More High-Grade Gold at Trafalgar Prospect, NE Tasmania
Released
Released
Announcement PDF
ASX Announcement
11 May 2023
More High-Grade Gold
at Trafalgar Prospect, NE Tasmania
Highlights
•
ASX: FG1
Infill assays received for diamond drill hole TFDD005B, recording a
significant high-grade gold interval close to the end of the hole
o
ABN 82 644 122 216
CAPITAL STRUCTURE
Share Price: A$0.073
Cash (31/03/23): A$5.0M
Debt: Nil
Ordinary Shares: 133.9M
Market Cap: A$9.8M
•
Options: 3.4M
Performance Rights: 4.2M
BOARD OF DIRECTORS
Clive Duncan
Non-Executive Chair
Managing Director / CEO
Neil Marston
Sam Garrett
COMPANY SECRETARY
3.5m @ 8.33g/t Au from 379.5m including
2.0m @ 13.75g/t Au from 380.3m;
6.0m @ 0.52g/t Au from 230.0m;
1.0m @ 1.42g/t Au from 249.0m;
2.0m @ 1.47g/t Au from 311.0m, and
2.0m @ 0.74g/t Au from 332.0m.
Previously announced significant results1 in hole TFDD005B:
14.7m @ 5.5g/t Au and 6.0g/t Ag from 109.4m, including
0.6m @ 109.0g/t Au and 96.1g/t Ag from 121.8m;
0.7m @ 4.64g/t Au from 160.5m;
2.75m @ 2.49g/t Au from 173.0m including
0.75m @ 7.44g/t Au from 175.0m, and
2.3m @ 19.0g/t Au and 4.5g/t Ag from 345.7m, including
0.9m @ 47.8g/t Au and 18.7g/t Ag from 346.1m.
The TFDD005B results provide further evidence of the growing scale of
the multi-vein system at Trafalgar.
•
Phase 2 drilling continues with TFDD010 currently being drilled,
targeting extensions of high-grade mineralisation observed in
TFDD005B.
•
Additional laboratory results from Phase 1 and Phase 2 drilling at
Trafalgar to follow.
Non-Executive Director
Mathew Watkins
•
Technical Director
John Forwood
TFDD005B:
Chief Executive Officer, Neil Marston comments,
CONTACT
Level 4, 96-100 Albert Road,
South Melbourne,
Victoria, 3205
+61 (0) 3 9692 7222
info@flynngold.com.au
www.flynngold.com.au
“Flynn Gold’s diamond drilling program at the Trafalgar prospect continues to
deliver exciting high-grade gold results.
“The latest assays reveal further significant gold intersections, in addition to
the exceptional results previously reported for this hole. This is a clear
indication of the growing scale and significant potential of the multi-vein
system at Trafalgar.
1 See FG1 ASX Announcements dated 19 January and 24 March 2023 for full details.
“The Trafalgar discovery emphasises the potential of the Golden Ridge Project to host
additional gold deposits which collectively enhance the Company’s aim of establishing a
significant gold mineral resource at the Project.
“The Company is awaiting laboratory assays for over 500 core samples from Phase 1 and the
first hole on Phase 2 drilling and we look forward to updating the market with these results as
they become available over the coming weeks.”
Flynn Gold Limited (ASX: FG1, “Flynn” or “the Company”) is pleased to provide an update on
drilling results from the Trafalgar Prospect, which is part of the Company’s 100% owned
Golden Ridge Project in Northeast Tasmania (see Figure 1).
Figure 1: Flynn Gold’s Golden Ridge Project, NE Tasmania, showing prospect areas.
Page 2 of 15 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Phase 1 Trafalgar Drilling
Phase 1 diamond drilling at the Trafalgar Prospect was completed in February 2023 with 7
diamond holes completed (TFDD002-TFDD008).
