High-Grade Au-Co-W Intersected at Firetower, NW Tasmania
Released
Released
Announcement PDF
ASX Announcement
22 January 2024
High-Grade Gold-Cobalt-Tungsten
Intersected at
Firetower, NW Tasmania
ASX: FG1
Highlights
•
First assay results from recent diamond drilling have confirmed
potential for significant polymetallic gold and critical minerals mineralisation
at the Firetower Project in northwest Tasmania
•
High-grade gold-cobalt-tungsten-copper mineralisation intersected,
including:
ABN 82 644 122 216
CAPITAL STRUCTURE
Share Price: A$0.05
• 2019FTD007E:
Cash (30/09/23): A$2.5M
o 17.0m @ 2.31g/t Au, 0.16% Co, 0.38% WO3, 0.16% Cu from 121.0
-138.0m, including:
Debt: Nil
Ordinary Shares: 145.7M
1.7m @ 6.64g/t Au, 0.12% Co, 0.87% WO3, 0.14% Cu from
121.0m, and
Market Cap: A$7.3M
Options: 3.4M
5.5m @ 3.27g/t Au, 0.24% Co, 0.53% WO3, 0.33% Cu from
132.5m.
Performance Rights: 3.72M
BOARD OF DIRECTORS
Clive Duncan
•
Diamond drilling program comprised one new drillhole and three diamond
tail extensions to holes previously drilled in 2019, for a total of 496.0m
•
All drill core has been cut and submitted for multi-element analysis
with 164.6m of assays reported here and assays pending for 331.4m
•
Drilling permits in place to extend additional shallow historic drill holes
and test for depth and strike extensions to the high-grade polymetallic
mineralised zone
•
Prospective strike length of 6km remains lightly drilled.
Non-Executive Chair
Neil Marston
Managing Director / CEO
Sam Garrett
Technical Director
John Forwood
__________________________________________________________________________________________________________________
Non-Executive Director
Flynn Gold Limited (ASX: FG1, “Flynn” or “the Company”) is pleased to
provide the first drilling results from its 100%-owned Firetower Project located in
northwest Tasmania.
COMPANY SECRETARY
Mathew Watkins
CONTACT
Level 4, 96-100 Albert Road,
South Melbourne,
Victoria, 3205
+61 (0) 3 9692 7222
info@flynngold.com.au
www.flynngold.com.au
The initial drilling results confirm coherent zones of high-grade polymetallic gold,
cobalt, tungsten and copper (Au-Co-W-Cu) mineralisation at the project, with
laboratory assays for most of the program still pending.
Commenting on the drilling, Managing Director and CEO Neil Marston said
“High-grade gold-cobalt-tungsten has been recorded in the first results from
drilling at the Company’s Firetower Project in northwest Tasmania. Our drilling
has been successful in testing for depth extensions of the main mineralised
zone.
“The 4-hole drill program completed in December 2023 tested depth extension targets generated
from our recent review of the project.
“Previous drilling at Firetower has been generally shallow and across a limited strike length, with
very few holes extending beyond 150m from the surface. Several previous drill holes ended in
mineralisation.
“These early results demonstrate the depth continuity of mineralisation and highlight the significant
potential for high-grade mineralisation to continue at depth and along strike.
“Importantly Flynn already has permits in place to undertake a follow-up drilling program to test
for further mineralisation.”
Firetower Polymetallic (Au-Co-W-Cu) Mineralisation
The polymetallic Au-Co-W-Cu mineralisation at Firetower is currently defined by historic drilling
over a strike length of 200m and remains open along a highly prospective 6km-long trend
between the Firetower West and Firetower East prospects (Figure 1). The mineralisation, which
partly outcrops, is currently drill-tested to approximately 150m depth and remains open down-dip.
Figure 1: Firetower Project Geology and Gold Prospects
Page 2 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Latest Firetower Drilling
One diamond drill hole and three diamond extension tails on existing holes were drilled at the
Firetower Prospect for a total of 496.0m. The location of these 4 drill holes is shown in Figure 2.
Table 1 contains full details of these drillholes.
