Pegmatites identified - Forrestania/Lake Johnston Li Project
Released
Released
Announcement PDF
ASX Announcement
ASX Announcement 4 August 2023
19 January 2023
Pegmatites identified at
Forrestania/Lake Johnston
Lithium Projects
Highlights
•
Reconnaissance exploration identifies unmapped pegmatites on
newly granted Li-Au projects in prolific Forrestania and Lake
Johnston belts located in Western Australia
•
Projects located near world class Mt Holland lithium mine and the
Mt Day pegmatite field
Share Price: A$0.06
•
Six new exploration licences recently granted covering 320km2
Cash (30/06/23): A$3.8M
•
Tenements seen as highly prospective for lithium in spodumene
rich pegmatites
ASX: FG1
ABN 82 644 122 216
CAPITAL STRUCTURE
Debt: Nil
Ordinary Shares: 136.4M
Market Cap: A$8.2M
Options: 3.4M
Performance Rights: 3.7M
BOARD OF DIRECTORS
Clive Duncan
Non-Executive Chair
Neil Marston
Managing Director / CEO
Sam Garrett
Technical Director
Planning underway for geological mapping, rock chip and soil
sampling programs to cover high-priority targets
_________________________________________________________
•
Flynn Gold Limited (ASX: FG1, “Flynn” or “the Company”) is pleased to
provide an update on its 100% owned Forrestania and Lake Johnston
lithium-gold projects in Western Australia (Figure 1).
In total six exploration licences have recently been granted covering an
area of 320km2. These licences are located in the highly prospective
Southern Cross Province containing the Mt Holland lithium mine, the Mt
Day pegmatite field and multiple active exploration targets including the
Gemcutter, Giant and Medcalf pegmatites.
Non-Executive Director
An initial reconnaissance field trip has recently been completed,
successfully identifying multiple pegmatite outcrops on exploration
licence E63/2190, further enhancing the potential of the project.
COMPANY SECRETARY
Chief Executive Officer, Neil Marston commented,
John Forwood
Mathew Watkins
CONTACT
Level 4, 96-100 Albert Road,
South Melbourne,
Victoria, 3205
+61 (0) 3 9692 7222
info@flynngold.com.au
www.flynngold.com.au
“Our Forrestania project is located approximately 10 km east of the world
class Mt Holland lithium mine and our Lake Johnston licences are located
close to the Mt Day pegmatite field, the Medcalf Lithium prospect and
several other active lithium exploration targets.
“Following the grant of our exploration licences in early July the Company
has rapidly moved to commence lithium exploration at these new
projects. An initial reconnaissance field trip to the projects has identified
three previously unmapped pegmatites on E63/2190, further highlighting
the potential of this district.
“It is exciting to identify new pegmatites so quickly from reconnaissance sampling at the Lake
Johnston project. With these encouraging initial results, we are looking forward to planning
and commencing systematic exploration programs on these projects in the coming months.”
Initial Exploration Work
Six exploration licences located in the Forrestania and Lake Johnston projects were granted
in July 2023 by the Western Australian Department of Mines, Industry Regulation and Safety
(see Figure 1). The grant of these tenements marks the commencement of on-ground
exploration for lithium at the projects.
Figure 1: Flynn Gold Limited’s Forrestania and Lake Johnston project location plan.
Flynn has completed an initial reconnaissance field trip to the projects with the aim of
increasing understanding of the regional geology, potential targets, and the extent of nearby
exploration activity. Flynn has also re-processed the available open file geophysical datasets,
identifying a number of concealed exploration targets, based on interpretation of regional
structures and remnant greenstone keels, below shallow cover.
These combined activities have identified a number of targets for initial soil sampling and
geological mapping programs (see Figure 2).
Page 2 of 14 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Figure 2: Flynn Gold Limited’s tenements, lithium occurrences and proposed soil sampling programs over
combined aeromagnetic and gravity image
In total seven rock chip samples were taken at the Lake Johnston project during the
reconnaissance field trip (refer to Table 1 and Appendix 1 for further details). Three new
pegmatites were located on E63/2190 (see Figure 3), within a region characterised by
moderate areas of amphibolite outcrop and large areas of residual soil, colluvium and
sheetwash alluvial cover. Five rock chip samples (LJ001 to LJ005) were collected from
subdued, weathered outcrop of these pegmatites (see Figures 3 to 6).
