High-Grade Gold-Cobalt-Tungsten in Firetower Drillcore
Released
Released
Announcement PDF
ASX Announcement
1 October 2025
Firetower Project, NW Tasmania
High-Grade Gold-Cobalt-Tungsten
Identified in Historical Drillcore
Highlights
ASX: FG1
ABN 82 644 122 216
•
High-grade polymetallic gold-cobalt-tungsten intercept confirmed
from re-sampling of a historical drill-hole at Firetower Project
•
Assays from re-sampling of hole FTD041, which was not assayed for
cobalt when drilled in 2012, include:
CAPITAL STRUCTURE
Share Price: A$0.024
Cash (11/09/25): A$0.58M
Debt: Nil
Ordinary Shares:391.3M
•
Market Cap: A$9.4M
Options
Listed (FG1O): 50.6M
BOARD OF DIRECTORS
Clive Duncan
Non-Executive Chair
Neil Marston
The results highlight the potential for polymetallic gold, tungsten and
cobalt mineralisation to extend along strike and at depth at Firetower
•
Based on these results re-sampling and assaying of historical drill
core from four additional holes which were never tested for cobalt
and tungsten has commenced aimed at further assessing the project’s
critical mineral potential with assays pending
•
Firetower is owned 100% by Flynn and is located in NW Tasmania with
excellent access to mining services and infrastructure
•
Cobalt and tungsten are classified as “critical metals” essential for the
global energy transition
•
For further information or to post questions go to the Flynn Gold Investor
Hub at https://flynngold.com.au/link/y5awXy
Technical Director
John Forwood
Non-Executive Director
COMPANY SECRETARY
Mathew Watkins
CONTACT
Suite 2, Level 11
385 Bourke Street
Melbourne VIC 3000
info@flynngold.com.au
www.flynngold.com.au
17.0m @ 2.31g/t Au, 0.16% Co, 0.38% WO3, 0.16% Cu from
121.0m, including:
o 1.7m @ 6.64g/t Au, 0.12% Co, 0.87% WO3, 0.14% Cu from
121.0m and
o 5.5m @ 3.27g/t Au, 0.24% Co, 0.53% WO3, 0.33% Cu from
132.5m
•
Managing Director and CEO
Sam Garrett
The intercept in FTD041 is located approximately 80m down-plunge of
extension drill-hole 2019FTD007E, drilled by the Company during
2023, which intersected (previously reported1):
Unlisted Options: 65.5M
1.4m @ 2.23g/t Au, 0.58% Co, 1.31% WO₃ and 0.07% Cu from
221.1m, within a broader interval of:
10.0m @ 0.62g/t Au, 0.22% Co, 0.29% WO₃ and 0.08% Cu from
216.0m
1 See FG1 ASX Announcement dated 22 January 2024 for full details
JOIN FLYNN GOLD’S INTERACTIVE INVESTOR HUB
to interact with Flynn’s announcements and updates
by asking questions or making comments which our
team will respond to where possible
Flynn Gold Limited (ASX: FG1, “Flynn” or “the Company”) is pleased to report significant
initial assay results from re-sampling of historical drill core at the Company’s 100%-owned
Firetower Project, located in northwest Tasmania (see Figure 1).
Managing Director and CEO, Neil Marston commented:
“The re-assay of historical drill core has delivered a strong gold-cobalt-tungsten intercept that
confirms the depth continuity of the known mineralisation at Firetower. Importantly, these
results reinforce the polymetallic nature of the system, with the significant critical metals
tungsten and cobalt observed with gold. With the mineralisation remaining open both along
strike and at depth, Firetower represents a highly prospective project with strong growth and
value potential.
“Our program of re-assaying historical core for critical metals re-commenced last month with
four more holes re-sampled which were never tested for cobalt and tungsten. The results of
this work will add valuable new information, and we look forward to reporting further results
from this low-cost activity in due course.”
Figure 1 – Location of Flynn Gold’s NW Tasmanian Projects
Page 2 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
FTD041 Re-Sampling
FTD041, drilled by Greatland Gold Plc during 2012, was selected for priority re-sampling due
to it being identified as a possible “near-miss” hole based on historical sampling with
incomplete historical assaying for cobalt.
The new assay results are derived from quarter core sampling of the remaining half-core kept
at the Department of State Growth core library in Hobart.
The assays from drill-hole FTD041 represent the first results from a program of re-sampling
historical drill core at Firetower, aimed at assessing and advancing the Project’s critical mineral
potential.