Results reported previously have been highly encouraging and include the best gold
intersections recorded to date at Golden Ridge, of 12.3m @ 16.8g/t Au from 108.7m in
TFDD005 2. The latest results from infill sampling of drill hole TFDD005B are set out in Table
2, with significant intersections shown in Figures 2 and 3 below.
Figure 2: Drill hole location plan, Trafalgar Prospect, Golden Ridge Project.
Significant intercepts are reported as downhole lengths.
2 See FG1 ASX Announcement dated 12 December 2022 for full details.
Page 3 of 15 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
The Phase 1 drilling has successfully intersected high-grade gold in multiple vein-zones over
a strike length of approximately 200m and to depths of up to 400m from surface, confirming a
significant new gold discovery at Trafalgar. The main gold-bearing mineralised zones at
Trafalgar, currently referred to as T1, T2, TM and T4, remain open along strike and at depth.
Several batches of core samples, mainly from drill holes TFDD007 and parts of TFDD008,
remain outstanding to complete laboratory analysis of the Phase 1 core.
Figure 3: Drill Section C-C’ showing Significant Au Intercepts and Interpreted Mineralised Zones
Page 4 of 15 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Phase 2 Trafalgar Drilling
The first hole of the Company’s Phase 2 drilling program at Trafalgar (TFDD009) was
completed to a depth of 213 metres (see Figure 2) and was designed to test the western
extension of the Trafalgar vein system. The first batch of TFDD009 samples, from 179 – 213
metres depth have been submitted for laboratory analysis with the remainder of the hole being
logged and cut ahead of sample submission.
Hole TFDD010 has commenced to test the eastern and depth extension of the high-grade
mineralisation observed in TFDD005B (see Figure 3).
The next drillhole will be re-entry of TFDD008 to extend the hole to intercept the T1 mineralised
zone and test for continuity of the intercepts reported here from hole TFDD005B.
The location of other additional planned holes is shown in Figure 2.
Approved by the Board of Flynn Gold Limited.
For more information contact:
Neil Marston
Managing Director and
Chief Executive Officer
+61 3 9692 7222
info@flynngold.com.au
Victoria Humphries / Ben Creagh
Media & Investor Relations
+61 (0) 431 151 676 / +61 (0) 417 464 233
victoria@nwrcommunications.com.au /
benc@nwrcommunications.com.au
Table 1: Location Data for Phase 2 Trafalgar Drillholes (FG1 Drilling)
Note:
•
Drillhole ID
Easting
(m)
Northin
g (m)
Elevation
(m)
TFDD009
588074
5416557
180
Azimuth
(degrees
)
150
TFDD010
588367
5416649
178
164
Dip
(degrees)
Final Length
(m)
-55
213.0
250.0
(planned)
Co-ordinate projection is MGA94, zone 55.
Page 5 of 15 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
-53
Table 2 - Significant Intercepts Reported for Trafalgar Prospect Drillhole TFDD005B
Drillhole ID
From (m)
To (m)
TFDD005B
92.0
104.0
105.0
109.4
109.4
117.0
120.0
121.8
124.1
135.0
154.0
159.0
160.5
161.2
173.0
175.0
175.75
199.0
200.0
214.0
228.0
230.0
236.0
249.0
250.0
311.0
313.0
332.0
334.0
339.0
340.0
345.7
346.1
348.0
355.0
379.5
380.3
383.0
104.0
105.0
109.4
124.1
111.0
124.1
123.0
122.4
135.0
154.0
159.0
160.5
161.2
173.0
175.75
175.75
199.0
200.0
214.0
228.0
230.0
236.0
249.0
250.0
311.0
313.0
332.0
334.0
339.0
340.0
345.7
348.0
347.0
355.0
379.5
383.0
382.3
384.0 (EOH)
including
and
including
including
including
including
New
including
Notes:
•
•
•
•
•
•
•
Interval (m)
1.0
14.7
1.6
7.1
3.0
0.9
5.0
0.7
2.75
0.75
1.0
Au (g/t)
NSI
NSI
NSI
NSI
NSI
NSI
NSI
1.07
5.52
4.95
10.22
23.05
109.0
0.36
4.64
2.49
7.44
0.83
NSI
Assays Pending
NSI
6.0
0.52
NSI
1.0
1.42
NSI
2.0
1.47
NSI
2.0
0.74
NSI
1.0
1.49
NSI
2.3
19.0
0.9
47.85
NSI
NSI
3.5
8.33
2.0
13.75
NSI
Comment
Previous
Previous
Previous
Previous
Previous
Previous
Previous
Previous
Previous
Previous
Updated
Previous
Previous
Previous
Previous
Previous
Updated
New
New
New
New
New
New
New
New
New
New
New
New
Previous
Previous
Previous
Previous
Previous
New
New
New
New
All reported intersections are assayed on geological intervals ranging from 0.3 to 2m.
