94.5% Gold Recovery from Metallurgical Tests at Trafalgar
Released
Released
Announcement PDF
ASX Announcement
ASX Announcement
22 November 2023
19 January 2023
94.5% Gold Recovery from
Metallurgical Tests on Trafalgar
Prospect, NE Tasmania
ASX: FG1
ABN 82 644 122 216
Highlights
•
Initial metallurgical tests successfully completed on 26 drill
samples from the 100% owned Trafalgar Prospect in the Golden
Ridge Project
•
Average gold recovery of 94.5% recorded using conventional bottle
roll leaching .
•
Further metallurgical testwork planned
•
Final assays received for Phase 2 drilling program at Trafalgar
Prospect, feeding into geological modelling activities
•
Warrentinna Project diamond drilling program completed with
assays pending
•
Firetower Project diamond drilling program has commenced
CAPITAL STRUCTURE
Share Price: A$0.085
Cash (30/09/23): A$2.5M
Debt: Nil
Ordinary Shares: 136.4M
Market Cap: A$11.6M
Options: 3.4M
Performance Rights: 3.7M
BOARD OF DIRECTORS
Clive Duncan
Non-Executive Chair
Neil Marston
Managing Director / CEO
Sam Garrett
Technical Director
John Forwood
Non-Executive Director
COMPANY SECRETARY
Mathew Watkins
CONTACT
Level 4, 96-100 Albert Road,
South Melbourne,
Victoria, 3205
+61 (0) 3 9692 7222
info@flynngold.com.au
www.flynngold.com.au
________________________________________________________________________________________________________
Flynn Gold Limited (ASX: FG1, “Flynn” or “the Company”) is pleased to
provide an update on its Trafalgar Prospect within the Company’s 100%
owned Golden Ridge Project located in North-east Tasmania (Figure 1).
Managing Director and CEO, Neil Marston commented,
“With the recent completion of Phase 2 drilling at the Trafalgar Prospect
at Golden Ridge in north-east Tasmania, the Company has undertaken
its first round of metallurgical tests to establish the potential gold
recovery using conventional processing methods.
“Undertaking these tests early is vital in determining if the gold at Golden
Ridge can be recovered using well established technology. To achieve
an average gold recovery result of 94.5% is extremely encouraging,
especially as most samples were from the fresh rock ‘sulphide zone’.
Follow-up test work is now being planned.
“Meanwhile, the Company continues drilling on other projects in
Tasmania with the rig presently testing for depth extensions of gold and
critical minerals at the Firetower project.”
Trafalgar Leaching Test Results
A program of metallurgical testwork was undertaken with the aim of establishing whether the
gold at the Trafalgar Prospect was readily recoverable using conventional cyanide leaching
processes, and
A total of 26 samples across a wide range of gold grades and mineralisation types (3 oxide
and 23 fresh rock “sulphide zone”) were tested for gold recovery by cyanide using a bottle roll
leach (LeachWELLTM) test at Australian Laboratory Services Pty Ltd (ALS). The samples used
in these tests were taken from the crushed and pulverised (to a nominal 85% passing 75
microns) bulk residues from the earlier laboratory testwork and weighed 1,000 grams (1
kilogram), i.e. 20 times the sample size used in the FA50 method.
High-grade cyanide leaching utilising the LeachWELLTM accelerant was used to determine the
cyanide extractable gold and provides an indication of potential recoveries in metallurgical
processes and circuits. Recovery and analysis of the residues (tailings) by FA50 method then
allowed reporting of total gold values.
Table 1 below lists the assay results from the LeachWELLTM bottle roll leach and the tailings
Fire Assay which are added together for the total gold grade. The gold grades received from
the initial diamond core analysis, undertaken using either the FA50 method or, in the case of
samples exceeding 100g/t Au, using a gravimetric method, are also included in Table 1 for
comparison.
To calculate the percentage of cyanide leachable gold, the LeachWELLTM assay is divided by
the total gold grade. Table 1 shows gold recoveries ranged from 83% to 99%. Overall, the
average across the 26 samples is 94.5% gold recovery. From these initial results it appears
that the gold at the Trafalgar Prospect at Golden Ridge will be recoverable using conventional
leaching processes.
Table 1 also shows the variance between the initial FA50 samples reported by the Company
and the latest results. The variance in gold grade amongst the low-grade samples tested (i.e.
