsten grades in mineralised zones
• Mineral Resource modelling underway with technical support from
independent consultants, SRK Consulting (Australasia) Pty Ltd
• Follow-up drilling program to test depth extensions of high-grade
gold-tungsten zone approved by Mineral Resources Tasmania
• Drilling planned to commence in Q2 2026 with results to feed into
maiden Mineral Resource Estimate
• For further information or to post questions, go to the Flynn Gold Investor
Hub at https://flynngold.com.au/link/epQaXr
1
See FG1 ASX Announcement dated 30 October 2025 for full details
Page 2 of 14 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Flynn Gold Limited (ASX: FG1, “Flynn” or “the Company”) is pleased to report new exploration
results from the Company’s 100%-owned Firetower Gold-Tungsten Project, located in northwest
Tasmania (see Figure 3).
The re-sampling and assaying of selected drill holes using a more accurate laboratory technique
to determine tungsten grades in mineralised zones has continued to prove effective, with drill holes
2019FTD011 and 2019FTD012 recording assays of greater than 0.5% WO3.
The intercept for drill hole 2019FTD011 is shown together with other historical intercepts in the
cross-section below (Figure 1), as well as the planned extension to drill hole 2019FTD014, one of
three drill hole extensions planned to test for high-grade mineralisation at depth.
Figure 1 –Cross Section with preliminary 3D model of the Firetower Prospect (looking east)
Page 3 of 14 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Managing Director and CEO, Neil Marston commented:
“The Firetower Gold-Tungsten Project in Tasmania is shaping up as an exciting opportunity for the
Company at a time when demand for tungsten has seen the price of the critical metal skyrocket by
more than 500% in the last 12 months.
“Over the next few months, we intend to undertake further drilling to test the depth extensions of
the deposit, which has barely been tested below 100 metres from surface. The deposit sits within
the prolific Mount Read Volcanic Sequence, which hosts multiple world-class polymetallic mines
such as Rosebery and Mt Lyell.
“At Firetower we have significant indications of gold and tungsten as well as cobalt, copper and
zinc mineralisation close to surface over a six-kilometre zone. Our next drilling program will be
designed to test depth extensions of the mineralised zone, which has the potential to significantly
extend the scale of the mineralised system.
“The Company is progressing technical work aimed at assessing the potential to deliver a maiden
Mineral Resource Estimate as soon as possible this year, which will put us in a much stronger
position to talk about the potential scale of the project to financiers and investors.”
Historical Drill Core Re-Sampling
The latest assay results are from resampled drill core selected from 11 historical drill holes. Many
of these samples had not been assayed previously for tungsten and were undertaken to increase
completeness in the database and assist in improving the geological model for the Firetower
deposit.
The new assay results were derived from quarter-core sampling of the remaining TT46, NQ or HQ
half-core at the Department of State Growth core storage facility in Hobart.
Samples were re-assayed using lithium borate fusion followed by the X-ray fluorescence process
(XRF15b method), which provides a total digest suitable for scheelite and other tungsten-bearing
minerals, thereby enabling more accurate determination of tungsten grades in mineralised zones.
The resampled drill hole details are shown in Table 1 and significant resampling results together
with the original Au and WO3 assay results are shown in Table 2. The location of mineralised
intercepts for holes 2019FTD011 and 2019FTD012 are shown in Figure 2.
Encouragingly when the latest assays for holes 2019FTD011 and 2019FTD012 are compared with
historical tungsten assays, the latest results were generally significantly higher, validating the new
assay method as a more reliable technique.
The mineralisation at Firetower remains open both along strike and at depth, as shown by selected
historical intercepts in Figure 2, highlighting the scope for extensions through future drilling.
Next Steps
Resource Assessment
The Company has engaged reputable global consulting group SRK Consulting (Australasia) Pty
Ltd to provide technical support, specifically in:
1. The provision of modelling assistance to Flynn staff (geology and estimation); and
2. Making recommendations for future work requirements to generate a Mineral Resource
Estimate for the project.
Page 4 of 14 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Figure 2 - Firetower Prospect Drill Hole Location Plan.
Metallurgical Testwork
The Company expects that a program of metallurgical testwork including some petrology will be
required to enable the Mineral Resource Estimate to be completed.
Flynn staff are engaging with external consultants to define the scope of this work and the amount
of samples required.
Diamond Drilling
Drilling permits have been received from Mineral Resources Tasmania (MRT) to extend three of
the 2019 drill holes (see Figure 2), with the aim of targeting high-grade mineralisation at a depth of
approximately 200m from surface as shown in Figure 1.
A recent site visit identified additional locations from which further drilling can be undertaken
following completion of the first three drill holes without the need for significant site works.
The drilling program is planned to commence in the second quarter of 2026.
