Exploration – Golden Ridge Project, NE Tasmania
•
1,500m drill program (Phase 3) at the Trafalgar prospect commenced during the quarter,
comprising infill and extension drilling targeting down-dip and along-strike extensions to
previous high-grade gold intercepts, includes multiple intersections grading >100g/t Au.
•
3 drill holes (TFDD016-TFDD018) were completed for 927 metres by the end of the quarter.
•
Multiple high-grade gold veins intersected in drill hole TFDD016, including:
•
0.4m @ 10.8g/t Au from 135.2m;
•
0.5m @ 35.1g/t Au within 1.4m @ 12.7g/t Au from 164.6m (Trafalgar Main Vein);
•
0.3m @ 19.0g/t Au within 0.65m @ 10.5g/t Au from 187.55m (Magazine Vein);
•
0.3m @ 12.3g/t Au within 1.2m @ 3.5g/t Au from 233.0m;
•
0.3m @ 39.2g/t Au from 243.2m;
•
0.4m @ 67.6g/t Au within 1.3m @ 21.9g/t Au from 248.7m, and
•
0.4m @ 6.0g/t Au within 1.3m @ 2.1g/t Au from 315.1m (Trafalgar South Vein).
•
Mapping and vein sampling within historic Golden Ridge adit has identified a significant new
zone of high-grade gold mineralisation in the Link Zone prospect.
•
Underground grab sampling of mineralised veins in the Golden Ridge adit recorded high-grade
gold assays including 64.4g/t Au, 37.6g/t Au and 15.9g/t Au.
•
New high-grade gold vein zone discovered in trenching 250m north of the Trafalgar mine
where 17 out of 36 grab rock chip samples assayed over 10g/t Au, including 99.4g/t Au,
76.6g/t Au and 67.1g/t Au.
Exploration – Western Australia
•
Maiden soil sampling program at Forrestania Project outlined four high priority lithium
anomalies up to 4,200m in length and 500m width.
•
Infill and extensional soil sampling at Parker Dome Project confirmed and extended multiple,
large-scale, high priority lithium anomalies.
Corporate
•
Rights Issue successfully raised $2.5 million with strong support from existing shareholders
and new investors introduced by Mahe Capital.
•
The Company’s cash position at 30 June 2024 was $2.96 million.
For further information or to post questions go to the Flynn Gold Investor Hub at
https://investorhub.flynngold.com.au/link/GyVGje
JOIN FLYNN GOLD’S INTERACTIVE INVESTOR HUB
to receive announcements and updates and to interact with the Company by asking
questions or making comments which our team will respond to where possible
Page 2 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
Flynn Gold Limited (ASX: FG1, “Flynn” or “the Company”) is pleased to report on its activities
for the quarter ending 30 June 2024.
Flynn is an Australian mineral exploration company with a portfolio of 100% owned exploration
projects in Tasmania and Western Australia (see Figure 1).
The Company has nine 100% owned tenements in northeast Tasmania which are highly
prospective for gold as well as tin/tungsten. The Company also holds the Henty zinc-lead-silver
project on Tasmania’s mineral-rich west coast and the Firetower gold and battery metals project
located in north-western Tasmania.
Flynn has also established a portfolio of gold-lithium exploration assets in the Pilbara and Yilgarn
regions of Western Australia. In addition, Flynn holds a binding Option Agreement to acquire two
exploration licences at Parker Dome (Forrestania), Western Australia.
Figure 1 - Location Plan of Flynn Gold Projects
Page 3 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
Exploration –Tasmania
During the June 2024 quarter, the Company’s exploration activities in Tasmania were mostly
focused on the Golden Ridge Project in northeast Tasmania (see Figure 2).
Figure 2 - Location of Flynn Gold tenements in NE Tasmania.
Page 4 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
Golden Ridge Project – NE Tasmania
The Golden Ridge Project consists of multiple prospects and historical gold workings along a
nine-kilometre-long intrusive granodiorite-hornfels metasediment contact zone where the
Company is actively exploring to identify and test multiple exploration targets, with the aim of
making further discoveries (Figure 3).