These samples returned assay results with elevated background levels of rubidium (188 to
396ppm Rb), bismuth (0.4 to 34.2ppm Bi) and tantalum (0.8 to 8.7ppm Ta). The identification
of these three new pegmatites with strong pathfinder element support from a brief
reconnaissance field trip, highlights the exploration potential of these projects.
Further Exploration Work
Flynn’s future work programs for the Forrestania and Lake Johnston projects include further
geological mapping and rock chip sampling in areas of outcrop, and systematic soil sampling
in areas of shallow cover. The soil programs will be designed to cover targets derived from the
interpretation of regional geophysical datasets, in particular over buried greenstone remnants
and major regional structures. Initial air core drilling programs will be considered pending
results of the early-stage assessment programs.
Page 3 of 14 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Further interpretation of multi-client aeromagnetic and gravity data will be undertaken to assist
with interpretation of the geology and the identification of additional target zones. A detailed
gravity survey may also be considered to assist with targeting and the interpretation.
Flynn plans to commence follow-up exploration on these projects, with initial soil sampling,
geophysical modelling and geological mapping programs. Exploration will also target a 5km
zone along strike, to the north and south of pegmatites delineated on E63/2190 (see Figure
3).
Figure 3: Reconnaissance rock chip sample locations, and mapped pegmatites over aeromagnetic image.
Page 4 of 14 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Figure 4: Pegmatite sample LJ0001 (left) and LJ0002 (right) – both from the eastern pegmatite
Figure 5: Pegmatite sample LJ0003 - western pegmatite (left) and LJ0004 (right) - central pegmatite
Figure 6: Pegmatite sample LJ0005, central pegmatite (left) outcrop of eastern pegmatite (right)
Page 5 of 14 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Table 1 - Lake Johnston Reconnaissance Rock Chip Sample Assay Results
Sample
East
North
Tenement
Au
Ba
Be
Bi
La
Li
Nb
Rb
Sn
Ta
LJ0001
292545
6390882
E63/2190
0.001
115
0.7
0.4
2.19
26
2.9
382.0
BDL
0.8
LJ0002
292548
6390997
E63/2190
0.001
63
1.7
34.2
2.88
26
14.4
233.0
7
1.6
LJ0003
292009
6390566
E63/2190
BDL
26
2.4
0.4
5.05
3
14.5
188.5
5
3.3
LJ0004
292462
6391129
E63/2190
BDL
47
3.4
10.9
1.7
13
16.7
396.0
6
8.7
LJ0005
292458
6391074
E63/2190
0.002
104
3
4
1.8
17
14.9
344.0
5
6.8
LJ0006
290648
6395266
E63/2190
BDL
377
1
0.1
9.16
8
3.8
121.5
5
0.5
LJ0007
268387
6437185
E63/2188
0.002
913
0.5
0.3
3.26
10
7.7
124.0
5
0.5
Notes:
•
•
•
•
•
All reconnaissance rock chip samples collected listed in table, results displayed include gold and a selected
suite of lithium pathfinder elements.
Au units are in ppb, all other elements in ppm.
Collar location and orientation information coordinates are MGA Zone 51, AHD RL.
See Appendix 1 for additional details.
BDL - below detection level.
Approved by the Board of Flynn Gold Limited.
For more information contact:
Neil Marston
Managing Director & CEO
+61 3 9692 7222
info@flynngold.com.au
Victoria Humphries / Ben Creagh
Media & Investor Relations
+61 (0) 431 151 676 / +61 (0) 417 464 233
victoria@nwrcommunications.com.au /
benc@nwrcommunications.com.au
Page 6 of 14 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
About Flynn Gold Limited
Flynn Gold is an Australian mineral exploration company with a portfolio of projects in Tasmania and
Western Australia (see Figure 7). The Company has eight 100% owned tenements located in northeast
Tasmania which are highly prospective for gold as well as tin/tungsten. The Company also has two zinclead-silver tenements on Tasmania’s mineral-rich west coast. In addition, Flynn Gold has recently
purchased the Warrentinna gold project and the Firetower gold and battery metals project from
Greatland Gold plc, both located in northern Tasmania.