Page 5 of 14 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Firetower Project Background
The Firetower Project (EL26/2004) is located in northwest Tasmania, Australia, and covers an area
of 62 square kilometres.
The project lies in the north-eastern end of the highly mineralised Mt Read volcanic sequence,
which hosts major polymetallic base metals and gold deposits such as Hellyer and Rosebery,
copper-gold deposits such as Mt Lyell and the Henty gold mine (Figure 3)
Figure 3 – Location of Flynn Gold’s NW Tasmanian Projects
Page 6 of 14 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Historical exploration in the Firetower Project area, beginning in the 1970s, was largely gold
focused. Anomalous cobalt and tungsten were noted by previous explorers but generally not
followed up due to the gold-focused exploration models applied at the time.
Inconsistent sampling protocols and assay techniques over several historical drilling campaigns
led to large gaps in the understanding of the distribution and nature of the polymetallic
mineralisation at Firetower.
The polymetallic Au-Co-W-Cu mineralisation at the Firetower Prospect is currently defined over a
strike length of 250m and to depths of 150m from surface (open).
The prospect is situated within a highly prospective 6km-long trend between the Firetower West
and Firetower East prospects (Figure 4).
Figure 4 – Firetower Project Simplified Geology and Gold Prospects
These latest assay results continue to demonstrate the polymetallic nature of the mineralisation at
Firetower, with the critical metals tungsten, cobalt and copper occurring with gold and potentially
representing valuable co-products beyond its established gold endowment.
Page 7 of 14 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Importance of Cobalt and Tungsten
Tungsten is considered one of the most critical minerals due to its importance across a wide range
of applications in various fields and its inability to be substituted in many of these applications due
to its high melting point and hardness.
Global tungsten demand has been rising due to supply side constraints after China initiated export
controls in early 2025, driving price growth up by more than 500% in the last 12 months.
Cobalt is another critical mineral with increasing demand as a key manufacturing component in the
global shift toward clean technologies. With approximately 70 percent of global cobalt production
coming from the Democratic Republic of Congo (DRC), the world is seeking alternative sources of
this battery metal, particularly from Tier-1 jurisdictions with strong ESG credentials such as
Australia.
In October 2025 the government of the DRC imposed a quota system that will govern mined output
and exports until at least 2027.
The association of gold with these metals adds significant potential value to the project, broadening
its economic and strategic importance.
Approved by the Board of Flynn Gold Limited.
For more information contact:
Neil Marston
Managing Director & CEO
+61 3 9692 7222
info@flynngold.com.au
Nicholas Read
Media & Investor Relations
+61 (0) 419 929 046
nicholas@readcorporate.com.au
Page 8 of 14 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Appendix I
Table 1: Re-sampled drill hole collar details (this announcement), Firetower prospect
Hole ID
Hole
Type
Hole Depth
(m)
Easting Northing RL Dip
Azimuth
UTM
GP-90-03 DD 24.6 446029 5405287 599 -65 89
GP-90-05 DD 30.3 446092 5405339 632 -50 174
GP-90-07 DD 30.95 446095 5405294 634 -51 174
GP-90-17 DD 30.35 445991 5405264 560 -55 174
FTD004 DD 153 446048 5405241 591 -45 354
FTD005 DD 108.1 446118 5405255 628 -20 360
FTD006 DD 117 446141 5405259 637 -45 360
FTD007 DD 107.5 446086 5405252 613 -15 360
FTD011 DD 138.7 445966 5405223 538 -30 360
2019FTD011 DD 86.2 446125 5405275 635 -60 360
2019FTD012 DD 142.7 446152 5405253 640 -60 360
Table 2: Significant Polymetallic Mineralised Intercepts for Firetower Re-Sampled Drill Holes
Hole ID
From
(m)
To
(m)
Interval
(m)
Au g/t WO3 %
Co % Cu %
Original Latest Original Latest
2019FTD011 63 73 10.0 3.12 2.64 0.12 0.19 0.1 0.08
Including 69 73 4.0 3.47 2.75 0.29 0.46 0.07 0.02
2019FTD012 76 93 17.0 1.51 1.65 0.07 0.17 0.05 0.07
Including 78 80 2.0 2.21 2.41 0.24 0.58 0.17 0.18
and 88 90 2.0 2.99 4.09 0.13 0.55 0.04 0.12
GP-90-03 24.0 24.6 0.6(EOH) 0.65 0.88 - 0.138 0.02 0.01
GP-90-05 20.0 21.0 1.0 3.75 1.76 - 0.126 0.24 0.03
GP-90-07 27.0 28.0 1.0 0.64 0.77 - 0.233 0.02 0.01
GP-90-17 18.0 29.0 No Significant Tungsten Interval
FTD004 45.0 46.0 1.0 1.31 2.86 - 0.144 0.05 <0.005
FTD005 38.0 55.0 No Significant Tungsten Interval
FTD006 32.0 40.0 No Significant Tungsten Interval
FTD007 72.0 73.0 1.0 0.64 0.85 - 0.187 0.01 0.04
FTD011 44.0 45.0 1.0 0.77 1.35 - 0.220 0.19 0.27
63.0 65.0 2.0 1.70 1.10 - 0.297 0.32 0.31
Page 9 of 14 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
About Flynn Gold
Flynn Gold is an Australian mineral exploration company with a portfolio of projects in Tasmania (see Figure
5) The Company has ten 100% owned tenements located in northeast Tasmania which are highly
prospective for gold as well as tin/tungsten.