Intercepts cut-off grade is 0.3g/t gold.
Reported grades are calculated as length-weighted averages.
Intercepts are downhole lengths.
NSI means No Significant Intercept.
Drill core samples are analysed for gold by fire assay (50-gram charge) with an AAS finish
(ALS method code Au-AA26). Samples returning gold values in excess of 100g/t Au are reassayed using a gravimetric finish.
Intervals may include up to 4 metres of internal waste.
Page 6 of 15 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
About Flynn Gold
Flynn Gold is an Australian mineral exploration company with a portfolio of exploration projects in
Tasmania and WA. The Company has eight 100% owned tenements located in northeast Tasmania
(see Figure 4) and has established a portfolio of gold-lithium exploration assets in the Pilbara and
Yilgarn regions of Western Australia. The Company also has prospective tin projects within its northeast
Tasmania gold project, as well as two zinc-silver tenements on Tasmania’s mineral-rich west coast.
In addition, Flynn Gold has secured options to purchase the Warrentinna gold project located in
northeast Tasmania (see Figure 4) and the Firetower gold and battery metals project from Greatland
Gold plc 3.
For further information regarding Flynn Gold please visit the ASX platform (ASX: FG1) or the Company’s
website www.flynngold.com.au.
Figure 4: Location of Flynn Gold tenements in NE Tasmania.
3
See FG1 ASX Announcement dated 1 December 2022 for further details.
Page 7 of 15 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Competent Person Statement
The information in this ASX Announcement that relates to Exploration Results is based on information
compiled by Mr Sean Westbrook, a Competent Person who is a Member of the Australian Institute of
Geoscientists. Mr Westbrook is a consultant to Flynn Gold and is a shareholder in Flynn Gold. Mr
Westbrook has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’. Mr Westbrook consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
This announcement includes information that relates to Exploration Results prepared and first disclosed
under the JORC Code (2012) and extracted from the Company’s previous ASX announcements as
noted, and the Company’s Prospectus dated 30 March 2021. Copies of these announcements are
available from the ASX Announcements page of the Company’s website: www.flynnngold.com.au.
The Company confirms that it is not aware of any new information or data that materially affects the
information included within the Prospectus dated 30 March 2021.
Forward Looking and Cautionary Statements
Some statements in this announcement regarding estimates or future events are forward-looking
statements. They include indications of, and guidance on, future earnings, cash flow, costs and financial
performance. Forward-looking statements include, but are not limited to, statements preceded by words
such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”,
“believes”, “potential”, "predict", "foresee", "proposed", "aim", "target", "opportunity", “could”, “nominal”,
“conceptual” and similar expressions. Forward-looking statements, opinions and estimates included in
this report are based on assumptions and contingencies which are subject to change without notice, as
are statements about market and industry trends, which are based on interpretations of current market
conditions. Forward-looking statements are provided as a general guide only and should not be relied
on as a guarantee of future performance. Forward-looking statements may be affected by a range of
variables that could cause actual results to differ from estimated or anticipated results and may cause
the Company’s actual performance and financial results in future periods to materially differ from any
projections of future performance or results expressed or implied by such forward-looking statements.
