Drilling Confirms Gold System Near Surface at Warrentinna
Released
Released
Announcement PDF
ASX Announcement
ASX Announcement
12 January 2024
19 January 2023
Drilling Confirms Gold System
Near Surface at Warrentinna
Project, NE Tasmania
Highlights
ASX: FG1
ABN 82 644 122 216
•
Multiple zones of auriferous quartz veining intersected in Flynn’s
maiden diamond drilling program at the Warrentinna Project in NE
Tasmania.
•
Drilling program consisted of 2 drillholes for a total of 357m with best
intercepts reported in hole DNDD001:
CAPITAL STRUCTURE
o
Share Price: A$0.059
DNDD001:
Cash (30/09/23): A$2.5M
o 2.1m @ 7.0g/t Au from 75.1m, and
Debt: Nil
Ordinary Shares: 145.7M
Market Cap: A$8.6M
•
The program confirms highly prospective orogenic-style gold
mineralisation which coincides with historical mine workings over a
largely untested 6km-long corridor with potential for nearsurface gold resources.
•
Drillholes also yielded valuable structural data which will be used for
targeting in future campaigns that will aim to prove mineralisation
along strike from historical drill results, which include:
BOARD OF DIRECTORS
Clive Duncan
Non-Executive Chair
Neil Marston
Managing Director / CEO
Sam Garrett
Technical Director
o
WTR013:
o
2019WTD001:
COMPANY SECRETARY
Mathew Watkins
CONTACT
Level 4, 96-100 Albert Road,
South Melbourne,
Victoria, 3205
+61 (0) 3 9692 7222
info@flynngold.com.au
www.flynngold.com.au
5.0m @ 28.93g/t Au from 36.0m, including
o 1.0m @ 103.25g/t Au from 37.0m
John Forwood
Non-Executive Director
4.8m @ 1.2g/t Au from 92.0m, including
o 0.3m @ 5.6g/t Au from 94.6m
Options: 3.4M
Performance Rights: 3.7M
7.2m @ 2.5g/t Au from 68.9m, including
21.7m @ 3.3g/t Au from 9.3m, including
o 2.2m @ 12.0g/t Au from 10.8m
o
2019WTD002:
11.7m @ 2.8g/t Au from 115m.
________________________________________________________
Flynn Gold Limited (ASX: FG1, “Flynn Gold” or “the Company”) is
pleased to announce the results from its maiden diamond drilling
campaign at its 100%-owned Warrentinna Project in northeast
Tasmania.
Managing Director and CEO, Neil Marston commented,
“Our maiden diamond drilling program has confirmed that the Warrentinna Project has
potential for gold resources near surface and proven to extend the depth of mineralisation to
greater than 100 metres.
“Previous explorers have produced some remarkable high grades at Warrentinna. Our drilling
has confirmed the existence of multiple zones of gold mineralisation and added a structural
context which will be used in targeting for future drilling campaigns.
“The Warrentinna goldfield is defined by shallow historic workings over a strike length of 6km,
and with this campaign targeting gold mineralisation in the north of the goldfield, the remainder
is largely untested.”
Warrentinna Gold Project
The Warrentinna Project (EL30/2004) is located in northeast Tasmania, 40km northwest of
Flynn’s Golden Ridge Project (see Figure 1). The tenement was acquired from Greatland Gold
plc (LSE: GGP, “Greatland”) in June 2023 1.
Figure 1 – Location of Warrentinna Project and
other Flynn Gold tenements in northeast Tasmania
1 See FG1 ASX Announcement dated 5 June 2023
Page 2 of 21 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
The project encompasses two historic goldfields, Forester and Warrentinna (see Figure 2).
High-grade gold deposits were mined at both fields in the late 1800s and early 1900s. The
Warrentinna goldfield is defined by numerous historic workings and largely untested prospects
over a strike length of 6km.
Figure 2 – Warrentinna Project Geology and Gold Prospects
High-grade gold quartz lodes were previously mined, both at surface and underground, at
deposits such as the Golden Mara mine, which produced 3,368oz at an average of 1 oz/tonne 2.