Figure 2: Firetower Project Drill Hole Location Plan.
Extension drill hole 2019FTD007E was drilled for 83.2m from 98.7m – 181.9m to test for the
continuation of gold-cobalt-tungsten-copper mineralisation at depth. Results from 98.7m – 142.2m
have been received to date, with assays pending for the remainder of the hole (39.7m from 142.2m
– 181.9m). Highlights of the results to date from this extension hole include:
•
17m @ 2.31g/t Au, 0.16% Co, 0.38% WO3 and 0.16% Cu from 121m; including
o
1.7m @ 6.64g/t Au, 0.12% Co, 0.87% WO3 and 0.14% Cu from 121m and
o
5.5m @ 3.27g/t Au, 0.24% Co, 0.53% WO3 and 0.33% Cu from 132.5m.
Page 3 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Figure 3 below shows the location of this high-grade intersection in 2019FTD007E in relation to
previous drilling results and other drill holes where assay results are pending.
Figure 3: Cross Section of the Main Au-Co-WO3-Cu Mineralised Zone
Figure 4 shows core and individual assay results from 2019FTD007E 133.3m – 137.55m depth.
High-grade gold-cobaltite-scheelite enriched mineralised veining from 2019FTD007E at 129.8m
depth is shown under normal light conditions in Figure 5. For the same piece of core the scheelite
mineralisation, which assayed over 1.0% WO3 in this 0.5m sample interval, is clearly visible under
the ultraviolet light in Figure 6.
Page 4 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Figure 4: Drill hole 2019FTD007E - Fine grained, mineralised crystal tuff with sericite alteration
and abundant carbonate veins with chalcopyrite-arsenopyrite-pyrite-scheelite-cobaltite.
Figure 5: 2019FTD007E, 129.8m - Mineralised carbonate-pyrite-arsenopyrite-cobaltite-scheelite vein
(Interval 129.5-130.0m Assay: 0.5m @ 6.64g/t Au, 0.38% Co, 1.02% WO3, 0.11% Cu).
Figure 6: 2019FTD007E, 129.8m - Same segment of drill core under ultraviolet light,
highlighting intense scheelite (CaWO4) mineralisation (blue)
(Interval 129.5-130.0m Assay: 0.5m @ 6.64g/t Au, 0.38% Co, 1.02% WO3, 0.11% Cu).
Page 5 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Extension drill hole 2019FTD004E was drilled for 121.1m from 106m – 227.1m. Highlights from
this extended hole include:
•
9.1m @ 0.85g/t Au, 0.1% Co, 0.09% WO3 and 0.15% Cu, from 111.9m, including
o
2.4m @ 1.7g/t Au, 0.15% Co, 0.26% WO3 and 0.19% Cu from 118.6m.
Figure 7 below, shows mineralised core from 2019FTD004E 118 – 122m.
Figure 7: Drill hole 2019FTD004E - Fine grained volcaniclastic sandstone grading into laminated
volcaniclastic siltstone with stockwork quartz-carbonate-sulphide veining to 120.3m, then laminated
crackle brecciated siltstone with semi-massive pyrite-arsenopyrite-chalcopyrite-galena-pyrrhotite to 121m.
Drill hole FT-2023-001 was drilled to a depth of 214.8m to the south of the historic hole
2019FTD006 (9.0m @ 2.56g/t Au, 0.25% Co, 0.32% WO3, 0.1% Cu from 99.0m) at a steeper
angle to test continuity of mineralisation down dip.
Extension drill hole 2019FTD005E was drilled for 76.9m from 120.5m – 197.4m, to test the
continuation of mineralisation at depth.
Assay results from holes FT-2023-001 and 2019FTD005E are pending (see Figure 3).
Next Steps
Further updates will be provided upon receipt of all the remaining assay results.
The Company intends to undertake the next steps to advance the Firetower Project once all
assays have been received:
1. Update the geological model and interpretation;
2. Create a resource block model to enable the future estimation of mineral resources and
exploration targets;
3. Conduct preliminary metallurgical testwork, to establish potential processing solutions to
extract the polymetallic minerals, and
4. Undertake additional drilling under existing permits, focusing on extending the depth of
earlier drill holes to test for continuation of the high-grade gold-cobalt-tungsten mineralised
zone.