The re-sampling was carried out over a continuous down-hole interval between 170 metres to
240 metres and returned a significant polymetallic intercept of:
•
1.4m @ 2.23g/t Au, 0.58% Co, 1.31% WO₃ and 0.07% Cu from 221.1m
within a broader zone of:
•
10.0m @ 0.62g/t Au, 0.22% Co, 0.29% WO₃ and 0.08% Cu from 216.0m.
Original assay results from the same FTD041 interval was 10m @ 0.37g/t Au, 0.13% WO3 and
0.08% Cu from 216.0m with no assay for cobalt 2.
The re-sampled intercept is interpreted to represent an 80m continuation of gold-cobalttungsten mineralisation extending down-plunge of Flynn’s previously announced extensional
hole 2019FTD007E, which returned:
•
17.0m @ 2.31g/t Au, 0.16% Co, 0.38% WO3, 0.16% Cu from 121.0m, including:
o
1.7m @ 6.64g/t Au, 0.12% Co, 0.87% WO3, 0.14% Cu from 121.0m; and
o
5.5m @ 3.27g/t Au, 0.24% Co, 0.53% WO3, 0.33% Cu from 132.5m,
strengthening confidence in the depth continuity of the Firetower system where FTD041 was
previously interpreted 3 as a possible “near-miss” hole (see Figure 4 and Figure 5).
The re-assay results from drill-hole FTD041 represent the first results from a program of resampling historical drill core at Firetower, aimed at assessing and advancing the Project’s
critical mineral potential.
Furthermore, these latest results continue to demonstrate the polymetallic nature of the
mineralisation at Firetower, with the critical metals tungsten, cobalt and copper occurring with
gold and potentially representing valuable co-products beyond its established gold
endowment.
2 Evans, D.A. 2012. Exploration Licence 26/2004 Firetower Annual Report for Period 26 November 2011 to 25
November 2012. Unity Mining Limited. MRT open file report 13_6670
3 See FG1 ASX Announcement dated 26 March 2024 for full details.
Page 3 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Importantly:
•
Tungsten is classified as a critical metal due to its industrial and strategic applications,
particularly in hardening metals and alloys.
•
Cobalt is a critical metal in the global energy transition, used in battery and Electric
Vehicle supply chains.
•
The association of gold with these metals adds significant potential value to the project,
broadening its economic and strategic importance.
The mineralisation at Firetower remains open along strike and at depth, highlighting the scope
for extensions through future drilling.
Figures 2 and 3 below show examples of the Firetower polymetallic mineralisation in drill core.
Figure 2 – Mineralised carbonate-pyrite-arsenopyrite-cobaltite-scheelite vein (2019FTD007E, 129.8m)
(Interval 129.5-130.0m Assay: 0.5m @ 6.64g/t Au, 0.38% Co, 1.02% WO3, 0.11% Cu).
Figure 3 – Same segment of drill core (2019FTD007E, 129.8m) under ultraviolet light,
highlighting intense Scheelite (CaWO4) mineralisation (blue) (Interval 129.5-130.0m
Assay: 0.5m @ 6.64g/t Au, 0.38% Co, 1.02% WO3, 0.11% Cu).
Page 4 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Figure 4 - Firetower Prospect Drill Hole Location Plan.
Latest Re-Sampling
The results from FTD041 form part of a systematic program of re-sampling historical Firetower
drill core, focused on multiple gold mineralised drill intercepts never previously assayed for
tungsten or cobalt.
Further re-sampling and assaying of selected historical Firetower drill core has commenced
with four historical holes re-sampled at the Department of State Growth’s drill core storage
facility in Hobart last month.
The holes and intervals re-sampled, with gold and multi-element assays pending, are:
•
GP90-01 (0.3-24.7m)
•
GP90-02 (3.0-25.8m)
•
GP90-10 (7.0-30.25m); and
•
FTD40 (132-160m and 198-200m)
Page 5 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Figure 5 – Oblique Cross Section with preliminary 3D model of the Firetower Prospect (looking south),
showing recent and historical drilling with selected significant polymetallic mineralised intercepts, >1g/t
Au grade shell (yellow), and the interpreted Eureka Fault plane (grey).
Drill-hole GP90-10 was one of a series of short (30m) diamond drill-holes completed by
Noranda Pty Ltd in 1990 which recorded a significant intercept of 17m @ 5.37g/t Au from 7
metres, including 3m @ 21.4g/t Au from 10 metres 4 5.
GP90-10 was not assayed for cobalt or tungsten at the time or subsequently.
The re-sampling work is expected to:
•
Provide a more comprehensive understanding of the polymetallic nature of Firetower;
•
Identify new vectors for exploration and drilling follow-up; and
•
Support future resource evaluation and targeting of extensions at depth and along strike.