Warrentinna Drilling
Two diamond holes were drilled at the Warrentinna Prospect for a total of 357m (Figure 3),
Table 1 contains full details of these drillholes. The holes have confirmed the continuity of
orogenic style gold mineralisation identified in historical drilling by Greatland.
The holes were drilled in the opposite direction to previous RC and diamond drilling completed
by Greatland. As a result, these holes yielded critical stratigraphic and structural information
which will guide the interpretation of historic data and verify and amend the existing vein model.
2 Blake, F. 1934b. The Golden Mara Mine, Warrentinna. Unpublished Report, Department of Mines, Tasmania.
Page 3 of 21 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
This campaign confirms gold mineralisation at Warrentinna occurs in multiple sub-parallel lode
style quartz veins. Veins strike north, to north-northeast and are steeply dipping to the east
and west.
Figure 3 – Warrentinna Project – Plan View with highlighted intervals from this campaign
– DNDD001 and DNDD002.
Drill hole DNDD001 was drilled to a depth of 164m to the south of historic high-grade gold
mineralisation intersected in Greatland diamond and RC holes. Highlights from this hole
include 7.2m @ 2.5g/t Au from 68.9m which include multiple lode style auriferous quartz veins
(see Figure 4). Figure 5 shows a cross section of DNDD001 with the main mineralised zones
highlighted. The mineralised zones conform to the vein model (red) used to plan the campaign.
Page 4 of 21 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Figure 4 – Photographed core from DNDD001 showing high grade gold intervals
in lode style quartz veins from mineralised zone 7.2m @ 2.5g/t Au from 68.9m.
Figure 5 – Cross section of DNDD001 highlighting main mineralised zones.
Mineralised zones conform with vein model (red) used to plan the campaign.
Page 5 of 21 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Drill hole DNDD002 was drilled to a depth of 193m to the south and down dip of DNDD001, to
test the strike and dip continuation of mineralisation intersected in DNDD001 and in historic
Greatland diamond and RC holes. Figure 6 shows a cross section of DNDD002, with the main
mineralised zones highlighted, which also conform to the vein model used to plan the
campaign.
Figure 6 – Cross section of DNDD002 highlighting main mineralised zones.
Mineralised zones conform with vein model (red) used to plan the campaign.
Next Steps
The Company is currently reviewing the results of this maiden drill program at the Warrentinna
Project. This review will lead to refinement of the geological model and preparation of a
preliminary mineral resource model. This work will be used to identify the best locations for
follow-up drilling.
Page 6 of 21 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Other Tasmanian Exploration Activities
Firetower Project
The Company’s maiden diamond drilling program at the Firetower Project in northwest
Tasmania was completed in December 2023, with 496 metres advanced. Most of the drill core
has been logged and cut, with samples being progressively analysed at the laboratory. A
market update on the results of this drilling is expected to be released later in Q1 2024.
Golden Ridge Project
Detailed geological modelling of the Trafalgar prospect at the Golden Ridge Project is ongoing.
The aim of this work is to identify high priority targets for the next phase of drilling, with
particular emphasis on testing for shallow extensions of earlier vein intersections which graded
>100g/t Au. Drilling at Trafalgar has previously reported the following vein intersections with
grades exceeding 100g/t Au:
o TFD001:
5.0m @ 12.56g/t Au, including 0.4m @ 150.0g/t Au from 202.0m
o TFDD003: 1.2m @ 65.9g/t Au, including 0.5m @ 143.0g/t Au from 57.5m
o TFDD005: 12.3m @ 16.8g/t Au, including 0.7m @ 152.5g/t Au from 120.3m
o TFDD013: 4.0m @ 23.7g/t Au, including 0.5m @ 169.8g/t Au from 25.9m, and
o TFDD015: 1.1m @ 51.3g/t Au, including 0.4m @ 137.8g/t Au from 353.9m 3
Additional lower grade gold samples from the Trafalgar prospect have recently been submitted
for metallurgical testwork using the LeachWELLTM method, which recorded gold recoveries
averaging 94.5% in initial tests completed in 2023. 4
Henty Project
In December 2023, the Company received a drilling permit from Mineral Resources Tasmania
(MRT) for the advanced Mariposa Zinc/Lead/Silver prospect, which lies within the Henty
Project in northwest Tasmania. The Company is planning to undertake drilling at the Mariposa
prospect in Q1 2024.