Page 6 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Firetower Project Background
The Firetower Project (EL26/2004) is located in northwest Tasmania, Australia, and covers an
area of 62 square kilometres. The project lies in the eastern parts of the highly mineralised Mt
Read volcanic sequence which hosts major polymetallic base metals and gold deposits such as
Hellyer and Rosebery, copper-gold deposits such as Mt Lyell (3Mt contained copper, 3.1Moz
contained gold), and the Henty gold mine (1.64Moz Au @ 12.5g/t Au) (see Figure 8).
Figure 8: Location of Flynn’s Tasmanian projects, including the Firetower Project
Exploration in the Firetower project area, beginning in the 1970s, has largely been gold focused.
Multiple but sporadic phases of drilling at the Firetower prospect has defined gold mineralisation
extending over a strike length of approximately 350m (open) and to depths of 150m from surface
(open). Anomalous cobalt and tungsten was noted by previous explorers but generally not
followed up due to the gold-focused exploration models applied at the time.
The Firetower Project is unusual in that there are few reported gold-cobalt-tungsten-copper
deposits globally.
Page 7 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Importance of Cobalt and Tungsten
Cobalt is a critical mineral with increasing demand as a key manufacturing component in the global
shift toward clean technologies. With approximately 70 percent of global cobalt production coming
from the Democratic Republic of Congo, the world will need alternative sources of this battery
metal, particularly from Tier 1 jurisdictions with strong ESG credentials such as Australia.
Tungsten is considered one of the most critical minerals due to its importance across a wide range
of applications in various fields and its inability to be substituted in many of these applications due
to its high melting point and hardness.
The Australian Federal Government recently announced its Critical Minerals Strategy 2023–2030
which sets out the government’s vision to grow Australia’s critical minerals sector.
Approved by the Board of Flynn Gold Limited.
For more information contact:
Neil Marston
Managing Director
+61 3 9692 7222
info@flynngold.com.au
Ben Creagh
Media & Investor Relations
+61 (0) 417 464 233
benc@nwrcommunications.com.au
Page 8 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
About Flynn Gold
Flynn Gold is an Australian mineral exploration company with a portfolio of exploration projects in Tasmania
and WA (see Figure 9).
The Company has nine 100% owned tenements located in northeast Tasmania (see Figure 8) and has
established a portfolio of gold-lithium exploration assets in the Pilbara and Yilgarn regions of Western
Australia. The Company also has prospective tin projects within its northeast Tasmania gold project, as well
as two zinc-silver tenements on Tasmania’s mineral-rich west coast.
In addition, Flynn Gold has the Firetower gold and battery metals project located in northern Tasmania (see
Figure 8).
For further information regarding Flynn Gold please visit the ASX platform (ASX: FG1) or the Company’s
website www.flynngold.com.au.
Figure 9: Location of Flynn Gold Projects.
Page 9 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Competent Person Statement
The information in this ASX Announcement that relates to Exploration Results is based on information
compiled by Mr Sean Westbrook, a Competent Person who is a Member of the Australian Institute of
Geoscientists. Mr Westbrook is a consultant to Flynn Gold and is a shareholder in Flynn Gold. Mr Westbrook
has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr Westbrook consents to the inclusion in the report of the matters based on his information in
the form and context in which it appears.
This announcement includes information that relates to Exploration Results prepared and first disclosed
under the JORC Code (2012) and extracted from the Company’s previous ASX announcements as noted,
and the Company’s Prospectus dated 30 March 2021. Copies of these announcements are available from
the ASX Announcements page of the Company’s website: www.flynnngold.com.au.