The Company also has the Henty zinc-lead-silver project on Tasmania’s mineral-rich west coast and the
Firetower gold and critical metals project located in northern Tasmania.
Flynn has also established a portfolio of gold-lithium exploration assets in the Pilbara and Yilgarn regions of
Western Australia.
For further information regarding Flynn Gold please visit the ASX platform (ASX: FG1) or the Company’s
website www.flynngold.com.au.’
Figure 5 – Location of Flynn Gold tenements in Tasmania.
Page 10 of 14 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
In accordance with Listing Rule 5.23.2, the Company confirms in this subsequent public report that it is
not aware of any new information or data that materially affects the information included in any previous
market announcements.
Competent Person Statement
The information in this ASX Announcement that relates to Exploration Results is based on information
compiled by Mr Sean Westbrook, a Competent Person who is a Member of the Australian Institute of
Geoscientists. Mr Westbrook is a consultant to Flynn Gold and is a shareholder in Flynn Gold. Mr
Westbrook has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a Competent Person as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves’. Mr Westbrook consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
This announcement includes information that relates to Exploration Results prepared and first disclosed
under the JORC Code (2012) and extracted from the Company’s previous ASX announcements as
noted, and the Company’s Prospectus dated 30 March 2021. Copies of these announcements are
available from the ASX Announcements page of the Company’s website: www.flynnngold.com.au.
Forward Looking and Cautionary Statements
Some statements in this announcement regarding estimates or future events are forward-looking
statements. They include indications of, and guidance on, future earnings, cash flow, costs and financial
performance. Forward-looking statements include, but are not limited to, statements preceded by words
such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”,
“believes”, “potential”, "predict", "foresee", "proposed", "aim", "target", "opportunity", “could”, “nominal”,
“conceptual” and similar expressions. Forward-looking statements, opinions and estimates included in
this report are based on assumptions and contingencies which are subject to change without notice, as
are statements about market and industry trends, which are based on interpretations of current market
conditions. Forward-looking statements are provided as a general guide only and should not be relied
on as a guarantee of future performance. Forward-looking statements may be affected by a range of
variables that could cause actual results to differ from estimated or anticipated results and may cause
the Company’s actual performance and financial results in future periods to materially differ from any
projections of future performance or results expressed or implied by such forward-looking statements.
So, there can be no assurance that actual outcomes will not materially differ from these forward-looking
statements.
References
FG1: ASX Announcement dated 1 December 2022
FG1: ASX Announcement dated 5 June 2023
FG1: ASX Announcement dated 27 October 2023
FG1: ASX Announcement dated 22 January 2024
FG1: ASX Announcement dated 26 March 2024
FG1:ASX Announcement dated 1 October 2025
FG1:ASX Announcement dated 30 October 2025
Page 11 of 14 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
JORC Code Table 1 for Exploration Results – Firetower Project
Section 1: Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as downhole
gamma sondes, or handheld XRF instruments, etc.).
These examples should not be taken as limiting the
broad meaning of sampling.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that
are Material to the Public Report.
Sampling relates to re-sampling of historical diamond
drill core from the MRT core library (Tasmania).
Quarter-core samples were collected from TT46, NQ
and HQ core over selected intervals.
Sampling intervals (0.3m to 1.3m) were defined by
geological boundaries.
Sampling is considered representative of the
mineralised zones.
Tungsten was analysed using XRF15b, a total digest
method appropriate for scheelite-bearing
mineralisation.
Samples are considered representative of the
mineralised intervals. All samples were collected by
qualified geologists or under geological supervision.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc.)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc.).
Historical drilling was completed using diamond core
methods (TT46, NQ and HQ).
Core orientation and use of triple tube are not
recorded.
Drill sample
recovery
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
No detailed recovery records are available.
Visual inspection indicates generally good recovery.
Comparable drilling at the project typically achieved
95–100% recovery.
No relationship between recovery and grade has been
identified.
Logging Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
All relevant drill core was logged for lithology,
alteration, mineralisation and veining.
Logging is qualitative and supported by core
photography.
Logging is considered sufficient to support geological
interpretation and future Mineral Resource studies.