Approved by the Board of Flynn Gold Limited.
For more information contact:
Neil Marston
Managing Director & CEO
+61 3 9692 7222
info@flynngold.com.au
Ben Creagh
Media & Investor Relations
+61 (0) 417 464 233
benc@nwrcommunications.com.au
See FG1 ASX Announcements dated 24 October 22, 12 December 22, 19 January 23, 14 September 23 and 10 October 2023
for full details
4
See FG1 ASX Announcement dated 22 November 2023 for full details.
3
Page 7 of 21 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
About Flynn Gold Limited
Flynn Gold is an Australian mineral exploration company with a portfolio of projects in Tasmania and
Western Australia (see Figure 7). The Company has nine 100% owned tenements located in northeast
Tasmania which are highly prospective for gold as well as tin/tungsten. The Company also has the
Henty zinc-lead-silver project on Tasmania’s mineral-rich west coast and the Firetower gold and battery
metals project located in northern Tasmania.
Flynn has also established a portfolio of gold-lithium exploration assets in the Pilbara and Yilgarn regions
of Western Australia.
For further information regarding Flynn Gold please visit the ASX platform (ASX: FG1) or the Company’s
website www.flynngold.com.au.
Figure 7 - Location Plan of Flynn Gold Projects
Competent Person Statement
The information in this ASX Announcement that relates to Exploration Results is based on information
compiled by Mr Michael Fenwick, a Competent Person who is a Member of the Australian Institute of
Geoscientists. Mr Fenwick is a full-time employee of Flynn Gold. Mr Fenwick has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity
being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Fenwick consents
to the inclusion in the report of the matters based on his information in the form and context in which it
appears.
Page 8 of 21 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Forward Looking and Cautionary Statements
Some statements in this announcement regarding estimates or future events are forward-looking
statements. They include indications of, and guidance on, future earnings, cash flow, costs and financial
performance. Forward-looking statements include, but are not limited to, statements preceded by words
such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”,
“believes”, “potential”, "predict", "foresee", "proposed", "aim", "target", "opportunity", “could”, “nominal”,
“conceptual” and similar expressions. Forward-looking statements, opinions and estimates included in
this report are based on assumptions and contingencies which are subject to change without notice, as
are statements about market and industry trends, which are based on interpretations of current market
conditions. Forward-looking statements are provided as a general guide only and should not be relied
on as a guarantee of future performance. Forward-looking statements may be affected by a range of
variables that could cause actual results to differ from estimated or anticipated results and may cause
the Company’s actual performance and financial results in future periods to materially differ from any
projections of future performance or results expressed or implied by such forward-looking statements.
So, there can be no assurance that actual outcomes will not materially differ from these forward-looking
statements.
Page 9 of 21 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Appendix I
Table 1: Location Data for Warrentinna Prospect Drillholes (FG1 Drilling)
Drillhole
ID
Easting
(m)
Northing
(m)
Elevation
(m)
Azimuth
(degrees)
Dip
(Degrees)
Length
(m)
DNDD001
DNDD002
561808
561806
5447531
5447529
242
242
284.3
259.5
-45.8
-54.6
TOTAL
164.2
193.3
357.5
Note:
•
Co-ordinate projection is MGA94, zone 55.
Table 2: DNDD001 and DNDD002 Significant Intercepts
Drillhole
ID
DNDD001
including
including
DNDD002
including
From
(m)
2.5
11.1
13.15
19.7
20.3
68.9
75.1
77.93
92.0
94.6
97.13
To
(m)
11.1
13.15
19.7
20.3
68.9
77.93
77.2
92.0
97.13
94.9
164.16 (EOH)
0
13.4
14.4
77.0
79.0
115.7
117.0
144.35
145.70
156.8
159.7
176.0
176.45
178.7
183.0
184.0
191.0
191.6
13.4
14.4
77.0
79.0
115.7
117.0
144.35
145.70
156.8
159.7
176.0
178.7
176.8
183.0
184.0
191.0
191.6
193.3 (EOH)
Interval
(m)
1.55
0.6
7.18
2.1
4.83
0.3
1.0
2.0
1.3
1.35
2.85
2.7
0.3
1.0
0.6
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
Notes:
•
All reported intersections are assayed on geological intervals ranging from 0.2 to 1.6m.
