September 2023 Quarterly Activities Report and Appendix 5B
Released
Released
Announcement PDF
ASX Announcement
20 April 2023
ASX: FG1
Quartz vein with coarse arsenopyrite in Golden Ridge Project drill hole TFDD013 at 26.0m (0.5m @ 169.8g/t Au)
Quarterly Activities Report
30 September 2023
Highlights
Exploration - Golden Ridge Project, NE Tasmania
•
Phase 2 diamond drilling at Trafalgar Prospect completed with 8 holes advanced for
1,987.35m
•
Drilling highlights reported since the June Quarterly Report include bonanza gold
intercepts in:
o
TFDD013:
4.0m @ 23.7g/t Au from 23.0m including 0.5m @ 169.8g/t Au from 25.9m;
o
TFDD0015:
1.1m @ 51.3g/t Au from 353.2m, including 0.4m @ 137.8g/t Au from 353.9m;
•
Broad zones of low to moderate grade gold mineralisation associated with a zone of
stockwork and sheeted fracture-controlled veining also intersected
•
Trafalgar Prospect gold system expanded beyond 400m east-west strike length, from
surface to a depth of 420m and remains open in all directions
Exploration - Warrentinna Project, NE Tasmania
•
2-hole diamond drilling program commenced at the Warrentinna Project, testing highly
prospective orogenic-style gold mineralisation which is defined by historical mine-workings
over a largely untested 6km-long corridor with potential for near-surface gold
resources
Exploration - Henty Zinc Project, Western Tasmania
•
Permitting activities progressed to enable drilling of shallow Zn-Pb-Ag targets identified, at
advanced-stage resource definition ready prospects of Mariposa and Grieves Siding:
o
Mariposa Prospect has near-surface mineralisation previously drilled over 800m of
strike length with intercepts up to 17.9m @ 17.6% Zn+Pb and 101g/t Au
o
Grieves Siding Prospect has near-surface mineralisation drilled over 800m of strike length
with intercepts up to 13.15m @ 11.6% Zn+Pb
Exploration - Mt Dove Project, Western Australia
•
Infill soil sampling program completed at the Mt Dove Lithium-Gold Project located near the
Wodgina and Pilgangoora Lithium mines and Hemi gold deposit, with assays pending
Exploration - Forrestania / Lake Johnston Lithium Projects, WA
•
Six new exploration licences granted near Mt Holland lithium mine and the Mt Day
pegmatite field
•
Previously unmapped pegmatites identified on new exploration licence at Lake Johnston
Corporate
•
The Company’s cash position as at 30 September was $2.527 million
•
Annual General Meeting to be held at 10.00am (AEDT) on Thursday 30 November 2023.
Page 2 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Flynn Gold Limited (ASX: FG1, “Flynn” or “the Company”) is pleased to report on its activities
for the quarter ending 30 September 2023.
Flynn Gold Limited is an Australian mineral exploration company with a portfolio of 100% owned
exploration projects in Tasmania and Western Australia (see Figure 1). The Company is actively
exploring for gold and tin-tungsten deposits in northeast Tasmania and has established a portfolio
of gold-lithium exploration assets in Western Australia. The Company also has two prospective
zinc-silver tenements on Tasmania’s mineral-rich west coast.
In addition, Flynn recently exercised its option to purchase the Warrentinna Gold Project located
in northeast Tasmania and the Firetower Gold and Battery Metals Project.
Figure 1: Location of Flynn Gold’s projects in Tasmania and Western Australia.
Page 3 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Exploration - NE Tasmania
During the September 2023 quarter, the Company focused most of its exploration activities on
the Golden Ridge Project located in Northeast Tasmania (see Figure 2).
Figure 2: Location of Flynn Gold tenements in NE Tasmania.
Page 4 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Golden Ridge Project – NE Tasmania
The Golden Ridge Project consists of multiple prospects and historical gold workings along an
eight-kilometre-long intrusive granodiorite-hornfels metasediment contact zone where the
Company is actively exploring to identify and test multiple exploration targets, with the aim of
making further discoveries.