<2g/t Au) is generally evident and in cases much greater with up to 88.3% higher grades
reported in Table 1. As a result the Company intends to undertake additional LeachWELLTM
bottle roll leach tests on selected wide low-grade gold intervals recorded in drilling.
Page 2 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Table 1: Results of LeachWELLTM and Tailings Analysis
Drillhole_ID
TFDD002B
TFDD003
TFDD004
TFDD004
TFDD005
TFDD005B
TFDD005B
TFDD008
TFDD008
TFDD008
TFDD008
TFDD008
TFDD009
TFDD009
TFDD011
TFDD011
TFDD011
TFDD011
TFDD011
TFDD011
TFDD012
TFDD013
TFDD013
TFDD015
TFDD015
TFDD015
From
(m)
178.4
57.5
277.45
298
14
232
311
10
93.3
231
279
280
70.2
182.5
13.6
111.9
113.2
185.6
256
263
262.65
23
25.9
191.7
205.2
353.9
Interval
(m)
0.6
0.5
0.55
1.0
1.0
1.0
1.0
1.0
0.8
1.0
1.0
0.5
0.5
0.5
0.7
0.7
0.8
0.4
0.5
1.0
0.75
1.0
0.5
0.8
0.55
0.4
LeachWELLTM
Au (ppm)
1.70
139.00
8.53
6.13
1.48
0.39
2.36
0.89
2.70
1.69
1.03
3.33
0.48
1.38
1.64
17.05
2.12
8.00
2.04
0.50
10.15
0.72
167.50
12.60
22.30
138.00
Tail
Au (ppm)
0.36
3.65
0.55
0.27
0.04
0.04
0.12
0.05
0.22
0.08
0.08
0.19
0.04
0.07
0.06
0.41
0.17
0.07
0.10
0.05
0.59
0.06
5.24
0.44
0.57
3.25
Page 3 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Total
Au (ppm)
2.06
142.65
9.08
6.40
1.52
0.43
2.48
0.94
2.92
1.77
1.11
3.52
0.52
1.45
1.70
17.46
2.29
8.07
2.14
0.55
10.74
0.78
172.74
13.04
22.87
141.25
FA50/GRA
Au (ppm)
1.99
143.00
8.90
5.91
1.27
0.39
2.54
0.87
2.83
1.79
1.01
5.83
0.72
0.77
1.56
16.40
2.46
8.58
1.96
0.47
10.00
0.58
169.75
13.95
20.80
137.75
Variance
Au (ppm)
0.07
-0.35
0.18
0.49
0.25
0.04
-0.06
0.07
0.09
-0.02
0.10
-2.31
-0.20
0.68
0.14
1.06
-0.17
-0.51
0.18
0.08
0.74
0.20
2.99
-0.91
2.07
3.50
Variance
(%)
3.52%
-0.24%
2.02%
8.29%
19.69%
10.26%
-2.36%
8.05%
3.18%
-1.12%
9.90%
-39.62%
-27.78%
88.31%
8.97%
6.46%
-6.91%
-5.94%
9.18%
17.02%
7.40%
34.48%
1.76%
-6.52%
9.95%
2.54%
Average
NaCN
Leach (%)
82.5%
97.4%
93.9%
95.8%
97.4%
90.7%
95.2%
94.7%
92.5%
95.5%
92.8%
94.6%
92.3%
95.2%
96.5%
97.7%
92.6%
99.1%
95.3%
90.9%
94.5%
92.3%
97.0%
96.6%
97.5%
97.7%
94.5%
Golden Ridge Project Background
The Company’s Golden Ridge Project is situated within EL17/2018 in Northeast Tasmania
(see Figure 1).
Exploration by the Company at Golden Ridge has identified anomalous gold extending over
an 8km long contact zone along the southern margin of the Golden Ridge Granodiorite (See
Figure 2). The Golden Ridge Project exhibits attributes of a large intrusive-related gold system
(IRGS) and the Company is continuing to identify and test multiple exploration targets, with the
aim of making further discoveries.
The focus of recent drilling has been at the Trafalgar Prospect.
Figure 1 - Location of Flynn Gold tenements in NE Tasmania.
Page 4 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Figure 2 - Flynn Gold’s Golden Ridge Project, NE Tasmania, showing prospect areas.
Trafalgar Prospect Background
The Company’s has completed 2 phases of drilling at the Trafalgar Prospect since May 2022.
The Phase 1 drill program completed in February 2023, comprised 7 diamond holes
(TFDD002-TFDD008) and delivered highly encouraging results, including 12.3m @ 16.8g/t Au
from 108.7m in TFDD005 1.