4 See FG1 ASX Announcement date 1 December 2022 for full details.
5
Jones, P.A. 1991. Exploration Licence No. 10/88 - Gowrie Park Progress Report on Exploration Activity August
1990 to July 1991. Noranda Pty Ltd. MRT open file report 91_3290.
Page 6 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Firetower Project Background
The Firetower Project (EL26/2004) is located in northwest Tasmania, Australia, and covers an
area of 62 square kilometres (Figure 1). The project lies in the north-eastern end of the highly
mineralised Mt Read volcanic sequence, which hosts major polymetallic base metals and gold
deposits such as Hellyer and Rosebery, copper-gold deposits such as Mt Lyell and the Henty
gold mine.
Historical exploration in the Firetower Project area, beginning in the 1970s, has largely been
gold-focused. Anomalous cobalt and tungsten were noted by previous explorers but generally
not followed up due to the gold-focused exploration models applied at the time.
Inconsistent sampling protocols and assay techniques over several historical drilling
campaigns led to large gaps in the understanding of the distribution and nature of the
polymetallic mineralisation at Firetower.
The drilling program completed by Flynn in late 2023, has identified polymetallic Au-Co-W-Cu
mineralisation at the Firetower Prospect which is currently defined over a strike length of 250m
and to depths of 150m from surface (open).
The prospect is situated within a highly prospective 6km-long trend between the Firetower
West and Firetower East prospects (Figure 6).
Figure 6 – Firetower Project Simplified Geology And Gold Prospects
Page 7 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Importance of Cobalt and Tungsten
Cobalt is a critical mineral with increasing demand as a key manufacturing component in the
global shift toward clean technologies. With approximately 70 percent of global cobalt
production coming from the Democratic Republic of Congo, the world will need alternative
sources of this battery metal, particularly from Tier-1 jurisdictions with strong ESG credentials
such as Australia.
Tungsten is considered one of the most critical minerals due to its importance across a wide
range of applications in various fields and its inability to be substituted in many of these
applications due to its high melting point and hardness.
Global tungsten demand has been rising due to supply side constraints after China initiated
export controls earlier in 2025, driving price growth.
Approved by the Board of Flynn Gold Limited.
For more information contact:
Neil Marston
Managing Director & CEO
+61 3 9692 7222
info@flynngold.com.au
Nicholas Read
Media & Investor Relations
+61 (0) 419 929 046
nicholas@readcorporate.com.au
About Flynn Gold
Flynn Gold is an Australian mineral exploration company with a portfolio of projects in Tasmania and Western
Australia (see Figure 7) The Company has ten 100% owned tenements located in northeast Tasmania which are
highly prospective for gold as well as tin/tungsten.
The Company also has the Henty zinc-lead-silver project on Tasmania’s mineral-rich west coast and the Firetower
gold and critical metals project located in northern Tasmania. Flynn has also established a portfolio of gold-lithium
exploration assets in the Pilbara and Yilgarn regions of Western Australia.
For further information regarding Flynn Gold please visit the ASX platform (ASX: FG1) or the Company’s website
www.flynngold.com.au.
Figure 7 – Location Plan of Flynn Gold Projects
Page 8 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Competent Person Statement
The information in this ASX Announcement that relates to Exploration Results is based on information
compiled by Mr Sean Westbrook, a Competent Person who is a Member of the Australian Institute of
Geoscientists. Mr Westbrook is a consultant to Flynn Gold and is a shareholder in Flynn Gold. Mr
Westbrook has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’. Mr Westbrook consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
This announcement includes information that relates to Exploration Results prepared and first disclosed
under the JORC Code (2012) and extracted from the Company’s previous ASX announcements as
noted, and the Company’s Prospectus dated 30 March 2021. Copies of these announcements are
available from the ASX Announcements page of the Company’s website: www.flynnngold.com.au.
Forward Looking and Cautionary Statements
Some statements in this announcement regarding estimates or future events are forward-looking
statements. They include indications of, and guidance on, future earnings, cash flow, costs and financial
performance. Forward-looking statements include, but are not limited to, statements preceded by words
such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”,
“believes”, “potential”, "predict", "foresee", "proposed", "aim", "target", "opportunity", “could”, “nominal”,
“conceptual” and similar expressions. Forward-looking statements, opinions and estimates included in
this report are based on assumptions and contingencies which are subject to change without notice, as
are statements about market and industry trends, which are based on interpretations of current market
conditions. Forward-looking statements are provided as a general guide only and should not be relied
on as a guarantee of future performance. Forward-looking statements may be affected by a range of
variables that could cause actual results to differ from estimated or anticipated results and may cause
the Company’s actual performance and financial results in future periods to materially differ from any
projections of future performance or results expressed or implied by such forward-looking statements.