Forward Looking and Cautionary Statements
Some statements in this announcement regarding estimates or future events are forward-looking
statements. They include indications of, and guidance on, future earnings, cash flow, costs and financial
performance. Forward-looking statements include, but are not limited to, statements preceded by words
such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”,
“believes”, “potential”, "predict", "foresee", "proposed", "aim", "target", "opportunity", “could”, “nominal”,
“conceptual” and similar expressions. Forward-looking statements, opinions and estimates included in this
report are based on assumptions and contingencies which are subject to change without notice, as are
statements about market and industry trends, which are based on interpretations of current market
conditions. Forward-looking statements are provided as a general guide only and should not be relied on
as a guarantee of future performance. Forward-looking statements may be affected by a range of variables
that could cause actual results to differ from estimated or anticipated results and may cause the Company’s
actual performance and financial results in future periods to materially differ from any projections of future
performance or results expressed or implied by such forward-looking statements. So, there can be no
assurance that actual outcomes will not materially differ from these forward-looking statements.
References
FG1: ASX Announcement dated 1 December 2022
FG1: ASX Announcement dated 5 June 2023
FG1: ASX Announcement dated 27 October 2023
Page 10 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Appendix I
Table 1: Drill Hole Collar Details, Firetower Prospect
Drillhole ID
Easting
(m)
Northing
(m)
Elevation
(m)
Azimuth
(degrees)
Dip
(degrees)
Length
(m)
2019FTD004E
446081
5405254
611
360
-60
121.1 (106.0 - 227.1)
2019FTD005E
446105
5405238
620
360
-60
76.9 (120.5 - 197.4)
2019FTD007E
446123
5405243
628
360
-60
83.2 (98.7 - 181.9)
FT-2023-001
446100
5405253
623
360
-70
214.8
TOTAL
496.0
Notes:
• All coordinates are in MGA94 Zone 55 projection.
• Elevation for drill hole FT-2023-001 is assumed based on the RL of the adjacent surveyed drill holes
Table 2: Significant Polymetallic Mineralised Intercepts for Firetower Drillholes
Drillhole ID
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Co
(%)
WO3
(%)
Cu
(%)
2019FTD004E
111.9
121
9.1
0.85
0.1
0.09
0.15
118.6
121
2.4
1.72
0.15
0.26
0.19
124.1
125.1
1
1.65
0.08
0.29
0.32
138
139
1
0.35
0.04
0.03
0.04
99.3
102.7
3.4
0.46
0.12
0.07
0.04
102
102.7
0.7
1.16
0.24
0.33
0.01
118.1
119
0.9
0.41
0.17
0.14
0.05
including
2019FTD007E
including
121
138
17
2.31
0.16
0.38
0.16
including
121
122.7
1.7
6.64
0.12
0.87
0.14
including
132.5
138
5.5
3.27
0.24
0.53
0.33
Notes:
• Significant intercepts for polymetallic (Au-Co-W-Cu) mineralisation used a cut-off grade of 0.3g/t Au
• All reported intersections are assayed on intersections on geological intervals ranging from 0.3 – 1.3 m.
• Reported grades are calculated as length-weighted averages.
• Significant mineralised intercepts are reported as downhole lengths, true widths are currently unknown.
• NA = Not Assayed.
Page 11 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Appendix II: JORC Code Table 1 for Exploration Results –
Firetower Project
Section 1: Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
downhole gamma sondes, or handheld
XRF instruments, etc.). These examples
should not be taken as limiting the broad
meaning of sampling.
The sampling described in this report refers to the 2023 diamond drilling
campaign conducted by Flynn Gold and historic diamond drilling
completed by Greatland Gold Plc (Greatland), the previous holders of the
tenement.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Flynn Gold Diamond Drilling 2023
Aspects of the determination of
mineralisation that are Material to the
Public Report.
All samples were collected by qualified geologists or under geological
supervision. The samples are judged to be representative of the rock
drilled. The nature and quality of the sampling is carried out under
QA/QC procedures as per industry standards.
Samples consisted of NQ size diamond drill core, cut in half.
All available core was cut and sampled. Sampling intervals were a
minimum of 0.3 m and a maximum of 1.3 m (internal core loss). Where
samples were not at 1.0 m, the sample breaks were constrained by
geological structures (e.g. quartz veins, faults).
Sampling was carried out to Flynn Gold’s internal protocols and QA/QC
procedures.