Flynn has also established a portfolio of gold-lithium exploration assets in the Pilbara and Yilgarn regions
of Western Australia.
For further information regarding Flynn Gold please visit the ASX platform (ASX: FG1) or the Company’s
website www.flynngold.com.au.
Figure 7: Location Plan of Flynn Gold Projects
Page 7 of 14 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Competent Person Statement
The information in this ASX Announcement that relates to Exploration Results is based on information
compiled by Mr David Archer, a Competent Person who is a Member of the Australian Institute of
Geoscientists. Mr Archer is a consultant to Flynn Gold. Mr Archer has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration and to the activity being
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Archer consents to the
inclusion in the report of the matters based on his information in the form and context in which it appears.
This announcement includes information that relates to Exploration Results prepared and first disclosed
under the JORC Code (2012) and extracted from the Company’s previous ASX announcements as
noted, and the Company’s Prospectus dated 30 March 2021. Copies of these announcements are
available from the ASX Announcements page of the Company’s website: www.flynnngold.com.au.
The Company confirms that it is not aware of any new information or data that materially affects the
information included within the Prospectus dated 30 March 2021.
Forward Looking and Cautionary Statements
Some statements in this announcement regarding estimates or future events are forward-looking
statements. They include indications of, and guidance on, future earnings, cash flow, costs and financial
performance. Forward-looking statements include, but are not limited to, statements preceded by words
such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”,
“believes”, “potential”, "predict", "foresee", "proposed", "aim", "target", "opportunity", “could”, “nominal”,
“conceptual” and similar expressions. Forward-looking statements, opinions and estimates included in
this report are based on assumptions and contingencies which are subject to change without notice, as
are statements about market and industry trends, which are based on interpretations of current market
conditions. Forward-looking statements are provided as a general guide only and should not be relied
on as a guarantee of future performance. Forward-looking statements may be affected by a range of
variables that could cause actual results to differ from estimated or anticipated results and may cause
the Company’s actual performance and financial results in future periods to materially differ from any
projections of future performance or results expressed or implied by such forward-looking statements.
So, there can be no assurance that actual outcomes will not materially differ from these forward-looking
statements.
Page 8 of 14 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
APPENDIX 1:
LAKE JOHNSTON ROCK CHIP SAMPLING RESULTS
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code Explanation
Commentary
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
Rock chip sampling: A total of 7 samples (including
standards and duplicates) were collected by Flynn Gold
Limited over the Lake Johnston project during July 2023.
The reconnaissance rock chip sampling program was
designed to provide an initial reconnaissance test for
exploration licences E63/2188 and E63/2190.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation
that are Material to the Public Report.
In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as
where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
The reconnaissance rock chip samples were collected at
selected outcrops from exploration licences E63/2188
and E63/2190.
All geochemical sampling completed by Flynn Gold
Limited was located on GDA94 using a GPS.
Samples were collected in the field by taking a
representative 3-5kg rock sample from outcrop.
Industry-standard sampling practices for rock chip
sampling adopted.
The collected sample was placed in a pre-numbered
calico sample bag.
Flynn Gold Limited submitted all rock chip samples to
ALS – Perth for analysis, utilising sample preparation by
crusher/rotary splitter combination with the sample
crushed to 70% less than 2mm, rotary split off 250g,
pulverise split to better than 85% passing 75 microns
(ALS Code: PREP-31Y). The rock chip samples were
analysed for gold by 50g fire assay and ICP-AES finish
(ALS Code: Au-ICP22) and trace level lithium elements
were assayed by a sodium peroxide fusion and MS finish
(ALS Code: ME-MS89L).
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc).
No drilling completed.
Drill sample
recovery
Method of recording and assessing core and chip
sample recoveries and results assessed.
No drilling completed.
Measures taken to maximise sample recovery
and ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
No drilling completed.