The Phase 2 drill program (TFDD008(extension)-TFDD015) was completed in August 2023,
with step-out diamond drill holes designed to test the extent and continuity of the gold vein
system at Trafalgar. Further high-grade results reported from this program include 4m @
23.7g/t Au from 23.0m in TFDD013 2.
The Trafalgar gold mineralisation system extends over a drilled strike length of at least 400m
and to depths of up to 420m from surface.
1
See FG1 ASX Announcement dated 12 December 2022 for full details.
2 See FG1 ASX Announcement dated 14 September 2023 for full details.
Page 5 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Results and observations from drilling at Trafalgar continue to support Flynn’s exploration
model that the Golden Ridge Project is an IRGS with significant potential for delineation of a
large-scale gold resource.
Trafalgar Drilling Update
All assay results from the Phase 2 drilling at Trafalgar, completed in late August 2023, have
been received by the Company. Assays reported in this update are from the remaining 420m
of samples from drill hole TFDD014 and sections of TFDD015.
Latest Drilling Results
Significant new mineralised intercepts are detailed in Table 2 and shown (in yellow boxes) in
Figure 3.
With all drilling results now received the Company is updating the geological model of the
Trafalgar prospect to identify the best drilling targets for testing with follow-up drilling.
Figure 3 - Preliminary vein zone model with interpolated gold grade shells, Plan View, Trafalgar Prospect, Golden
Ridge Project. Grade shells: red = >0.5g/t Au, orange = >0.3g/t Au.
Significant intercepts reported as downhole length.
Page 6 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Other Tasmanian Exploration Activities
Diamond drilling at the Company’s Warrentinna Project has concluded with 2 planned holes
successfully completed for a total of 357m. Core logging, cutting and sampling has been
completed with samples currently being processed through the laboratory for analysis.
Assay results from the Warrentinna drilling will be reported in the coming weeks.
Diamond drilling at the Company’s Firetower project has commenced with the aim of testing
for depth extensions of the main gold-cobalt-tungsten-copper mineralised zone identified in
previous drilling 3.
Further details will be provided once drilling at Firetower is completed.
Approved by the Board of Flynn Gold Limited.
For more information contact:
Neil Marston
Managing Director & CEO
+61 3 9692 7222
info@flynngold.com.au
Ben Creagh
Media & Investor Relations
+61 (0) 417 464 233
benc@nwrcommunications.com.au
3 See FG1 ASX Announcement dated 27 October 2023 for full details.
Page 7 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Table 1: Location Data for Phase 2 Trafalgar Drillholes (FG1 Drilling)
Drillhole ID
Easting
(m)
Northing
(m)
Elevation
(m)
Azimuth
(degrees)
Dip
(degrees)
Depth
(m)
TFDD008
TFDD009
TFDD010
TFDD011
TFDD012
588354
588074
588367
588420
588380
5416588
5416577
5416649
5416613
5416600
195
180
178
162
180
120
150
164
164.5
160
-55
-55
-53
-55
-50
149.9 (341.5)
213.95
269.5
315.4
322.9
TFDD013
TFDD014
TFDD015
588420
588456
588324
5416614
5416535
5416389
162
154
263
164.5
125.5
319.2
-65
-55
-70
TOTAL
47.5
236.6
431.6
1,987.35
Notes:
•
Co-ordinate projection is MGA94, zone 55.
•
Hole TFDD008 was extended by 149.9m from 191.6m to 341.5m in Phase 2.