Entire samples were prepared at the ALS laboratory in Burnie or
Adelaide. Samples were weighed (WEI-21), crushed (CRU-21), then
pulverized (PUL-21) to a nominal 85% passing 75 microns. The resulting
pulps were analysed for Au by Fire Assay (Au-AA26; 25 g charge) and
multi-elements including rare earths by 4 acid digest (ME-MS61r).
Greatland 2019 Diamond Drilling
Samples consisted of diamond drill core (HQ and NQ sizes) cut in half.
All available core was cut and sampled. The sampling interval was
generally 0.5 or 1 m but respects geological contacts. Sampling was
carried out under Greatland’s internal protocols and QA/QC
procedures.
Entire samples were then pulverised to a nominal 85% passing 75
microns. The resulting pulps were analysed for Au (50g charge, fire
assay) and multi-element geochemistry (4 acid digest ICP-MS) at
Intertek Laboratory Services using industry standard sample
preparation, sub-sampling, analysis and calibration methods /
protocols.
Drilling
techniques
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc.) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc.).
Flynn Gold Diamond Drilling 2023
Drilling was undertaken using a track mounted Coretech CSD1800 drill
rig. The drill rig is capable of approx. 1000 m NQ.
FT-2023-001 was cased with HWT casing to approx. 3 m. HQ sized drill
core from 0 – 25.8 m was followed by NQ drill core to end of hole.
The additional 3 holes were diamond tails on NQ sized diamond holes
drilled previously by Greatland in 2019.
These diamond tails were drilled NQ to the end of the hole.
Greatland 2019 Diamond Drilling
Drilling was undertaken using a track mounted Coretech CSD1800 drill
rig. The rig is capable of ~1000 m NQ.
Drill holes were cased with HWT casing to approx 3 m. HQ sized drill
core from 0 - ~20 m was followed by NQ drill core to the end of hole.
Page 12 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code explanation
Commentary
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed.
Flynn Gold Diamond Drilling 2023
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Length based core recovery was measured from reassembled core for
every drill run. Data was recorded into a digital RQD spreadsheet which
was then uploaded to Flynn Gold’s SQL database.
Core recovery was considered high (>95%). The drilling method
employed, including triple tube, lead to good core recovery.
Due to consistently high recovery, no relationship between grade and
recovery is evident.
Greatland 2019 Diamond Drilling
Length based core recovery was measured from reassembled core for
every drill run. Data was recorded into a laptop computer using
‘LogChief’ geological logging software.
Core recovery was considered high (>95%). The drilling method
employed, including triple tube, lead to satisfactory core recovery.
Logging
Whether core and chip samples have been
geologically and geotechnically logged to
a level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
Flynn Gold Diamond Drilling 2023
All drill core was geologically logged for lithology, mineralisation,
veining, alteration, structure and geotechnical data. Logging included
qualitative and quantitative components.
All core was digitally photographed. Log and photographs are of
satisfactory detail to support any future mineral resource estimation.
Logging was recorded into an excel template then transferred to Flynn
Gold’s SQL database. The excel template has constraints to ensure
invalid entries are minimised. Additional validation is then completed
when the data is transferred to the database by Flynn Gold’s database
managers.
Greatland 2019 Diamond Drilling
All drill core was geologically logged for lithology, mineralisation,
alteration, veining, structure and geotechnical data. This included both
qualitative and quantitative components. All core was digitally
photographed.
Logging was recorded directly into a laptop computer with ‘LogChief’
geological logging software. This software had lookup tables that do not
allow for invalid entries.
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all
subsampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
Flynn Gold Diamond Drilling 2023
All core was cut with an automated core saw in a consistent way that
preserved the bottom of hole reference line, where present. A hand
operated core saw was used on broken core to keep sample loss to a
minimum.
Sampling intervals were a minimum of 0.3 m and a maximum of 1.3 m
(internal core loss). Where samples were not at 1.0 m, the sample breaks
were constrained by geological structures (e.g. quartz veins, faults). The
sample sizes are considered appropriate for the nature of the
mineralisation.