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter,
half or all core taken.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all
subsampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Core was cut using a core saw and quarter-core samples
collected.
Sample intervals were typically 0.5–1.0m and
constrained by geological boundaries.
Sample preparation followed industry standard
procedures.
Sample sizes are considered appropriate for the style of
mineralisation.
No field duplicates were collected due to limited core
availability.
Page 12 of 14 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Criteria JORC Code explanation Commentary
Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in
determining the analysis including instrument make
and model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
Samples were analysed at ALS Burnie for Au by fire
assay (AU-AA26) and for multi-elements including W by
XRF15b (lithium borate fusion).
The XRF15b method provides total digestion suitable
for tungsten-bearing minerals.
QA/QC included insertion of certified reference
materials and blanks at regular intervals.
Results demonstrate acceptable accuracy and
precision.
Verification
of sampling
and assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
Discuss any adjustment to assay data.
Significant intersections have been reviewed by
company personnel and the Competent Person.
Assay data was received directly from the laboratory
and stored in a validated database.
No adjustments have been made other than conversion
of W to WO₃ and length-weighted averaging.
No twinned holes have been completed.
Location of
data points
Accuracy and quality of surveys used to locate
drillholes (collar and downhole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Drill hole collars were surveyed using GNSS methods
referenced to MGA94 Zone 55.
Downhole surveys were completed using electronic
survey tools at regular intervals, generally every 30m or
less.
Survey accuracy is considered adequate for exploration
reporting.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
Whether sample compositing has been applied.
Drill hole spacing is variable, typically ~40m on section.
Data spacing is insufficient to establish Mineral
Resource continuity.
No compositing has been applied.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
Mineralisation is interpreted to be steeply dipping.
Drill hole orientations are considered appropriate for
initial testing.
True widths are not yet well constrained and no sampling
bias is currently identified.
Sample
security
The measures taken to ensure sample security. Samples were transported to ALS under chain-of-
custody procedures.
Sample receipt and verification were completed by the
laboratory.
Sample tracking is recorded digitally.
Audits or
reviews
The results of any audits or reviews of sampling
techniques and data.
No external audits have been completed.
Internal review of historical data and sampling is ongoing.
Page 13 of 14 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Section 2: Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
The Firetower Project is located within EL26/2004, an
exploration licence held by awholly owned subsidiary of Flynn
Gold Limited.
Flynn Gold is not aware of any impediments to exploration.
Exploration
done by
other parties
Acknowledgment and appraisal of exploration
by other parties.
The project has been explored since the 1970s, including
mapping, geochemistry, geophysics and drilling.
A total of 131 drill holes (~10,215m) have been completed.
Historical programs did not consistently assay tungsten,
cobalt or copper.
The Competent Person considers the data suitable for
exploration targeting but requires further validation.
Geology Deposit type, geological setting and style of
mineralisation.
The Firetower Project lies in the central north of Tasmania
within equivalents of the Mt Read Volcanics.
Mineralisation comprises polymetallic Au-Co-W-Cu hosted in
altered volcaniclastic rocks.
Mineralisation occurs as veins, breccias and replacements
with associated sulphides.
The system may be intrusive-related but remains under
investigation.
Drillhole
information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drillholes:
• easting and northing of the drillhole collar
• elevation or RL (Reduced Level – elevation
above sea level in metres) of the drillhole
collar
• dip and azimuth of the hole
• downhole length and intersection depth
• hole length.
If the exclusion of this information is justified on
the basis that the information is not Material
and this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
Relevant drill hole collar details and intercepts are reported
in Tables 1 and 2.
Information provided is considered sufficient for
understanding the reported results.
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
Where aggregate intersections incorporate
short lengths of high-grade results and longer
lengths of low-grade results, the procedure used
for such aggregation should be stated and some
typical examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Intercepts are reported as length-weighted averages.
A cut-off of 0.3 g/t Au with ≥0.1% Co and/or ≥0.1% WO₃ has
been applied.
Internal dilution of up to 5m has been allowed where
geological reasonable.
No top-cutting has been applied and no metal equivalents are
reported.
Page 14 of 14 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Criteria JORC Code explanation Commentary
Relationship
between
mineralisation
widths and
intersection
lengths
These relationships are particularly important in
the reporting of Exploration Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the downhole lengths
are reported, there should be a clear statement
to this effect (e.g. “downhole length, true width
not known”).
Downhole lengths are reported.
True widths are not known but are estimated to be
approximately 75–95% of reported intervals.
Diagrams Appropriate maps and sections (with scales) and
tabulations of intersections should be included
for any significant discovery being reported
These should include, but not be limited to a
plan view of drill hole collar locations and
appropriate sectional views.
Appropriate maps, sections and drill hole location plans are
included to support interpretation of results.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
The Company considers the results to be reported in
Share your feedback
Discover