So, there can be no assurance that actual outcomes will not materially differ from these forward-looking
statements.
Page 8 of 15 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
JORC Code Table 1 for Exploration Results –
Golden Ridge Project Drilling
Section 1: Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as downhole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
The sampling described in this report refers to diamond (DD)
drilling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
Sampling is guided by Flynn’s protocols and Quality Control
procedures, as per industry standards.
Samples were all collected by qualified geologists or under
geological supervision.
The samples are judged to be representative of the rock being
drilled.
The nature and quality of sampling is carried out under QAQC
procedures as per industry standards.
Diamond core is sampled to geological boundaries with
sample lengths generally between 0.3m and 2.0m.
The core is cut on site and half core sampled. The remaining
half core is stored on site.
Care is taken when sampling the diamond core to sample the
same half side of the core as standard practice.
During sampling of the diamond drill core, certified reference
material (CRM) standards are inserted at least every 20
samples. Blank samples are also inserted at least every 20
samples. Duplicate samples are routinely submitted and
checked against originals.
Aspects of the determination of
mineralisation that are Material to the Public
Report.
Whole samples were pulverised and split to produce a 50g
charge for fire assay (ALS Au-AA26 method).
All samples are pulverised to nominal 85% passing 75 microns
before being split for analyses.
Coarse gold was observed in some drill core intervals.
Additional sampling using various techniques and duplicate
samples is ongoing to allow an assessment of any sampling
issues. Current results appear to be consistent with historical
drilling assay results associated with coarse visible gold.
Drilling
techniques
Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger,
Bangka, sonic, etc.) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc.).
Drilling is undertaken by diamond core technique at triple
tube PQ3 (83.1mm diameter),HQ3 (61.1mm diameter), and
NQ3 (42mm) core sizes.
The drill rig used for Trafalgar drillholes TFDD004-008 was a
skid mounted Boart Longyear LF70.
The drill rig currently in use at Trafalgar (Phase 2) is an Atlas
Copco Skid mounted CS1000 P4.
Industry standard diamond drilling techniques are used.
HQ core is orientated using the Boart Longyear Truecore UPIX
core orientation system or similar.
Hole traces are surveyed using a digital down-hole survey
camera tool.
The location of each hole was recorded by handheld GPS with
positional accuracy of approximately +/-5m. Location data
was collected in MGA94 zone 55.
Drill holes are planned to intersect mineralisation at an
optimum angle.
Page 9 of 15 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code explanation
Commentary
Drill sample
recovery
Method of recording and assessing core and
chip sample recoveries and results assessed.
Core recovery was logged and recorded in the company’s
database.
Measures taken to maximise sample
recovery and ensure representative nature of
the samples.
The core recovery is logged for each run of drilling and
measured against the drilled length.
Triple tube diamond core drilling techniques are used.
Generally, sample weights are comparable, and any bias is
considered negligible.
Logging
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
No relationship has been noticed between sample recovery
and grade.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
All diamond core holes are geologically logged in full for core
recovery, RQD, geotechnical parameters, weathering,
oxidation, lithology, grainsize, alteration, mineralisation, vein
types and vein intensity, structure, and magnetic
susceptibility.
The geological logging was done using a standardised logging
system. This information and the sampling details were
transferred into Flynn Gold’s drilling database.
The geological and geotechnical logging is considered to be
completed to a sufficient level to support appropriate future
geological, Mineral Resource estimation, mining, and
metallurgical studies.
Subsampling
techniques
and sample
preparation
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
Logging is both qualitative and quantitative in nature.
The total length and percentage of the
relevant intersections logged.
All drill holes are logged in full and to the total length of each
hole.
If core, whether cut or sawn and whether
quarter, half or all core taken.
The core is cut on site and half core sampled. The remaining
half core is stored on site.
Drill core is photographed as wet and dry, and before (full
core) and after cutting (half core).