Entire samples were prepared at the ALS laboratory in Burnie or
Adelaide. Samples were weighed (WEI-21), crushed (CRU-21), then
pulverized (PUL-21) to a nominal 85% passing 75 microns.
All staff were adequately trained for all sampling steps, with geologists
reviewing sample sheets prior to release for cutting.
Duplicate samples were assayed, split from their primary pulp at the
laboratory after crushing. Duplicate assay results were consistent with
primary assay results.
Page 13 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code explanation
Commentary
Greatland 2019 Diamond Drilling
All historical drill core was split by diamond saw and half-core sampled.
Core sampling intervals were generally on nominal 1.0m or 0.5m
intervals, but respects geological contacts in places.
Sample preparation included weighing, drying, crushing and pulverising
in full to a nominal 85% passing 75 microns.
The sample sizes are considered appropriate for the style of
mineralisation and material being sampled.
No field duplicate samples were collected / reported.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
Flynn Gold Diamond Drilling 2023
All samples were submitted for preparation at the ALS laboratory in
Burnie or Adelaide. Samples were sent to Perth for Au by AU-AA26 (25 g
charge fire assay) and multi-element with rare earths by 4 acid digest
(MS-ME61r).
Quality control procedures included use of certified reference material
(CRM’s) for assay standards and blanks. Standards and blanks were
inserted every 20 samples.
Duplicates were taken in intervals where higher gold grades were
expected, based upon visual mineralogy and texture.
Duplicates, standards and blanks passed within an acceptable level of
precision and accuracy.
Greatland 2019 Diamond Drilling
All samples were submitted for preparation at Intertek Laboratory
Adelaide, with pulp samples then submitted for analysis to Intertek
Laboratory Perth.
50g fire assay (ICP-OES) and multi-element analysis by 4 acid digestion
(ICP-MS) was completed. It is noted that over-range assays for tungsten
was not completed when the upper detection limit (200099m W) was
reached, as such historical assays may not be entirely indicative of the
grade of tungsten in certain drill holes.
Quality control procedures included use of certified reference material
(CRM’s) for assay standards and blanks. Standards and blanks were
inserted every 30 – 50 samples.
No field duplicates were collected / reported.
Verification
of sampling
and assaying
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Flynn Gold Diamond Drilling 2023
Significant intersections have been verified by multiple company
personnel.
Logging data is recorded on excel templates and stored on company
storage drives. Data is also uploaded to a central database, that is also
backed up offsite. Logging templates contain restraints to minimise data
entry errors, and data is further validated by database administrators
upon transferal to the central database.
Verified assay data is received directly from the laboratory, and stored
on company storage drives. Assay data is also received by the database
directly from the laboratory.
The assay data has not been adjusted.
No twinned holes have been drilled to date.
Greatland 2019 Diamond Drilling
No twinned holes were drilled.
Historical primary data is contained within company statutory
explora�on annual reports held on file in physical and/or digital format
by Mineral Resources Tasmania.
Page 14 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code explanation
Commentary
No adjustments have been made to any assay data other than length
weighted averaging of individual assay results within the broader
mineralised intercepts reported.
Flynn Gold recently carried out verification sampling of mineralised zones
in drill hole 2019FTD006 (quarter core re-sampling). The Flynn assayed
intercept returned 9.0m @ 2.56g/t Au, 0.25% Co, 0.32% WO3 and 0.10% Cu
from 99.0m compared to an original (Greatland Gold) intercept of 9.0m @
2.46g/t Au, 0.24% Co, 0.20% WO3 and 0.11% Cu from 99.0m. The
repeatability of the overall intercept average grade between the Flynn and
Greatland assay batches is considered good. The variation in tungsten
grade is due to an upper detection limit of 2000ppm W in the original assay
method, with no over-range W value assayed.
Location of
data points
Accuracy and quality of surveys used to
locate drillholes (collar and downhole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Flynn Gold Diamond Drilling 2023
Specification of the grid system used.
Downhole surveys were conducted every 30 m using an Axis Champ
Discover survey tool.
Quality and adequacy of topographic
control.
Drill hole collar locations were surveyed u
Share your feedback
Discover