So, there can be no assurance that actual outcomes will not materially differ from these forward-looking
statements.
References
FG1: ASX Announcement dated 1 December 2022
FG1: ASX Announcement dated 5 June 2023
FG1: ASX Announcement dated 27 October 2023
FG1: ASX Announcement dated 22 January 2024
FG1: ASX Announcement dated 26 March 2024
Page 9 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Appendix I
Table 1: Re-sampled drill hole collar details (this announcement), Firetower prospect
Hole ID
FTD041
Hole
Type
DD
Hole Depth
(m)
409.1
Easting
Northing
RL
Dip
Azimuth
Prospect
446241
5405354
647
-61
223
Firetower
Table 2: Significant Polymetallic Mineralised Intercepts for Firetower Re-Sampled Drillhole
Hole ID
From (m)
To (m)
Interval (m)
Au g/t
Co %
WO3 %
Cu %
FTD041
including
and
216.0
219.1
221.1
226.0
225.0
222.5
10.0
5.9
1.4
0.62
0.89
2.23
0.22
0.29
0.58
0.29
0.48
1.31
0.08
0.09
0.07
Notes:
•
•
•
Significant intercepts for polymetallic (Au-Co-W-Cu) mineralisation in this announcement used a cut-off grade of 0.3g/t
Au with a polymetallic component of at least 0.1% Co and/or 0.1% WO3. Maximum of 2m internal dilution accepted.
Single-element significant mineralised intervals were not calculated.
Reported grades are calculated as length-weighted averages.
Significant mineralised intercepts are reported as downhole lengths, true widths are currently unknown.
Page 10 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
JORC Code Table 1 for Exploration Results – Firetower Project
Section 1: Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised
industry
standard
measurement tools appropriate to the
minerals under investigation, such as
downhole gamma sondes, or handheld
XRF instruments, etc.). These examples
should not be taken as limiting the broad
meaning of sampling.
The sampling described in this report refers to re-sampling of
historical diamond drill core from drill hole FTD041 drilled by
Greatland Gold Plc in 2012. The sampling was carried out on
available half core over a selected downhole interval (170.0240.0m), which was cut and one side of quarter core taken as the
sample.
Include reference to measures taken to
ensure sample representivity and the
appropriate
calibration
of
any
measurement tools or systems used.
All samples were collected by qualified geologists or under
geological supervision. The samples are judged to be
representative of the rock drilled. The nature and quality of the
sampling is carried out under QA/QC procedures as per industry
standards.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
Drilling
techniques
Drill sample
recovery
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc.) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc.).
Historical drilling technique was diamond core. Core was not
oriented, and no use of triple tube is recorded in original drill logs
and reports.
Method of recording and assessing core
and chip sample recoveries and results
assessed.
No core recovery logs are available for historical drill hole FTD041.
However, visual inspection of the drill core prior to re-sampling
indicates that core recovery was generally good and within
acceptable limits.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Logging
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate
Mineral
Resource
estimation,
mining
studies
and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
Sampling results reported in this announcement refer to resampling of NQ sized half core.
Other drill holes at the Firetower prospect with available core
recovery information generally show excellent core recovery,
typically 100% but varying in the range of 95-100%.
Information on measures taken to maximise sample recovery is
not available, however, industry standard procedures were likely
to have been implemented considering the professional standards
of the exploration and drilling companies involved.
Historical drill hole FTD041 was geologically logged for lithology,
alteration, mineralisation, and veining. The core was
photographed.
FTD041 was not geotechnically logged.
Flynn Gold geologists have reviewed historical geological logging
and consider it to have been done to appropriate standards and
levels of accuracy to support future geological and Mineral
Resource estimation studies. Lacking geotechnical information is
likely to preclude use for all mining studies.
Multiple historical drill core from the Firetower prospect is held at
the Mineral Resources Tasmania core library and are available for
inspection. Multiple holes have been inspected by Flynn Gold
Geologists.
Page 11 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code explanation
Commentary
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
Sampling results reported in this announcement refer to resampling of NQ sized half core. The core was cut with an
automated core saw or where core was broken with a hand
operated core saw to keep sample loss to a minimum.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all subsampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Sampling intervals were a minimum of 0.5 m and a maximum of
1.0 m. Where samples were not at 1.0 m, the sample breaks were
constrained
by
geological
structures
(e.g.
lithological/mineralisation boundaries, faults etc). The sample
sizes are considered appropriate for the nature of the
mineralisation, material grain size, and to enable representivity of
samples.