Figure 3 - Flynn Gold’s Golden Ridge Project, NE Tasmania, showing prospect areas.
Trafalgar Prospect - Diamond Drilling
Phase 3 diamond drilling commenced at the Trafalgar prospect in April 2024. The planned 1,500m
diamond drill program has initially comprised infill and extension drilling targeting down-dip and
along-strike extensions to previously drilled high-grade gold intercepts. The initial holes in the
program were designed as infill and close-spaced step-outs around the previous wide-spaced
drilling (100m average drill hole spacing) and will be used to refine the current vein model and
inform targeting of further step-out strike and depth extension drilling.
Three diamond holes (TFDD016-018) for 927m were completed during the quarter.
Page 5 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
TFDD016
This 355.9m hole was designed to in-fill previous widely spaced drilling and test all 3 of the main
veins (Trafalgar Main, Magazine and Trafalgar South) and associated splays identified by Flynn’s
recent modelled interpretation of the deposit 1.
Multiple mineralised zones were intersected in the hole, including the following downhole
highlights 2:
-
0.4m @ 10.8g/t Au from 135.2m;
-
0.5m @ 35.1g/t Au within 1.4m @ 12.7g/t Au from 164.6m (Trafalgar Main Vein);
-
0.3m @ 19.0g/t Au within 0.65m @ 10.5g/t Au from 187.55m (Magazine Vein);
-
0.3m @ 12.3g/t Au within 1.2m @ 3.5g/t Au from 233.0m;
-
0.3m @ 39.2g/t Au from 243.2m;
-
0.4m @ 67.6g/t Au within 1.3m @ 21.9g/t Au from 248.7m, and
-
0.4m @ 6.0g/t Au within 1.3m @ 2.1g/t Au from 315.1m (Trafalgar South Vein) 3.
TFDD017
This 248.4m hole was designed to test the eastern extent of the 3 main veins. The hole intersected
some structures in the target zones, however a significant fault zone (180m - 220m) was
intersected that is interpreted to have offset the main mineralised veins trend in the target zone.
Assays have been received for the entire hole with the best interval being:
-
1.0m @ 2.5g/t Au within 3.0m @ 1.3g/t Au from 232.0m3.
TFDD018
This 322.7m hole was designed to in-fill widely spaced drilling and test the Trafalgar Main and
Magazine veins to the west and up dip of high-grade intercepts in TFDD016 and TFD001. Logging
and sampling of TFDD018 is complete.
Assay results received from 0-59.5m and 214-294m have been reported with the remaining
samples (59.5-214m and 294m-322.7m EOH) outstanding and yet to be reported.
Multiple zones with visible signs of mineralisation were intersected in the target areas including:
-
0.5m @ 2.9g/t Au from 231.5m (Magazine Vein);
1.1m @ 4.9g/t Au from 281.9m;
0.3m @ 16.3g/t Au within 1.0m @ 5.5g/t Au from 292.6m (Trafalgar Main Vein)3.
Figure 4 shows the significant Phase 3 drilling results reported to date.
1
See FG1 ASX Announcement dated 18 April 2024 for full details.
2
See FG1 ASX Announcements dated 28 May 2024 for full details.
3
See FG1 ASX Announcements dated 19 July 2024 for full details.
Page 6 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
Figure 4 - Plan view of vein model with reported highlights from TFDD016-TFDD018 and previously
reported significant intercepts.
Trafalgar North - Field Mapping and Trenching Program
During the quarter Flynn geologists, following up on recent gold-in-soil anomalies 4, discovered
an area of previously unmapped historical prospecting trenches, pits and adits which are believed
to have been excavated as late as the 1930’s. The main feature of the historical workings is a
240m long north-south trench which was possibly part of a historic water race that exposed the
gold bearing veins during its construction. Flynn recently re-excavated part of this historical trench
and has added new trenching nearby (Figure 5) 5.
As a result of the trenching work, 19 in-situ quartz-sulphide veins over a width of 65m were
mapped and sampled, with grab samples collected recording gold grades up to 76.6g/t Au from
in-situ outcropping veins (Figure 6).