Care is taken when sampling the diamond core to sample the
same half side of the core as standard practice.
Large diameter core drilling (PQ, HQ) is utilised to maximise
recovery and obtain larger samples to maximise
representivity of samples.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
N/A for DD drilling
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Samples were transported by road to ALS Global laboratories
in Tasmania.
The sample preparation for all samples follows industry best
practice.
At the laboratory all samples are weighed, dried, crushed and
pulverised (to 85% passing 75 microns) prior to sub-sampling
for assay.
Standardised equipment used with QC performed at the
pulverisation stage at the labs.
Quality control procedures adopted for all
subsampling stages to maximise
representivity of samples.
Flynn Gold has protocols that cover the sample preparation
at the laboratories and the collection and assessment of data
to ensure that accurate steps are used in producing
representative samples.
Page 10 of 15 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code explanation
Commentary
The crusher and pulveriser are flushed with barren material
at the start of every batch.
Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
Sampling is carried out in accordance with Flynn Gold’s
protocols as per industry best practice.
Field QC procedures involve the use of certified reference
material as assay standards and blanks, as well as coarse
crush duplicates.
For analysis of diamond core, CRM standards and blanks are
inserted by the field Geologist at intervals accounting for 7 to
10% of total samples which is considered to be to industry
standards.
CRM results over low-, moderate-, and high-grade gold
ranges indicate acceptable levels of accuracy and precision of
assay batch results.
Quality of
assay data
and
laboratory
tests
Whether sample sizes are appropriate to the
grain size of the material being sampled.
Sample sizes are considered appropriate for the style of
mineralisation sought.
The nature, quality and appropriateness of
the assaying and laboratory procedures used
and whether the technique is considered
partial or total.
All rock and drill core samples are sent to ALS (Burnie) for
sample preparation and sub-sampling prior to being on-sent
to ALS Townsville, Brisbane, or Adelaide labs for assay.
All drill core samples are analysed for gold by fire assay (50gram charge) with an AAS finish (ALS method code Au-AA26).
Over-range gold samples are re-assayed using a gravimetric
finish These techniques are considered total in nature and is
an industry standard technique.
Multielement assaying done on selected samples. ALS
method code ME-MS61. This is a four-acid digest with ICP-MS
finish.
Flynn Gold has its own internal QAQC procedure involving the
use of certified reference material (CRM) standards, blank
(non-mineralised) materials, and duplicate samples.
ALS laboratories are accredited to ISO/IEC standards.
External laboratory checks have not been used to date.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
No geophysical tools were used to determine any element
concentrations
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Sample preparation checks for fineness were carried out by
the laboratory as part of their internal procedures to ensure
the grind size of 90% passing 75 microns.
Internal laboratory QAQC checks are reported by the
laboratory.
Review of the internal laboratory QAQC suggests the
laboratory is performing within acceptable limits.
Verification
of sampling
and assaying
The verification of significant intersections by
either independent or alternative company
personnel.
All reported data was subjected to validation and verification
by company personnel prior to reporting.
The use of twinned holes.
Flynn Gold is yet to twin any of the historical drill holes.
However, confirmation drilling is being carried out within
close proximity to previous drillholes to verify historical
drilling grade and widths.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Primary data is collected both manually onto paper logging
forms and digitally using a field laptop computer using inhouse logging codes.
Page 11 of 15 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code explanation
Commentary
The data is checked and verified prior to entering into a
master database.
Flynn Gold has done sufficient verification of the data, in the
Competent Person’s opinion to provide sufficient confidence
that sampling was performed to adequate industry standards
and is fit for the purpose of planning exploration programs
and generating targets for investigation.
Discuss any adjustment to assay data.
All original drilling and logging records are kept on file.
No adjustments have been made to any of the assay data.
Location of
data points
Data spacing
and
distribution
Accuracy and quality of surveys used to
locate drillholes (collar and downhole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Drill hole collars are pegged before drilling and surveyed
using a handheld GPS to a lateral accuracy of +/-5m.