Geological logging was completed to an appropriate
level of detail for the reconnaissance rock chip sampling
program.
Qualitative geological logging was completed using a
standard set of codes.
Samples were logged in their entirety.
Page 9 of 14 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code Explanation
Commentary
photography.
The total length and percentage of the relevant
intersections logged.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter,
half or all core taken.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
No drilling completed.
Sample depth (nominally at surface from outcrop) and
location of rock chip sample recorded at each site.
Representative rock chip samples were placed directly
into pre-numbered calico bags at the site location from
which they were collected.
Standards were submitted by ALS.
The sampling practices were suitable for the stage of
exploration.
Sample sizes were considered appropriate for the grain
size of the sampled material.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels
of accuracy (i.e. lack of bias) and precision have
been established.
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
Flynn Gold Limited submitted all rock chip samples to
ALS – Perth for analysis utilising sample preparation by
crusher/rotary splitter combination with the sample
crushed to 70% less than 2mm, rotary split off 250g,
pulverise split to better than 85% passing 75 microns
(ALS Code: PREP-31Y). The rock chip samples were
analysed for gold by 50g fire assay and ICP-AES finish
(ALS Code: Au-ICP22) and trace level lithium elements
were assayed by a sodium peroxide fusion and MS finish
(ALS Code: ME-MS89L).
Gold detection limit of 0.001 ppm Au (1 part per billion).
Trace level lithium elements.
No geophysical tools or other non-assay instrument
types were used in the analyses reported.
Standards and duplicates were inserted by ALS
Analyses were undertaken at recognized industry
specific laboratory. It is therefore expected that the
reported assay results achieved acceptable levels of
accuracy and precision for the relevant analytical
method employed.
Not relevant for surface samples.
No hole twinning was undertaken.
Sample results and standards were reviewed by the
Page 10 of 14 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code Explanation
Commentary
The use of twinned holes.
company’s technical consultants.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Results are uploaded into the company database,
checked and verified.
Discuss any adjustment to assay data.
All data is stored in a Company database system and
maintained by the Database Manager.
There were no adjustments to assay data.
Location of data
points
Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used
in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing
and distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositing has been applied.
Rock chip sample locations are located by handheld GPS
to an accuracy of +/-5m.
Locations are given in GDA94 Zone 51.
Diagrams showing sample locations are provided in the
report.
The topographic control is judged as adequate for
geochemical samples.
The reconnaissance rock chip samples were collected
from selected outcrops on exploration licences
E63/2188 and E63/2190. Follow up rock chip sampling
may be considered to tighten and better resolve areas
of anomalous gold, lithium and pathfinder
mineralisation. Further rock chips may be undertaken to
provide better definition of some anomalies.
Not applicable for the reporting of geochemical
sampling results.
Not applicable for the reporting of geochemical sampling
results.
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
If the relationship between the drilling orientation
and the orientation of key mineralised structures
is considered to have introduced a sampling bias,
this should be assessed and reported if material.
Not applicable, this is early-stage exploration
geochemical sampling and the orientation of sampling
to the mineralisation is not fully known. The data is
primarily an initial exploration reconnaissance sampling
program and is useful for identifying broad geological
trends.
No mineralisation identified to date. Sampling was taken
as close as possible to points of interest identified from
the interpretation of the aerial photography, and
satellite and magnetic imagery before entering the field.
The orientation of sampling is considered appropriate
with respect to the structure and targets being tested
and the reconnaissance nature of the sampling.
Not applicable for this type of sampling.
Sample security
The measures taken to ensure sample security.
Samples were bagged into numbered plastic RC green
bags and transported to the laboratory in Perth by Flynn
Gold Limited.
The laboratory was sent a sample submission sheet
detailing the sample numbers, method of sample
preparation and analyses and a full list of analytes. The
sample submission sheet was cross referenced with the
samples on arrival at the laboratory. No sample
preparation or analyses was to commence if there were
any discrepancies.
Audits or
reviews
The results of any audits or reviews of sampling
techniques and data.
Sampling and assaying techniques are industrystandard.
No external audit has been completed.