Two historic adits were also located in the area which appear to have been excavated beneath
the gold veins exposed in the historic trench. A grab sample taken from mineralised mullock
material at one of the adit entrances returned 99.4 g/t Au, 121g/t Ag and 1.73% Pb (Figure 6).
4
See FG1 ASX Announcement dated 17 April 2024 for full details.
5 See FG1 ASX Announcement dated 19 July 2024 for full details.
Page 7 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
Figure 5 - Trafalgar Prospect – Plan with view showing the trench area (Trafalgar North) around 250m
north of the historic Trafalgar workings. A-A’ delineates Figure 7 cross-section.
In addition to the grab/rock chip samples, Flynn commenced a trench channel sampling program
during the quarter. Initial results indicate gold mineralisation occurs within discrete high-grade
quartz-sulphide veins up to 200mm wide, with some lower grade intervals indicating a wider
dispersal in quartz veinlet swarms (Figure 6). Significant mineralised channel sample intervals
include:
-
11.0m @ 2.0g/t Au including 3.3m @ 6.3g/t Au.
-
16.5m @ 1.3g/t Au including 1.5m @ 6.8g/t Au and 4.0m @ 2.4g/t Au
Gold bearing quartz-sulphide veins in the trenches are steeply dipping and strike to the northeast,
which is a similar orientation to the trend of the main veins intersected by drilling further to the
south at the Trafalgar prospect.
A diamond hole (TFDD019) is currently being drilled beneath the new discovery area targeting
depth extension of the gold-bearing vein zone at approximately 100m beneath the surface (see
Figure 7).
Page 8 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
Figure 6 - Plan view of Trench area (Trafalgar North) with sample points and channels
Figure 7 - Cross-section of TFDD019 with Trafalgar vein model.
Page 9 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
Link Zone Prospect
The Link Zone prospect is located along the prospective granodiorite-metasediment contact zone
between Flynn’s Trafalgar and Brilliant prospects. Previous exploration at the Link Zone has
included mapping, soil and rock chip sampling and, in 2022, a 5-hole scout RC drilling campaign
targeting gold-in-soil anomalies at the top of the ridge, with the best results from this program
being recorded in LZRC001 and LZRC004 (see Figure 8).
Figure 8 - Golden Ridge Project – Regional Geology over LIDAR,
showing significant rock-chip and drillhole locations
Page 10 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
Link Zone - Field Mapping and Sampling Program
During the quarter further mapping and sampling over the Link Zone prospect was completed
with a focus at the re-discovered historical Golden Ridge adit area 6. The historical workings (circa
1895) comprise a 150m long adit and numerous prospecting trenches at the top of the ridge (see
Figure 9). The adit intersects mineralised veins some 50m vertically below the prospecting
trenches (see Figure 10) and structural evidence suggests the gold-rich veins sampled in the adit
are consistent with those mapped and sampled in the trenches above.
Trench grab sample assays returned grades up to 7.97g/t Au, and adit grab samples returned
grades up to 64.4g/t Au, indicating high-grade gold over a 50m vertical interval from surface and
open to depth.
Figure 9 - Golden Ridge Adit – Plan view with highlighted rock chip results and
LZRC001 which was drilled 120m northeast of the adit.
Mapped mineralisation in the adit is defined by a 20-30m wide structurally-controlled zone
comprising multiple sub-parallel, steeply-dipping quartz-sulphide veins between 90 and 400mm
wide striking north-northeast. Veins contain arsenopyrite, pyrite with minor chalcopyrite and
galena. Mapping of the adit walls indicates the vein system is hosted in open-folded, thinly
bedded, silicified and hornfelsed sediments that steepen to sub-vertical, tightly-folded beds as
the mineralised vein system is approached (see Figure 10).
RC drillhole LZRC001 was drilled 120m along strike of the mineralised trenches and intersected
multiple intervals up to 4.91g/t Au within an interpreted mineralised zone of approximately 20m
horizontal width. It is currently interpreted that the gold intercepts in LZRC001 represent possible
mineralised vein sets parallel to the Golden Ridge adit veins.