Previous exploration at the Golden Ridge Project focused on the Brilliant prospect in 2022 and
the Trafalgar prospect more recently, with diamond drilling programs being completed at both
locations. In 2022, Flynn completed a regional scout reverse circulation (RC) drilling program at
Golden Ridge. The RC program was the first recorded drilling undertaken at the Link Zone,
Blinding and Kensington Prospects (see Figure 3).
The Trafalgar prospect is the first location where the intrusive granodiorite-hornfels contact has
been drill tested by Flynn.
Figure 3: Flynn Gold’s Golden Ridge Project, NE Tasmania, showing prospect areas.
Page 5 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Trafalgar Drilling
Phase 2 Drilling
The Phase 2 diamond drilling program at the Trafalgar prospect was completed in August 2023
with step-out diamond drill holes designed to test the extent and continuity of the gold vein system
intersected in earlier drilling. Drill holes TFDD008 (extension) and TFDD009 to TFDD015 were
completed for a total of 1,987.35m in the program.
Significant assay results from the Phase 2 drilling reported since the June 2023 quarterly report
are detailed in Table 1 1 and selectively shown in Figure 4. At the time of reporting the Company
is awaiting laboratory assays for over 420m core samples from drill holes TFDD014 and the
remaining sections of TFDD015.
Table 1: Significant Drill Intercepts - Trafalgar Prospect
Hole No
From (m)
To (m)
Interval (m)
Au (g/t)
TFDD015
67.0
167.0
167.0
168.95
191.7
191.7
204.55
205.2
353.2
353.9
23.0
25.9
107.6
222.0
256.0
262.65
12.0
111.9
111.9
185.6
185.6
255.5
255.5
260.5
56.0
56.0
127.0
182.0
216.0
68.0
69.0
117.5
117.5
68.0
207.0
169.4
169.4
193.3
192.5
207.0
205.75
354.3
354.3
27.0
26.5
108.3
284.0
259.4
263.4
14.3
114.0
113.2
235.0
186.0
271.0
261.0
261.0
57.0
56.4
128.0
183.0
217.5
70.7
70.2
119.0
118.0
1.0
40.0
2.4
0.45
1.6
0.8
2.45
0.55
1.1
0.4
4.0
0.5
0.7
62.0
3.4
0.75
2.3
2.1
1.3
48.4
0.4
15.5
5.5
0.5
1.0
0.4
1.0
1.0
1.5
2.7
1.2
1.5
0.5
5.09
1.02
2.83
11.35
5.86
13.95
5.1
20.22
51.3
137.8
23.7
169.8
14.98
0.63
4.53
10.44
1.56
8.28
11.86
0.34
8.46
0.73
1.58
5.58
3.63
8.03
1.10
1.23
1.85
3.06
5.09
2.09
5.93
including
including
including
including
including
including
Including
TFDD013
including
TFDD012
including
TFDD011
including
including
including
including
TFDD010
including
TFDD009
including
including
1 See FG1 ASX Announcements dated 14 September and 10 October 2023 for full details
Page 6 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Ag (g/t)
95.7
96.0
Figure 4: Drill hole location plan, Trafalgar Prospect. Significant intercepts reported as downhole length.
Drilling at Trafalgar now has multiple vein intersections grading >100g/t Au with at least 4 main
vein zones interpreted – T1, T2, T3 and T4 zones, all of which are open along strike and at depth.
Figure 5 below shows a plan view of the preliminary vein zone model.
TFDD013 was drilled beneath a historical mine adit which was identified by a void intersected in
drill hole TFDD011 at 10.5-11.1m depth with mineralised quartz veins adjacent to the void (2.3m
@ 1.56g/t Au from 12.0m). TFDD013, drilled at a steeper angle to TFDD011, intersected a zone
of quartz vein stockwork veining around a central 0.5m wide quartz-sulphide vein lode containing
coarse disseminated to banded pyrite-arsenopyrite-galena-pyrrhotite-chalcopyrite-sphalerite and
disseminated fine grained visible gold (see Figure 6 & Figure 7). The central vein lode assayed
over the 0.5m interval as 169.8g/t Au from 25.9m.