•
Significant Intercepts cut-off grade is 0.3g/t gold unless indicated otherwise.
•
Reported grades are calculated as length-weighted averages.
•
Intercepts are downhole lengths.
•
NSI means No Significant Intercept.
Page 10 of 21 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Au
(g/t)
0.3
0.91
2.47
6.97
1.2
5.58
0.43
0.48
0.51
0.44
0.48
0.89
3.78
0.96
1.25
JORC Code Table 1 for Exploration Results – Warrentinna Project
Information on historical prospecting, mining, and exploration activities at the Warrentinna has been
reviewed and verified by the Competent Person. Historical data is considered sufficiently consistent
between generations of past explorers, and sufficiently consistent with recent results, to provide
confidence that compiled and reviewed assay results are indicative of the tenor of the samples. In the
opinion of the Competent Person, sufficient verification of the data has been undertaken to provide
sufficient confidence that past exploration programs were performed to adequate industry standards
and the data reported is fit for substantiating the prospectivity of the projects in general, supporting the
geological model/s proposed, planning exploration programs, and identifying/generating targets for
further investigation.
Section 1: Sampling Techniques and Data
Criteria
JORC Code Explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
downhole gamma sondes, or handheld
XRF instruments, etc.). These examples
should not be taken as limiting the
broad meaning of sampling.
The sampling described in this report refers to the 2023
diamond (DD) campaign conducted by Flynn Gold (DNDD001
and DNDD002) and historical reverse circulation (RC) drilling
and diamond (DD) drilling carried out by Greatland Gold Plc
(Greatland), the previous holders of the tenement.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
Samples were all collected by qualified geologists or under
geological supervision.
The samples are judged to be representative of the rock being
drilled.
The nature and quality of sampling is carried out under QAQC
procedures as per industry standards.
2023 Diamond Drilling (Flynn Gold)
Samples consisted of diamond drill core (HQ size) cut in half.
All available core was cut and sampled. Sampling intervals were
a minimum of 0.2m and a maximum of 1.0m. Where samples
were not at 1.0m, the sample breaks were constrained by
geological structures (e.g. quartz veins, faults). Sampling was
carried out to Flynn Golds internal protocols and QAQC
procedures.
Entire samples prepared at the ALS laboratory in Burnie.
Samples were weighed (WEI-21) crushed (CRU-21) then
pulverised (PUL-21) to a nominal 85% passing 75 microns. The
resulting pulps were analysed for Au (AU-AA26: 25g charge, fire
Assay).
2019 Diamond Drilling (Greatland)
Samples consisted of diamond drill core (HQ and NQ sizes) cut
in half.
All available core was cut and sampled. Sampling interval was
generally 1m or 0.5m but respects geological contacts in
places. Sampling was carried out to Greatland’s internal
protocols and QAQC procedures.
Entire samples were crushed then pulverised to a nominal 85%
passing 75 microns. The resulting pulps were analysed for Au
(50g charge, fire assay) and multi-element geochemistry (four
acid digest ICP-MS).
Locations and orientation of 2019 drill holes are included in the
FG1 ASX announcement published on 27 September 2023.
Page 11 of 21 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code Explanation
Commentary
Historic RC Drilling (Greatland)
RC sampling was carried out using Greatland’s internal
protocols and QAQC procedures.
One metre samples were collected from the cyclone into a
plastic bucket and laid out generally in rows of 50.
Initial RC samples were composited to 4m lengths via 'spear'
sampling of individual 1m intervals. Samples were then taken
to the laboratory and pulverised.
Anomalous intervals were subsequently re-samples and reassayed on a 1m basis by riffle splitting.
Drilling
techniques
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc.) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc.).