6 See FG1 ASX Announcement dated 21 May 2024 for full details.
Page 11 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
Figure 10 - Golden Ridge Adit Cross Section showing drillhole LZRC001 projected 120m onto section
The mapping, rock sampling and previous RC drill results indicate high-grade mineralisation is
structurally continuous at the Link Zone prospect over a strike length of at least 120m and depth
of 50m and is open in all directions.
Approximately 850m further east of LZRC001, drill hole LZRC004 recorded a similar broad zone
of gold mineralisation recording 33m @ 0.5g/t Au (see Figure 8). This intersection provides further
encouragement in support of the trench and adit results of the potential scale of the Golden Ridge
mineralisation system linking the Brilliant and Trafalgar prospects. LZRC004 is located
approximately 1km southwest from the Trafalgar prospect.
WA Gold-Lithium Projects
Flynn Gold has 5 gold-lithium projects in Western Australia, strategically located in districts that
host large gold and lithium deposits or in districts that the Company considers relatively underexplored for lithium.
During the quarter, Flynn completed auger soil sampling programs at its Forrestania and Parker
Dome lithium-gold projects 7. The auger soil sampling at the Forrestania Project was designed to
delineate new lithium-caesium-tantalum (LCT) anomalies and at the Parker Dome Project to infill
and extend lithium soil anomalies previously outlined 8.
7
See FG1 ASX Announcement dated 27 June 2024 for full details
8
See FG1 ASX Announcement dated 6 March 2024 for full details
Page 12 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
Figure 11 - Location of Flynn’s Forrestania and Parker Dome projects
Forrestania Lithium Project
The Forrestania Project is located in the highly prospective Southern Cross Province in Western
Australia which contains the world class Mt Holland Lithium Mine, the Rio lithium deposit and
multiple active exploration targets including the Gemcutter and Giant pegmatites (Figure 11).
The program was completed on Exploration Licence E77/2915, which is located 15km southsoutheast of the Mount Holland and 60km south-southeast of the Rio lithium deposit 9.
9
See ZNC ASX Announcement dated 28 September 2023 for full details
Page 13 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
Forrestania Project - Soil Sampling Program
Results from the maiden auger soil geochemistry program at the Forrestania Project have
outlined four new, large-scale, high priority lithium anomalies, all with associated elevated
pathfinder anomalism (Figure 12). The first-pass, wide spaced, soil sampling program was
designed to target the eastern margin of the Forrestania Greenstone Belt and major structures
within interpreted remnant greenstone keels and roof pendants above and within fertile granitoid
intrusions (Figure 12). The anomalies occur in areas dominated by aeolian, alluvial and
sheetwash sand plain cover.
Figure 12 - Auger soil lithium (Li2O) results (ppm) over geological interpretation, showing targets, trends
and Li2O contours. High priority Li anomaly targets are indicated by number 1 – 4.
Page 14 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
The targets also overlie distinct magnetic lows interpreted to be associated with major structures
and remnant greenstone keels (Figure 13).
The first-pass auger soil survey was completed on a wide spacing which varied between 400m x
200m and 800m x 200m, with a total of 468 soil samples collected. Samples were sieved to -2mm
in the field and then screened at -80 mesh (180µm) at SGS Australia Pty Ltd and assayed, for
lithium and associated pathfinder elements by four-acid digest with an ICP-MS finish and gold by
30g fire assay. These lithium anomalies require further follow-up evaluation and infill soil
sampling.
Figure 13 - Auger soil lithium (Li2O) results (ppm) over magnetic image showing targets and Li2O
contours
Page 15 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
Parker Dome Lithium Project
The Parker Dome Project is also located in the highly prospective Southern Cross Province in
Western Australia The program was completed on Exploration Licence E77/1965 and E77/2091,
which are located 20km northeast of the Rio lithium deposit (Figure 11).