Page 7 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Figure 5: Preliminary vein zone model with interpolated gold grade shells, Plan View, Trafalgar Prospect, Golden Ridge
Project. Grade shells: red = >0.5g/t Au, orange = >0.3g/t Au. Significant intercepts reported as downhole length.
The TFDD013 intercept is located approximately 100m along strike to the northeast of 12.3m @
16.8g/t Au from 108.7m intersected in hole TFDD005 2 and is currently interpreted to be a
continuation of the same high-grade mineralised vein lode (T1 Vein).
TFDD015 successfully tested for strike extensions to veins zones T1 and T2 (Figure 5). The T2
vein zone high-grade interval recorded in TFDD015 occurs as a pyrite-galena-sphaleritepyrrhotite quartz-vein with visible gold within altered granite (see Figures 6 and 7). The interval
is approximately 75m down-dip of a similar high-grade interval of 5.0m @ 12.56g/t Au (including
0.4m @ 150g/t Au) from 202 metres in historic drill hole TFD001 (see Figure 5), which reported
mineralisation occurring in a similar zone of pyrite-galena-sphalerite-pyrrhotite veining with
visible gold. The high-grade interval in TFDD015 is significant as it further demonstrates the
potential for high-grade gold mineralisation to continue both at depth as well as along strike.
Final results for hole TFDD012 include high-grade intercepts associated with zones of discrete
mineralised veins (e.g. 0.7m @ 14.98g/t Au from 107.6m), as well as broad zones of low to
moderate grade gold mineralisation (62.0m @ 0.63g/t Au from 222.0m) associated with a zone
of stockwork and sheeted fracture-controlled veining in hornfelsed and silicified metasediments
(T4 vein zone), which is considered to be an extension of similar veining intersected in hole
TFDD008 3 approximately 50m to the east.
2 See FG1 ASX Announcements dated 12 December 2022 for full details
3 See FG1 ASX Announcements dated 18 July 2023 for full details
Page 8 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Figure 6: TFDD015 drill core from 354m depth showing mineralised pyrite-galena-sphalerite-pyrrhotite quartz
sulphide vein with visible gold (circled in blue).
Figure 7: TFDD015 drill core from 354m depth showing mineralised pyrite-galena-sphalerite-pyrrhotite quartz
sulphide vein with visible gold (circled in blue).
Final results for hole TFDD011 also include zones of low to moderate grade gold mineralisation
(15.5m @ 0.73g/t Au from 255.5m, and 48.4m @ 0.34g/t Au from 185.6m) associated with
stockwork and sheeted fracture-controlled veining as seen in holes TFD012 and TFDD008.
Assays results received to date continue to extend the Trafalgar gold mineralisation system,
which now extends over a drilled strike length of at least 400m and to depths of up to 420m from
surface. Mineralisation currently remains open in all directions.
The Company is currently finalising geological and structural studies aimed towards advancing
its understanding of the controls to mineralisation and a new geological framework interpretation
for Trafalgar and the wider Golden Ridge project area.
Page 9 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Other Golden Ridge Drilling
The Company has completed preliminary planning for a wide step-out drill program to test
continuity of mineralisation between the Brilliant and Trafalgar Prospects through the Link Zone
area – a strike length of approximately 2.5km (See Figure 3). An initial 4 diamond drill holes
across the Link Zone have been approved by Mineral Resources Tasmania (MRT).
Planning for follow-up drilling at the Trafalgar Prospect is on-going with a number of drill pad
locations already permitted. Additional drill pad locations will be identified once all drilling
information has been received and interpreted.
Other Tasmanian Exploration Activity
Warrentinna Project
The Warrentinna Project (EL30/2004) is located in north-east Tasmania, 40km northwest of
Flynn’s Golden Ridge Project (see Figure 2). The tenement was recently acquired from Greatland
Gold plc (LSE: GGP, “Greatland”) 4. The project encompasses two historic goldfields, Forester
and Warrentinna (see Figure 8). High-grade gold deposits were mined at both fields in the late
1800s and early 1900s. The Warrentinna goldfield is defined by numerous historic workings and
largely untested prospects over a strike length of 6km.