Specification of the grid system used.
All Flynn Gold samples are surveyed in the MGA 94 Zone 55
grid system.
Quality and adequacy of topographic
control.
RL’s have been assigned from high-precision LIDAR data.
Data spacing for reporting of Exploration
Results.
Drilling holes are currently planned on section lines generally
spaced at 100 to 200m apart.
Final collar locations are surveyed again upon completion of
drilling.
A Mineral Resource estimate has not been determined.
Further surveying using high-accuracy DGPS is planned.
Current drill hole locations are planned based specific
exploration targets, with consideration also given to
accessibility and other constraints.
Refer to figures in text and drill hole collar information
included in the report.
Orientation
of data in
relation to
geological
structure
Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
A Mineral Resource or Ore Reserve has not been determined.
Whether sample compositing has been
applied.
There was no sample compositing.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
The orientation of controlling structures has not been fully
determined and a variety of drill orientations are being used
to investigate controlling structures.
As best as practicable, drill holes were designed to intercept
interpreted or known targets and structures at a high angle.
Flynn Gold recognises the importance of understanding the
structural controls on mineralisation and has prioritised the
collection of oriented drill core early in in its exploration
drilling.
Drill holes have been designed to intersect the main lithology
and known vein orientations at appropriate orientation to
maximise structural, geotechnical and geological data.
Sample
security
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
From the information available, no sampling bias issues have
been identified to date.
The measures taken to ensure sample
security.
The chain of custody for all Flynn Gold samples from
collection to dispatch to assay laboratory is managed by Flynn
Gold personnel.
Page 12 of 15 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Criteria
JORC Code explanation
Commentary
The level of security is considered appropriate for exploration
surface sampling programs.
Sampling was undertaken and samples transported directly
to the ALS laboratory in Burnie by Flynn Gold company
employees or contractors.
No third party have been allowed to access the samples.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
No audits or reviews have been carried out at this time.
Due to the early stage of exploration, project-specific
standard and technical procedures are still being adjusted.
Section 2: Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and land
tenure status
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
The Golden Ridge Project covers a total area of 167km2 under
a single exploration licence, EL17/2018, owned and controlled
by Flynn Gold through its 100% owned subsidiary, Kingfisher
Exploration Pty Ltd.
The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Flynn Gold is unaware of any impediments for exploration on
the granted licence and does not anticipate any impediments
to exploration for the area under application.
Acknowledgment and appraisal of
exploration by other parties.
Relevant exploration done by other parties are outlined in
References listed in this release.
Exploration
done by
other parties
All historical exploration records are publicly available via the
Tasmanian Government websites including Land Information
System Tasmania (thelist.tas.gov.au).
Previous exploration has been completed on Flynn Gold’s
projects by a variety of companies. Please refer to the FG1
Prospectus dated 30th March 2021 for details and references
relating to previous work.
Significant exploration and drilling has been completed by a
variety of companies, including Billiton Australia, Tamar Gold
and MPI Pty Ltd with technical studies completed by Shaw
Excavations. Please refer to the FG1 Prospectus dated 30th
March 2021 for details and references therein relating to
previous work.
All historical exploration records are publicly available via the
Tasmanian Government websites including Land Information
System Tasmania (thelist.tas.gov.au).
All work conducted by previous operators at the Golden Ridge
project is considered to be of a reasonably high quality, and
done to industry standards of the day, with information
incorporated into annual statutory reports.
Previous operators have conducted very little exploration
work outside of the historical small scale mine working areas
at the Golden Ridge project.
Geology
Deposit type, geological setting and style of
mineralisation.
The Golden Ridge project is host to intrusion related gold
system (IRGS) style mineralisation consisting of gold bearing
quartz-carbonate-sulphide stockwork veining hosted in
hornfelsed pelitic and quartzose sedimentary rocks within the
Paleozoic Mathinna Group, northeast Tasm
Share your feedback
Discover