Parker Dome Project - Soil Sampling Program
Results from infill and extensional auger soil sampling at the Parker Dome Project have confirmed
the six large-scale, high priority lithium anomalies 10 previously outlined, all with associated
elevated pathfinder anomalism (Figure 14). The program has provided a better definition of the
strike and extent of these anomalies. The results have extended several of the anomalies and
identified three new targets along one new exploration auger line, located to the southeast of
anomaly six, which requires additional follow-up auger soil sampling (Target 6a, Figure 14).
Figure 14 – Auger soil lithium (Li2O) results (ppm) over aerial photograph showing targets, pegmatite
trends and Li2O contours. High-priority Li anomaly targets are referenced by target numbers 1 – 6a.
The Western and Eastern pegmatite trends (Figure 14) were outlined by historic, shallow RAB
drilling which intercepted multiple pegmatite intersections logged over a wide area 11, with most
holes ending in pegmatite up to 12m thick. The historic drill holes containing pegmatite intervals
were not assayed for lithium. The soil anomalies occur within the Western and Eastern pegmatite
trends and contain, or are proximal to, historic drill holes with logged pegmatite intervals.
10
See FG1 ASX Announcement dated 6 March 2024 for full details.
11
See FG1 ASX announcement dated 1st December 2023 for full details.
Page 16 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
The auger soil survey was completed on a spacing which varied between 100m x 100m, 200m x
100m and 400m x 100m, with a total of 314 soil samples collected in the latest program. Samples
were sieved to -2mm and assayed at SGS Australia Pty Ltd, for lithium and associated pathfinder
elements by four-acid digest with an ICP-MS finish and gold by 30g fire assay.
These targets present as either drill ready, high order drill targets, or requiring further follow-up
infill soil sampling.
Figure 15 – Auger soil lithium (Li2O) results over magnetic image showing targets and Li2O contours
Corporate
$2.5M Rights Issue Closes with Significant Excess Demand
On 30 April 2024, Flynn closed a renounceable rights issue with significant excess demand,
raising the full amount of $2,462,114 (before costs). The total raised includes $1,211,907 received
by way of acceptances from shareholders and $1,250,207 received from the shortfall shares
placed to existing shareholders and by the lead manager and Underwriter, Mahe Capital Pty Ltd.
FG1 issued 82,070,455 new fully paid ordinary shares (Shares) and 41,035,227 new options
exercisable at $0.075 and expiring on 7 November 2026 (Options) under the rights issue.
The Board also exercised its discretion to accept a portion of the excess demand to the value of
$250,000. Accordingly, the Company issued an additional 8,333,333 Shares and 4,166,694
Options, on the same terms as the securities issued under the rights issue.
The Options are listed on ASX under the code FG1O.
Page 17 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
Company Presentation – RIU Sydney Resources Round-Up
In May, Flynn Gold Managing Director and Chief Executive Officer Neil Marston presented at
the RIU Sydney Resources Round-up.
The presentation can be viewed at the following link:
https://investorhub.flynngold.com.au/announcements/6325765
Company Presentation – AMEC Austex Brisbane Resources Lunch
In June, Flynn Gold Managing Director and Chief Executive Officer Neil Marston presented at
the AMEC Austex Brisbane Resources Lunch.
The presentation can be viewed at the following link:
https://investorhub.flynngold.com.au/announcements/6400988
Cash Position
The Company’s cash position at 30 June 2024 was $2.96 million.
Summary of expenditure
The Company’s major cashflow movements for the quarter included:
•
•
•
Exploration & Evaluation expenditure - $602k;
Employee costs - $134k; and
Administration and corporate costs - $225k.
Payments to related parties of the entity and their associates
In the June quarterly Appendix 5B, the figure of $114k as disclosed in section 6.1 and 6.2 relates
to salaries and fees (including superannuation) paid to directors and their associates during the
quarter.
Approved by the Board of Flynn Gold Limited.