Table 2 - Significant Intercepts Reported for Trafalgar Prospect Drillholes
Drillhole ID
From (m)
TFDD014
0
32
37
39
32
39
38
236.6
0
67.0
68.0
91.0
95.0
157.0
157.45
167.0
167.0
168.95
191.7
191.7
204.55
205.2
207.0
209.0
210.0
282.0
283.0
284.7
285.2
286.9
287.7
300.1
300.6
306.5
307.0
346.0
347.0
67.0
68.0
91.0
95.0
157.0
157.45
167.0
207.0
169.4
169.4
193.3
192.5
207.0
205.75
209.0
210.0
282.0
283.0
284.7
285.2
286.9
287.7
300.1
300.6
306.5
307.0
346.0
347.0
353.2
including
TFDD015
including
including
including
including
including
including
To (m)
Interval
(m)
7
1
1.0
4.0
0.45
40.0
2.4
0.45
1.6
0.8
2.45
0.55
1.0
1
0.5
0.8
0.5
0.5
1
Au (g/t)
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
0.54
1.61
5.09
0.86
4.05
1.02
2.83
11.35
8.56
13.95
5.10
20.22
0.65
0.44
0.86
0.45
1.41
2.06
0.33
Comment
New
New
New
New
Previous
Previous
Previous
Previous
Previous
Previous
Previous
Previous, 0.1g/t Au cut-off
Previous
Previous
Previous
Previous
Previous
Previous
Previous
Previous
Updated
New
New
New
New
New
New
New
New
New
New
New
Previous
Page 8 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Drillhole ID
From (m)
TFDD015
including
353.2
353.9
354.3
377.4
378.0
390.5
391.4
396.0
397.0
411.0
412.0
416.8
422.2
422.7
including
To (m)
354.3
354.3
377.4
378.0
390.5
391.4
396.0
397.0
411.0
412.0
416.8
422.7
422.7
431.6
Interval
(m)
1.1
0.4
0.6
0.9
1
1
5.9
0.5
Au (g/t)
NSI
NSI
NSI
NSI
NSI
NSI
51.3
137.8
1.53
0.55
1.08
0.75
0.31
1.99
Comment
Previous
Previous
Previous
Previous
Updated
New
New
New
New
New
New
New
New
New
Notes:
•
•
•
•
•
•
•
•
All reported intersections are assayed on geological intervals ranging from 0.3 to 2m.
Significant Intercepts cut-off grade is 0.3g/t gold unless indicated otherwise.
Up to 3m internal dilution when 0.3g/t Au cut-off is used
Up to 6m internal dilution when 0.1g/t Au cut-off is used
Reported grades are calculated as length-weighted averages.
Intercepts are downhole lengths.
NSI means No Significant Intercept.
Drill core samples are analysed for gold by fire assay (50-gram charge) with an AAS finish (ALS method
code Au-AA26).
Page 9 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
About Flynn Gold Limited
Flynn Gold is an Australian mineral exploration company with a portfolio of projects in Tasmania and
Western Australia (see Figure 4). The Company has nine 100% owned tenements located in northeast
Tasmania which are highly prospective for gold as well as tin/tungsten. The Company also has the
Henty zinc-lead-silver project on Tasmania’s mineral-rich west coast and the Firetower gold and battery
metals project located in northern Tasmania.
Flynn has also established a portfolio of gold-lithium exploration assets in the Pilbara and Yilgarn regions
of Western Australia.
For further information regarding Flynn Gold please visit the ASX platform (ASX: FG1) or the Company’s
website www.flynngold.com.au.
Figure 4 - Location Plan of Flynn Gold Projects
Page 10 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Competent Person Statement
The information in this ASX Announcement that relates to Exploration Results is based on information
compiled by Mr Sean Westbrook, a Competent Person who is a Member of the Australian Institute of
Geoscientists. Mr Westbrook is a consultant to Flynn Gold and is a shareholder in Flynn Gold. Mr
Westbrook has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’. Mr Westbrook consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
This announcement includes information that relates to Exploration Results prepared and first disclosed
under the JORC Code (2012) and extracted from the Company’s previous ASX announcements as
noted, and the Company’s Prospectus dated 30 March 2021. Copies of these announcements are
available from the ASX Announcements page of the Company’s website: www.flynnngold.com.au.
The Company confirms that it is not aware of any new information or data that materially affects the
information included within the Prospectus dated 30 March 2021.
Forward Looking and Cautionary Statements
Some statements in this announcement regarding estimates or future events are forward-looking
statements. They include indications of, and guidance on, future earnings, cash flow, costs and financial
performance. Forward-looking statements include, but are not limited to, statements preceded by words
such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”,
“believes”, “potential”, "predict", "foresee", "proposed", "aim", "target", "opportunity", “could”, “nominal”,
“conceptual” and similar expressions. Forward-looking statements, opinions and estimates included in
this report are based on assumptions and contingencies which are subject to change without notice, as
are statements about market and industry trends, which are based on interpretations of current market
conditions. Forward-looking statements are provided as a general guide only and should not be relied
on as a guarantee of future performance. Forward-looking statements may be affected by a range of
variables that could cause actual results to differ from estimated or anticipated results and may cause
the Company’s actual performance and financial results in future periods to materially differ from any
projections of future performance or results expressed or implied by such forward-looking statements.
So, there can be no assurance that actual outcomes will not materially differ from these forward-looking
statements.