2023 Diamond Drilling (Flynn Gold)
Drilling was undertaken using a track mounted Coretech
CSD1800 drill rig. The drill rig is capable of ~1000m NQ.
Drillholes were cased with HWT casing to ~3m. HQ sized drill
core in triple tubing was used for the entire hole.
2019 Diamond Drilling (Greatland)
Drilling was undertaken using a track mounted Coretech
CSD1800 drill rig. The drill rig is capable of ~1000m NQ.
Drill holes were cased with HWT casing to ~3m. HQ sized drill
core from 0m to ~20m followed by NQ drill core from 20m to
end of hole.
Historic RC Drilling (Greatland)
Drilling was undertaken using a track mounted RC drill rig.
RC Drill holes - 134mm face sampling RC bit to end of hole.
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
2023 Diamond Drilling (Flynn Gold)
Length based core recovery was measured from reassembled
core for every drill run. Data was recorded into a digital RQD
spreadsheet that is then uploaded to Flynn Gold’s SQL
database.
Core recovery was considered high (>89%). The drilling method
employed, including triple tube and short runs in poor ground,
lead to good core recovery. However there were some
instances of core loss within intervals that included mineralised
ground.
2019 Diamond Drilling (Greatland)
Length based core recovery was measured from reassembled
core for every drill run. Data was recorded into laptop computer
using 'LogChief' - geological logging software.
Core recovery was considered high (93%). The drilling method
employed, including triple tube technique, lead to satisfactory
core recoveries.
Historic RC Drilling (Greatland)
RC sample recovery and quality was recorded via visual
estimation of sample volume and the condition of drill spoils.
Recovery ranged from 90-100%, with only occasional
recoveries of less than 70%. Sample recovery was maximized
by maintaining dry samples (dry drilling conditions) as much as
possible.
Due to consistently high recoveries, no relationship between
grade and recovery is evident.
Page 12 of 21 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code Explanation
Commentary
Logging
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
2023 Diamond Drilling (Flynn Gold)
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
All drill core was geologically logged for lithology,
mineralisation, veining, alteration, structure and geotechnical
data. Logging included qualitative and quantitative
components. All core was digitally photographed. Logs and
photographs are of satisfactory detail to support any future
mineral resource estimation.
Logging was recorded into excel templates and then transferred
to a database. Excel templates have constraints to ensure
invalid entries are minimised. Additional validation is then
carried out when data is transferred to the database by Flynn
Golds database managers.
2019 Diamond Drilling (Greatland)
All drill core/samples were geologically logged for lithology,
mineralogy, alteration, veining, sulphide occurrences, structure
and geotechnical data. This logging includes both qualitative and
quantitative components. All core is digitally photographed.
Logging is recorded directly into a laptop computer using
'LogChief' - geological logging software. This software has 'lookup tables' that do not allow for invalid entries. Additional
validation is then carried out when data is transferred to
Greatland’s database managers.
All samples are analysed in the field using a pXRF (Olympus Vanta
handheld - model VMR) for the purpose of geochemical
interpretation.
All core is analysed in the field using a Minalyze unit. This collects
ultra-high-resolution photography, and continuous XRF
measurements.
Historic RC Drilling (Greatland)
All RC drill samples were geologically logged for lithology,
mineralogy, alteration, veining and sulphide occurrences. This
logging includes both qualitative and quantitative components.
Samples were logged at 1m intervals.
Logging was both qualitative and quantitative in nature.
Page 13 of 21 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code Explanation
Commentary
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and
whether quarter, half or all core taken.
2023 Diamond Drilling (Flynn Gold)
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all subsampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
All core was cut with an automated core saw in a consistent
way that preserved the bottom of hole reference line (where
present). A hand operated core saw was used to broken core
to minimise sample loss.
Sampling intervals were a minimum of 0.2m and a maximum
of 1.0m. Where samples were not at 1.0m, the sample breaks
were constrained by geological structures (e.g. quartz veins,
faults).
Entire samples prepared at the ALS laboratory in Burnie.