All staff were adequately trained for all sampling steps, with
geologists preparing sample sheets prior to release for cutting and
sampling.
No field duplicate samples were collected due to limited size of
the core available.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
All samples were submitted for preparation at the ALS laboratory
in Burnie and assayed for Au by AU-AA26 (25 g charge fire assay)
and multi-element with rare earths by 4-acid digest and ICP-MS
(MS-ME61r). 4-acid digest (HF-HNO₃-HClO₄-HCl) is a commonly
used method suitable for the dissolution of most silicate, oxide,
and sulphide minerals, however, this digestion is considered a
partial digestion for tungsten (W), particularly where tungsten is
hosted in scheelite (CaWO₄) or other refractory minerals that are
not completely dissolved by four-acid attack under standard
conditions. As such, tungsten assay values from this method are
considered preliminary only and may under-report total tungsten
content in samples containing scheelite or other resistant Wbearing phases.
Quality control procedures included use of certified reference
material (CRM’s) for assay standards and blanks. Standards and
blanks were inserted every 20 samples.
Standards and blanks passed within an acceptable level of
precision and accuracy for the relevant elements, providing
confidence in the precision and accuracy of the assay results for
most elements. However, CRMs used during this program were
not specifically designed to assess digestion efficiency for ore
grade tungsten.
Follow-up and future assay programs are planned to incorporate
ALS method XRF15b (lithium borate fusion followed by XRF) for
tungsten, which provides a total digest suitable for scheelite and
other refractory W-bearing minerals, thereby enabling more
accurate determination of tungsten grades in mineralised zones.
The selected intervals of historic drill core were re-sampled and
re-assayed for gold to assess the reliability of earlier gold
analytical results. Comparison of original and repeat assays
indicates a generally consistent correlation, although some reassayed intervals returned higher gold values than the original
results. This is interpreted to reflect the nuggety nature of gold
mineralisation rather than a systematic analytical bias. Overall,
the QAQC results are considered to demonstrate acceptable
Page 12 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code explanation
Commentary
levels of accuracy and precision for the purposes of reporting
exploration results.
No field duplicates were collected / reported.
Verification
of sampling
and assaying
The
verification
of
significant
intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Significant mineralised intersections in the reported sampling
have been verified by multiple company personnel.
Logging data is recorded on excel templates and stored on
company storage drives. Data is also uploaded to a central
database, that is also backed up offsite. Logging templates contain
restraints to minimise data entry errors, and data is further
validated by database administrators upon transferal to the
central database.
Verified assay data is received directly from the laboratory, and
stored on company storage drives. Assay data is also received by
the database directly from the laboratory.
The assay data has not been adjusted except for the conversion of
W to WO3 (by using a multiplication factor of 1.264) and length
weighted averaging of individual assay results within the broader
mineralised intercepts reported. Tungsten assay results are often
reported as elemental W (tungsten), but industry standards
typically express grades as WO₃ (tungsten trioxide). To convert
between the two, a molecular weight factor is applied. Tungsten
(W) has an atomic weight of 183.84, while WO₃ has a molecular
weight of 231.84. The ratio 231.84 ÷ 183.84 = 1.264.
No twinned holes have been drilled to date.
Location of
data points
Accuracy and quality of surveys used to
locate drillholes (collar and downhole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing
and
distribution
Data spacing for reporting of Exploration
Results.
Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
No new drill holes reported.
Original drill hole collar location was surveyed by professional
surveyors using GNSS (differential GPS precise point positioning)
referenced to an origin at Gog Hill survey control point 232/171.
Coordinates are in MGA94 Zone 55 which is considered
appropriate to enable good quality and adequate topographic
control.
Downhole surveys were conducted generally every 30 m using a
Ranger Discoverer electronic magnetic survey tool operated by
the drill crew.
No new drill holes reported.
Historical drill hole spacing is variable and generally of an ad-hoc
nature. Average spacing between drill holes on sections is ~40m.
A mineral resource has not been determined.
No sample compositing was applied in relation to the reported resampling results.
Whether sample compositing has been
applied.
Page 13 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code explanation
Commentary
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
No new drillholes reported.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
Historical drillhole FTD041 was drilled along section perpendicular to
the general strike of mineralisation at a dip of -61o. The hole
orientation is considered suitable for the purpose of intersecting
the mineralised zone and providing information that
mineralisation is present at depth and down-dip of other drill
holes in the area. While no sampling bias is suspected, there is
presently insufficient information to confirm the true thickness of
the mineralised interval and options for further drilling investigation
are current
Share your feedback
Discover