Figure 8: – Warrentinna Project Geology and Gold Prospects
4 See FG1 ASX Announcements dated 5 June 2023 for full details
Page 10 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
In late September 2023 diamond drilling commenced at the Warrentinna Project testing a highgrade, near-surface gold target zone identified by historical drill results.
Initial drilling is planned to comprise 2 diamond drill holes totalling 300m. The planned holes will
test the continuity and extension of orogenic style gold mineralisation identified in historical
drilling by Greatland. The holes are also designed to provide stratigraphic and structural
information critical to advancing our understanding of the project.
Previous RC and diamond drilling campaigns at Warrentinna by Greatland intersected zones of
high-grade gold within broader intervals of moderate significant gold mineralisation 5.
All historical holes drilled by Greatland were orientated dipping steeply towards the east, apart
from 1 RC hole which was drilled towards the north.
Flynn’s planned drill holes are being drilled in the opposite direction, dipping moderately to the
west, with the aim of traversing multiple auriferous quartz vein zones indicated by the previous
drilling, and to provide structural information that was not obtained from the previous drilling (see
Figure 9).
Figure 9: Cross-section showing historical drill results and Flynn Gold drill hole DNDD001
5 See FG1 ASX Announcements dated 27 September 2023 for full details
Page 11 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Henty Zinc Project
The Henty Zinc-Lead-Silver project comprises a district-scale stratiform carbonate-hosted base
metal system hosting 5 mineralised stratigraphic horizons identified over +50 km of combined
strike length. Mineralisation is identified from surface to known depths of +500m (open) 6.
Located within 5 km of the historical mining town of Zeehan, the project has excellent access to
road, rail, power and port infrastructure.
Proposed drilling programs at Mariposa and Grieves Siding are currently being permitted with a
view to enabling drilling to commence in late 2023 / early 2024.
Figure 10: Henty Zinc Project Location and Prospects Plan.
6 See FG1 ASX Announcements dated 14 August 2023 for full details
Page 12 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
WA Gold-Lithium Projects
The Company has 5 gold-lithium projects in Western Australia, strategically located in districts
that host large gold and lithium deposits or in districts that the Company considers relatively
under-explored for lithium.
Mt Dove Project
The Mt Dove Project, 100% owned by Flynn Gold, is located approximately 25km north-northwest
of the Wodgina Lithium Mine, 34km west-northwest of the Pilgangoora Lithium Mine and 12km
southeast of the Hemi gold deposit, in the Pilbara region of Western Australia (see Figure 11).
Figure 11: Mt Dove Project location plan. WA inset map needs updating with Lake Johnson Project
During the quarter, an infill soil sampling was completed at the Mt Dove Project, with the aim of
providing better definition of geochemical anomalies delineated during the 2022 UFF soil
sampling program. At the date of this report the soil sampling laboratory assays remain pending.
The UFF sampling technique was first trialled in 2022 at Mt Dove for its ability to “see through”
shallow cover such as seen on E45/5055. The infill soil sampling program comprises
approximately 500 soil sampling sites (see Figure 12) designed to infill the original sample
spacing at selected lithium and gold anomalies to 200m by 200m or 400m by 200m (from the
original 400m by 400m spacing).
Page 13 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
The 2022 UFF soil program delineated a number of lithium anomalies and associated pathfinder
elements and zonation trends 7 (see Figure 12). These trends show a general zonation from the
southwest to the northeast with increasing niobium, beryllium, caesium, rubidium and tin towards
the east-northeast margin of the survey. The majority of the sampling was wide spaced, and the
infill sampling program is designed to increase confidence in the continuity of anomalies and
geochemical trends.
One of the high priority anomalies is located in the northern margin of E45/5055 and contains
four samples with lithium assay results greater than 100ppm Li with supporting tin, caesium and
rubidium anomalism.