Page 11 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
JORC Code Table 1 for Exploration Results –
Golden Ridge Project Drilling
Section 1: Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g.
cut channels, random chips, or
specific specialised industry standard
measurement tools appropriate to
the minerals under investigation,
such as downhole gamma sondes, or
handheld XRF instruments, etc.).
These examples should not be taken
as limiting the broad meaning of
sampling.
The sampling described in this report refers to diamond (DD) drilling.
Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used.
Sampling is guided by Flynn’s protocols and Quality Control
procedures, as per industry standards.
Samples were all collected by qualified geologists or under geological
supervision.
The samples are judged to be representative of the rock being drilled.
The nature and quality of sampling is carried out under QAQC
procedures as per industry standards.
Diamond core is sampled to geological boundaries with sample
lengths generally between 0.3m and 2.0m.
The core is cut on site and half core sampled. The remaining half core
is stored on site.
Care is taken when sampling the diamond core to sample the same
half side of the core as standard practice.
During sampling of the diamond drill core, certified reference material
(CRM) standards are inserted at least every 20 samples. Blank samples
are also inserted at least every 20 samples. Duplicate samples are
routinely submitted and checked against originals.
Aspects of the determination of
mineralisation that are Material to
the Public Report.
Whole samples were pulverised and split to produce a 50g charge for
fire assay (ALS Au-AA26 method).
All samples are pulverised to nominal 85% passing 75 microns before
being split for analyses.
26 x 1,000g samples were prepared by ALS for Cyanide leaching (ALS
ME-CN15 method) utilised the LeachWELLTM accelerant to determine
the cyanide extractable gold, providing an indication of potential
recoveries in metallurgical processes and circuits. Recovery and
analysis of the residues (tailings) (ALS Au-AA26 method) allows
reporting of total gold values.
Coarse gold was observed in some drill core intervals. Additional
sampling using various techniques and duplicate samples is ongoing to
allow an assessment of any sampling issues. Current results appear to
be consistent with historical drilling assay results associated with
coarse visible gold.
Drilling
techniques
Drill type (e.g. core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core
diameter, triple or standard tube,
depth of diamond tails, facesampling bit or other type, whether
core is oriented and if so, by what
method, etc.).
Drilling is undertaken by diamond core technique at triple tube PQ3
(83.1mm diameter),HQ3 (61.1mm diameter), and NQ3 (42mm) core
sizes.
Industry standard diamond drilling techniques are used.
HQ core is orientated using a Boart Longyear Truecore UPIX core
orientation system or similar.
Hole traces are surveyed using a digital down-hole survey camera tool.
The location of each hole was recorded by handheld GPS with
positional accuracy of approximately +/-5m. Location data was
collected in MGA94 zone 55.
Drill holes are planned to intersect mineralisation at an optimum
angle.
Page 12 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code explanation
Commentary
Drill sample
recovery
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Core recovery was logged and recorded in the company’s database.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Triple tube diamond core drilling techniques are used.
The core recovery is logged for each run of drilling and measured
against the drilled length.
Generally, sample weights are comparable, and any bias is considered
negligible.
Logging
Whether a relationship exists
between sample recovery and grade
and whether sample bias may have
occurred due to preferential
loss/gain of fine/coarse material.
No relationship has been noticed between sample recovery and grade.
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
All diamond core holes are geologically logged in full for core recovery,
RQD, geotechnical parameters, weathering, oxidation, lithology,
grainsize, alteration, mineralisation, vein types and vein intensity,
structure, and magnetic susceptibility.
The geological logging was done using a standardised logging system.
This information and the sampling details were transferred into Flynn
Gold’s drilling database.
The geological and geotechnical logging is considered to be completed
to a sufficient level to support appropriate future geological, Mineral
Resource estimation, mining, and metallurgical studies.
Subsampling
techniques
and sample
preparation
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
Logging is both qualitative and quantitative in nature.
The total length and percentage of
the relevant intersections logged.
All drill holes are logged in full and to the total length of each hole.
If core, whether cut or sawn and
whether quarter, half or all core
taken.
The core is cut on site and half core sampled. The remaining half core
is stored on site.
Drill core is photographed as wet and dry, and before (full core) and
after cutting (half core).
Care is taken when sampling the diamond core to sample the same
half side of the core as standard practice.
Large diameter core drilling (PQ, HQ) is utilised to maximise recovery
and obtain larger samples to maximise representivity of samples.