31 July 2024
For more information:
Neil Marston
Chief Executive Officer
+61 3 9692 7222
info@flynngold.com.au
Ben Creagh
Media & Investor Relations
+61 (0) 417 464 233
benc@nwrcommunicaitons.com.au
Page 18 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
Interests in Mining Tenements
The Company holds a granted beneficial interest in the following tenements as at 30th June 2024:
Licence
Description
Interest
acquired/farm-in or
disposed/farm-out
during the quarter
Mining
Tenement
Location
Beneficial
Percentage
held
EL11/2012
NE Tasmania
100%
Portland
-
EL18/2018
NE Tasmania
100%
Telegraph
-
EL18/2016
NE Tasmania
100%
Cameron
Partial Surrender
EL17/2018
NE Tasmania
100%
Golden Ridge
-
EL16/2021
NE Tasmania
100%
Bendover Hill
-
EL02/2019
NE Tasmania
100%
Mangana
-
EL3/2020
NE Tasmania
100%
Lisle
-
EL4/2020
NE Tasmania
100%
Lyndhurst
-
EL30/2004
NE Tasmania
100%
Warrentinna
-
EL26/2004
NW Tasmania
100%
Firetower
-
EL6/2015
W Tasmania
100%
Henty South
-
EL3/2018
W Tasmania
100%
Henty North
-
E45/5055
Pilbara, WA
100%
Mt Dove
-
E45/6156
Pilbara, WA
100%
Mt Dove
-
E45/6157
Pilbara, WA
100%
Mt Dove
-
E45/6158
Pilbara, WA
100%
Mt Dove
-
E45/5730
Yarrie, WA
100%
Shay Gap
-
E45/5731
Yarrie, WA
100%
Shay Gap
-
E45/5732
Yarrie, WA
100%
Shay Gap
E77/1965
Parker Dome, WA
0%
Parker Dome
E77/2091
Parker Dome, WA
0%
Parker Dome
E77/2739
Koolyanobbing, WA
100%
Rainy Rocks
Under Option to
Purchase
Under Option to
Purchase
-
E77/2915
Forrestania, WA
100%
East Indies
-
E63/2187
Lake Johnston, WA
100%
Mt Day North
-
E63/2188
Lake Johnston, WA
100%
Ant Rock
-
E63/2190
Lake Johnston, WA
100%
Bremer
-
E63/2229
Lake Johnston, WA
100%
Forrestania
-
E63/2230
Lake Johnston, WA
100%
Forrestania
-
References
ASX Announcement 17 April 2024 - Multiple New Gold Target Areas Identified at Golden Ridge
ASX Announcement 18 April 2024 - Drilling Underway at Trafalgar High-Grade Gold Prospect
ASX Announcement 6 May 2024
- $2.5M Rights Issue Closes with Significant Excess Demand
ASX Announcement 21 May 2024 - 64g/t Au in High-Grade Veins at Golden Ridge Adit, NE Tas
ASX Announcement 28 May 2024 - Up to 67g/t Au Intersected in Drilling at Trafalgar, NE Tas
ASX Announcement 27 June 2024 - New large-scale Lithium soil anomalies at Forrestania, WA
ASX Announcement 19 July 2024
- New High-Grade Gold Discovery at Golden Ridge, NE Tas
Page 19 of 19 | ABN 82 644 122 216 | ASX: FG1
Level 4, 96-100 Albert Road, South Melbourne, Victoria, 3205
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Flynn Gold Limited
ABN
Quarter ended (“current quarter”)
82 644 122 216
30 June 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (12
months)
$A’000
-
-
(602)
(3,497)
(b) development
-
-
(c) production
-
-
(d) staff costs
(134)
(651)
(e) administration and corporate costs
(225)
(621)
-
-
13
76
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(948)
(4,693)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(3)
(5)
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
(16)
(c) property, plant and equipment
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (12
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(3)
(21)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
2,712
4,378
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(323)
(424)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (payments of Lease Liabilities)
(5)
(42)
3.10
Net cash from / (used in) financing
activities
2,384
3,912
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,525
3,760
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(948)
(4,693)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(3)
(21)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
2,384
3,912
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Year to date (12
months)
$A’000
-
-
2,958
2,958
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
308
275
5.2
Call deposits
2,650
1,250
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,958
1,525
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
114
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
-
N/A
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(948)
8.4
Cash and cash equivalents at quarter end (item 4.6