The gold results from the 2022 UFF soil sampling program also outlined a number of low-level
discrete gold anomalies which appear to be associated with regional structures or discrete
intrusive bodies.
The low-level gold anomalies in the western half of E45/5055 appear to wrap around the margins
of what is interpreted as a distinct, moderately magnetic, intrusive body. (see Figure 11). The
Hemi gold deposit, which is located 12km to the northwest, is reported to be an intrusion related
style of gold system rather than the more typical orogenic shear-hosted style deposits of the
Pilbara and Goldfields regions in Western Australia.
Flynn’s future work programs for the Mt Dove Project may include further geophysical programs
and design of a follow-up drilling program to test any soil anomalies identified.
Figure 12: In-fill soil sampling program on E45/5055 at Mt Dove Project
7 See FG1 ASX Announcements dated 21 August 2023 for full details
Page 14 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Forrestania / Lake Johnston Lithium Projects
The Forrestania and Lake Johnston projects are located in the highly prospective Southern Cross
Province containing the Mt Holland lithium mine, the Mt Day pegmatite field and multiple active
exploration targets including the Gemcutter, Giant and Medcalf pegmatites.
During the quarter, six exploration licences located in the Forrestania and Lake Johnston projects
were granted, covering an area of 320km2, by the Western Australian Department of Mines,
Industry Regulation and Safety (see Figure 13). The grant of these tenements marks the
commencement of on-ground exploration for lithium at the projects.
Figure 13: Flynn Gold Limited’s Forrestania and Lake Johnston project location plan.
Flynn completed an initial reconnaissance field trip to the projects with the aim of increasing
understanding of the regional geology, potential targets, and the extent of nearby exploration
activity 8. Flynn has also re-processed the available open file geophysical datasets, identifying a
number of concealed exploration targets, based on interpretation of regional structures and
remnant greenstone keels, below shallow cover.
These combined activities have identified a number of targets for initial soil sampling and
geological mapping programs (see Figure 14).
8 See FG1 ASX Announcements dated 4 August 2023 for full details
Page 15 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Figure 14: Flynn Gold Limited’s tenements, lithium occurrences and proposed soil sampling programs over combined
aeromagnetic and gravity image.
Three new pegmatites were located on E63/2190 (see Figure 14), within a region characterised
by moderate areas of amphibolite outcrop and large areas of residual soil, colluvium and
sheetwash alluvial cover.
Five rock chip samples were collected from subdued, weathered outcrop of these pegmatites.
These samples returned assay results with elevated background levels of rubidium (188 to
396ppm Rb), bismuth (0.4 to 34.2ppm Bi) and tantalum (0.8 to 8.7ppm Ta). The identification of
these three pegmatites with strong pathfinder element support from a brief reconnaissance field
trip, highlights the exploration potential of these projects.
Flynn’s future work programs for the Forrestania and Lake Johnston projects include further
geological mapping and rock chip sampling in areas of outcrop, and systematic soil sampling in
areas of shallow cover. Further interpretation of multi-client aeromagnetic and gravity data will
be undertaken to assist with interpretation of the geology and the identification of additional target
zones. A detailed gravity survey may also be considered to assist with targeting and the
interpretation.
Initial air core drilling programs will be considered pending results of the early-stage assessment
programs.
Page 16 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Corporate
Annual General Meeting
Flynn Gold’s Annual General Meeting will be held at 10.00am (AEDT) on Thursday 30 November
2023.
Cash Position
The Company’s cash position as at 30 September 2023 was $2.527 million.
Summary of expenditure
The Company’s major cashflow movements for the quarter included:
•
•
•
Exploration & Evaluation expenditure - $1,011k;
Employee costs - $131k; and
Administration and corporate costs - $97k.
Payments to related parties of the entity and their associates
In the September quarterly Appendix 5B, the figure of $86k as disclosed in section 6.1 and 6.2
relates to salaries and fees (including superannuation) paid to directors and their associates
during the quarter.
Approved by the Board of Flynn Gold Limited.