If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
N/A for DD drilling
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
Samples were transported by road to ALS Global’s laboratory in
Adelaide, South Australia.
The sample preparation for all samples follows industry best practice.
At the laboratory all samples are weighed, dried, crushed and
pulverised (to 85% passing 75 microns) prior to sub-sampling for
assay.
Standardised equipment used with QC performed at the pulverisation
stage at the labs.
Quality control procedures adopted
for all subsampling stages to
maximise representivity of samples.
Flynn Gold has protocols that cover the sample preparation at the
laboratories and the collection and assessment of data to ensure that
accurate steps are used in producing representative samples.
The crusher and pulveriser are flushed with barren material at the
start of every batch.
Measures taken to ensure that the
sampling is representative of the insitu material collected, including for
Sampling is carried out in accordance with Flynn Gold’s protocols as
per industry best practice.
Field QC procedures involve the use of certified reference material as
assay standards and blanks, as well as coarse crush duplicates.
Page 13 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code explanation
Commentary
instance results for field
duplicate/second-half sampling.
For analysis of diamond core, CRM standards and blanks are inserted
by the field Geologist at intervals accounting for 7 to 10% of total
samples which is considered to be to industry standards.
CRM results over low-, moderate-, and high-grade gold ranges indicate
acceptable levels of accuracy and precision of assay batch results.
Quality of
assay data
and
laboratory
tests
Whether sample sizes are
appropriate to the grain size of the
material being sampled.
Sample sizes are considered appropriate for the style of mineralisation
sought.
The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
All rock and drill core samples are sent to ALS (Adelaide) for sample
preparation and sub-sampling prior to being on-sent to ALS
Townsville, Brisbane, or Perth laboratories for assay.
All drill core samples are analysed for gold by fire assay (50-gram
charge) with an AAS finish (ALS method code Au-AA26). Over-range
gold samples are re-assayed using a gravimetric finish These
techniques are considered total in nature and is an industry standard
technique.
Multielement assaying done on selected samples. ALS method code
ME-MS61. This is a four-acid digest with ICP-MS finish.
Cyanide leaching tests done on selected samples. ALS method code
ME-CN15 utilising LeachWELLTM accelerant.
Flynn Gold has its own internal QAQC procedure involving the use of
certified reference material (CRM) standards, blank (non-mineralised)
materials, and duplicate samples.
ALS laboratories are accredited to ISO/IEC standards.
External laboratory checks have not been used to date.
Verification
of sampling
and assaying
For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the parameters
used in determining the analysis
including instrument make and
model, reading times, calibrations
factors applied and their derivation,
etc.
No geophysical tools were used to determine any element
concentrations
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory
checks) and whether acceptable
levels of accuracy (i.e. lack of bias)
and precision have been established.
Sample preparation checks for fineness were carried out by the
laboratory as part of their internal procedures to ensure the grind size
of85% passing 75 microns.
The verification of significant
intersections by either independent
or alternative company personnel.
All reported data was subjected to validation and verification by
company personnel prior to reporting.
The use of twinned holes.
Flynn Gold is yet to twin any of the historical drill holes. However,
confirmation drilling is being carried out within close proximity to
previous drillholes to verify historical drilling grade and widths.
Documentation of primary data,
data entry procedures, data
verification, data storage (physical
and electronic) protocols.
Primary data is collected both manually onto paper logging forms and
digitally using a field laptop computer using in-house logging codes.
Internal laboratory QAQC checks are reported by the laboratory.
Review of the internal laboratory QAQC suggests the laboratory is
performing within acceptable limits.
The data is checked and verified prior to entering into a master
database.
Flynn Gold has done sufficient verification of the data, in the
Competent Person’s opinion to provide sufficient confidence that
sampling was performed to adequate industry standards and is fit for
the purpose of planning exploration programs and generating targets
for investigation.
Page 14 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
Location of
data points
Data spacing
and
distribution
JORC Code explanation
Commentary
Discuss any adjustment to assay
data.
All original drilling and logging records are kept on file.
Accuracy and quality of surveys used
to locate drillholes (collar and
downhole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation.
Drill hole collars are pegged before drilling and surveyed using a
handheld GPS to a lateral accuracy of +/-5m.
Specification of the grid system used.
All Flynn Gold samples are surveyed in the MGA 94 Zone 55 grid
system.
No adjustments have been made to any of the assay data.
Final collar locations are surveyed again upon completion of drilling.
A Mineral Resource estimate has not been determ
Share your feedback
Discover