Page 11 of 14 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code Explanation
Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The Lake Johnston project targets that were sampled
occur within exploration licences E63/2188 and
E63/2190 which are 100% owned by Flynn Gold
Limited.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
The tenements are located approximately 206km
southwest of Southern Cross, in the Southern Cross
region of Western Australia.
Access to the project areas were achieved from the
Hyden to Norseman Road, taking the Windy Hill camp
turn off road to the Maggie Hayes airstrip then past
Honman Ridge, Burmeister Hill, past the Lake Medcalf
turnoff, then via bush tracks to the east of Mt Glasse.
Alternatively, the tenements can be accessed from the
south, from the Lake King to Norseman Road, then via
bush tracks into the southern boundary of E63/2190.
The tenements are located within the Dundas Mineral
Field, 63 of Western Australia. The project lies on
unallocated crown land.
The tenements are located on Ngadju Determined
Claim (WCD 2014/004) administered by the Native Title
Services Goldfields (ARB 13).
There are no impediments to the security of
tenements. The tenements are in good standing and
there are no known impediments to exploration on the
properties.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by
other parties.
Previous historical exploration work by other companies
includes geochemical surface sampling, mapping,
airborne and surface geophysical surveys, AC and RC
drilling.
Historical geochemical samples have been collected by
previous explorers including but not limited to Norilsk
Nickel Ltd, Forrestania Gold NL, Lionore Australia Ltd,
Maggie Hayes Nickel NL, White Cliff Minerals Ltd, Lake
Johnston Pty Ltd, Hannans Reward Ltd, and Poseidon
Nickel Ltd.
Geology
Deposit type, geological setting and style of
mineralisation.
Exploration at the Lake Johnston project is targeting
pegmatite style lithium-tantalum deposits such as Mt
Holland and Archaean structurally controlled
mesothermal lode gold deposits. Secondary targets
include komatiite hosted nickel mineralisation such as
Flying Fox.
The Medcalf lithium project is located just 12km to the
northeast of E63/2190 and the Mt Day pegmatite field is
located 5km northwest of E63/2188.
The Lake Johnston rock chip sampling program was
designed to target for pegmatite hosted lithium-cesiumtantalum (LCT) mineralisation. In the Southern Cross
region, lithium-rich pegmatites have a spatial,
geochemical and geochronological association with
post-tectonic granitic supersuite intrusions (i.e. Mt
Holland).
Page 12 of 14 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
Drill hole
Information
JORC Code Explanation
Commentary
A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
Material drill holes:
Not applicable for the reporting of geochemical sampling
results. No Drilling undertaken.
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length.
If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
Flynn Gold Limited has reported raw assays for rock chip
sampling with no further criteria applied.
Not applicable for the reporting of soil sampling results.
No metal equivalent values are used.
Where aggregate intercepts incorporate short
lengths of high-grade results and longer lengths
of low-grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown
in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in
the reporting of Exploration Results.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
If it is not known and only the down hole lengths
are reported, there should be a clear statement
to this effect (e.g. ‘down hole length, true width
not known’).
Rock chip sampling generate a set of point data. In
aggregation these may define an anomaly whose size
and geometry becomes apparent. No structural context
is gleaned from this dataset.
Not applicable for the reporting of rock chip sampling
results.
Not applicable for the reporting of rock chip sampling
results.
Diagrams
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported These
should include, but not be limited to a plan view
of drill hole collar locations and appropriate
sectional views.
Refer to body of this announcement.
Balanced
reporting
Where comprehensive reporting of all Exploration
Results is not practicable, representative
reporting of both low and high grades and/or
widths should be practiced to avoid misleading
reporting of Exploration Results.
The reporting level is appropriate for first pass
exploration. The results obtained justify further work
on the project. Results have been reported for the main
elements targeted (Au, Ag, Ba, Be, Bi, Cu, La, Li, Nb, Ni,
Rb, Sn, Ta) for all rock chip samples. Interpretation of
other elements included in the assay method is ongoing.
Results summarised in the report are referenced to
appropriate detail for the size of the dataset, ranges of
results are not provided as it is a
Share your feedback
Discover