25 October 2023
For more information:
Neil Marston
Managing Director & CEO
+61 3 9692 7222
info@flynngold.com.au
Ben Creagh
Media & Investor Relations
+61 (0) 417 464 233
benc@nwrcommunicaitons.com.au
Page 17 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
Interests in Mining Tenements
The Company holds a granted beneficial interest in the following tenements as at 30th September
2023:
Location
Beneficial
Percentage
held
Licence
Description
Interest acquired/farmin or disposed/farm-out
during the quarter
EL11/2012
NE Tasmania
100%
Portland
-
EL18/2018
NE Tasmania
100%
Telegraph
-
EL18/2016
NE Tasmania
100%
Cameron
-
EL17/2018
NE Tasmania
100%
Golden Ridge
-
EL16/2021
NE Tasmania
100%
Bendover Hill
-
EL02/2019
NE Tasmania
100%
Mangana
-
EL3/2020
NE Tasmania
100%
Lisle
-
EL4/2020
NE Tasmania
100%
Lyndhurst
-
EL30/2004
NE Tasmania
100%
Warrentinna
100% (interest acquired)
EL26/2004
NW Tasmania
100%
Firetower
100% (interest acquired)
EL6/2015
W Tasmania
100%
Henty South
-
EL3/2018
W Tasmania
100%
Henty North
-
E47/3888
Pilbara, WA
100%
Mt Dove West
-
E45/5055
Pilbara, WA
100%
Mt Dove
-
E45/6156
Pilbara, WA
100%
Mt Dove
E45/6157
Pilbara, WA
100%
Mt Dove
E45/6158
Pilbara, WA
100%
Mt Dove
E45/5730
Yarrie, WA
100%
Shay Gap
-
E45/5731
Yarrie, WA
100%
Shay Gap
-
E45/5732
Yarrie, WA
100%
Shay Gap
-
E77/2915
Forrestania, WA
100%
East Indies
100% (licence granted)
E63/2187
Lake Johnson, WA
100%
Mt Day North
100% (licence granted)
E63/2188
Lake Johnson, WA
100%
Ant Rock
100% (licence granted)
E63/2190
Lake Johnson, WA
100%
Bremer
100% (licence granted)
E63/2229
Lake Johnson, WA
100%
Forrestania
100% (licence granted)
E63/2230
Lake Johnson, WA
100%
Forrestania
100% (licence granted)
E63/2187
Lake Johnson, WA
100%
Mt Day North
100% (licence granted)
E77/2730
Koolyanobbing, WA
100%
Marda
-
E77/2734
Koolyanobbing, WA
100%
Windarling West
-
E77/2736
Koolyanobbing, WA
100%
Mt Jackson
-
E77/2737
Koolyanobbing, WA
100%
Mt Jackson East
-
E77/2738
Koolyanobbing, WA
100%
Gwendolyn
-
E77/2739
Koolyanobbing, WA
100%
-
E77/2740
Koolyanobbing, WA
100%
Rainy Rocks
Mt Jackson
Easterer
Mining
Tenement
Page 18 of 18 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
info@flynngold.com.au | www.flynngold.com.au
-
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Flynn Gold Limited
ABN
Quarter ended (“current quarter”)
82 644 122 216
30 September 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (3
months)
$A’000
-
-
(1,011)
(1,011)
(b) development
-
-
(c) production
-
-
(d) staff costs
(131)
(131)
(e) administration and corporate costs
(97)
(97)
-
-
30
30
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(1,209)
(1,209)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) exploration & evaluation
-
-
(e) investments
-
-
(18)
(18)
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (3
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(18)
(18)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (payments of Lease Liabilities)
(6)
(6)
3.10
Net cash from / (used in) financing
activities
(6)
(6)
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
3,760
3,760
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(1,209)
(1,209)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(18)
(18)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(6)
(6)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Year to date (3
months)
$A’000
-
-
2,527
2,527
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
527
460
5.2
Call deposits
2,000
3,300
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,527
3,760
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
86
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as wel
Share your feedback
Discover