Samples were weighed (WEI-21) crushed (CRU-21) then
pulverised (PUL-21) to a nominal 85% passing 75 microns.
All staff were adequately trained for all sampling steps, with
geologists checking sample sheets prior to release for cutting.
The sample sizes are considered appropriate for narrow vein
gold mineralisation.
Duplicate samples were assayed, split from the primary pulp
at the laboratory after crushing. Duplicate assay results were
consistent with primary assay results.
2019 Diamond Drilling (Greatland)
All sampled core was cut with a core saw in a consistent way
that preserved the bottom of hole reference line, where
present. Sampling interval is generally 1m or 0.5m but
respects geological contacts in places.
Sample preparation included drying, crushing and pulverising
in full to a nominal 85% passing 75 microns.
All staff were adequately trained for all sampling steps, with
geologists checking sample sheets prior to loading into the
database.
The sample sizes are considered appropriate for the style of
mineralisation encountered in the region.
No field duplicate samples were collected/reported.
Historic RC Drilling (Greatland)
One metre samples were collected from the cyclone into a
plastic bucket and laid out generally in rows of 50.
RC samples were composited to 4m lengths via 'spear' sampling
the individual 1m intervals.
RC sample preparation was completed at Genalysis Laboratory
in Adelaide using industry standard procedures (dry, crush and
pulverise for 85% at 75µm). This sample is then split into subsamples for analysis.
The sample sizes are considered appropriate for the style of
mineralisation encountered in the region.
Page 14 of 21 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code Explanation
Commentary
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
2023 Diamond Drilling (Flynn Gold)
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
All samples were submitted for preparation at the ALS
laboratory in Burnie. Fire assays were then completed at Burnie
or Townsville. The Townsville laboratory was used due to a
breakdown of machinery in the Burnie lab.
Samples were analysed for Au only, using AU-AA26 - 25g
charge, fire assay Quality control procedures included use of
certified reference material (CRM’s) for assays standards, and
blanks. Standard and blanks were inserted every 20 samples.
Duplicate fire assays were taken in intervals where higher gold
grades were expected, based upon visual mineralogy and
texture.
Duplicates, standards, and blanks passed within an acceptable
level of precision and accuracy.
2019 Diamond Drilling (Greatland)
All samples were submitted for preparation at Intertek
laboratory Adelaide. Pulp samples were then submitted for
analysis to Intertek Perth Laboratory.
Au analysis - 50g Fire Assay/ICP-OES (detection limit of
0.005ppm).
Multi-Element analysis - four acid digestion ICP-MS (for Ag, Al,
As, Ba, Be, Bi, Ca, Cd, Ce, Co, Cr, Cs, Cu, Fe, Ga, Ge, Hf, In, K, La,
Li, Mg, Mn, Mo, Na, Nb, Ni, P, Pb, Rb, Re, S, Sb, Sc, Se, Sn, Sr,
Ta, Te, Th, Ti, TI, U, V, W, Y, Zn, Zr).
Quality Control procedures in the field involve the use of certified
reference material (CRM's) for assay standards and blanks.
Standards and blanks are inserted every 20 samples.
No field duplicates have been collected/reported.
Historic RC Drilling (Greatland)
All samples were dried, crushed, and pulverised to produce
suitable sub-samples for Au analysis (via Fire Assay).
Au analysis - 50g Fire Assay/AAS (detection limit of 0.005ppm).
No geophysical tools were
concentrations in this report.
used
for
any
element
All samples are analysed in the field using a pXRF (Olympus Mseries) for the purpose of geochemical interpretation. This data is
for internal company use only.
Page 15 of 21 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code Explanation
Commentary
Verification
of sampling
and assaying
The verification of significant
intersections by either independent or
alternative company personnel.
2023 Diamond Drilling (Flynn Gold)
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Significant intersections have been verified by multiple company
personnel.
Logging data is recorded on excel templates and stored on
company storage drives. Data is also uploaded into a central
database that is also backed up off site. Logging templates have
constraints to minimise data entry errors, data is further verified
by database administrators when it is transferred to the central
database.
Verified assay data is received directly from the laboratory stored
in the comp
Share your feedback
Discover