Highlights
Exploration and Development – Tasmanian Projects
• Golden Ridge Project – Non-binding Ore Purchase Agreement executed with Henty Gold
Pty Ltd, a subsidiary of Kaiser Reef Limited (ASX: KAU), establishing a framework to assess
the processing of gold-bearing ore or concentrates from Flynn’s future operations at the
operating Henty Gold Mine.
o 3.7-tonne bulk sample from Golden Ridge delivered to the Henty Gold Mine for processing
testwork – results pending.
• Trenching at Brilliant defined near-surface gold mineralisation over more than 110m of strike,
with the mineralisation remaining open to the north-east.
• Sighter metallurgical tests achieved 94% average gold extraction from 35 low to medium-
grade samples (0.1g/t - 4.5g/t Au) from the Trafalgar Prospect, supporting further evaluation
of potential processing options.
• 21-hole, ~2,500m in-fill and extensional drilling program commenced at the Brilliant Prospect
to support Mineral Resource studies - results pending.
• Firetower Gold-Tungsten Project – High-grade gold and tungsten mineralisation
intersected in latest drilling confirms significant depth and strike extensions.
• Assays from hole 2019FTD003E include:
o 12.95m @ 2.24g/t Au, 0.46% WO3, 0.18% Cu, 0.23% Co, 7.22g/t Ag from 156.9m, incl.
1.20m @ 3.95g/t Au, 0.93% WO3, 0.20% Cu, 0.24% Co, 9.60g/t Ag from 157.30m; and
2.58m @ 4.56g/t Au, 0.92% WO3, 0.22% Cu, 0.32% Co, 8.31g/t Ag from 167.27m.,
including
0.73m @ 11.95g/t Au, 2.29% WO3, 0.46% Cu, 0.64% Co and 20.3g/t Ag from
167.27m
• Revised Firetower geological model interprets two structural trends hosting broad zones of
gold and polymetallic mineralisation, with emerging NW-plunging high-grade shoots
remaining open at depth and along strike.
• Metallurgical testwork is the next step ahead of maiden Mineral Resource Estimate (MRE).
• Project-wide geophysical reinterpretation commenced across a 6km anomalous corridor –
results expected in Q4 2026.
Corporate
• One-for-three Renounceable Rights Issue completed, raising $1.5 million, with funds to be
used to progress resource drilling and development activities at Golden Ridge and finalise a
maiden Mineral Resource Estimate for Firetower.
• The Company’s cash position at 30 September 2026 was $0.41 million.
Page 3 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
Flynn Gold Limited (ASX: FG1, “Flynn” or “the Company”) is pleased to report on exploration and
development activities across its portfolio of gold, silver and critical minerals projects in Tasmania
during the September 2026 Quarter.
At the flagship Golden Ridge Project, where Flynn has identified a substantial intrusion-related
gold system, the Company has secured a non-binding Ore Purchase Agreement with the
operating Henty Gold Mine, providing a potential low-cost avenue to establish near-term gold
production. An initial bulk sample from Golden Ridge has been sent to Henty for initial processing
test work.
On the exploration front, a major new drilling campaign commenced at the Brilliant prospect to
support a maiden Mineral Resource Estimate (MRE).
At the Firetower Project in northern Tasmania, drilling results continue to extend the high-grade
gold-tungsten mineralisation at depth and along strike, with a revised interpretation providing an
improved geological model ahead of a Mineral Resource Estimate (MRE).
Exploration –Tasmania
During the Quarter, the Company’s exploration activities were focused on the Golden Ridge
Project in north-east Tasmania and the Firetower Project in northern Tasmania. (Figure 1).
Figure 1 – Location of Flynn Gold tenements in Tasmania.
Page 4 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
Golden Ridge Project
The Golden Ridge Project consists of multiple prospects and historical gold workings along a
nine-kilometre-long intrusion granodiorite-hornfels metasediment contact zone (Figure 2) where
Flynn is actively exploring to identify and test multiple targets, with the aim of making further
discoveries.
Flynn Gold has also made significant recent progress towards establishing a viable
commercialisation pathway for the Golden Ridge Project and other deposits in the region through
an Ore Purchase Agreement signed with Henty Gold Mine.
Figure 2 – Flynn Gold’s Golden Ridge Project, NE Tasmania, showing prospect areas.
Page 5 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
Ore Purchase Agreement
During the Quarter, Flynn Gold executed a non-binding Ore Purchase Agreement (“OPA”) with
Henty Gold Pty Ltd, a wholly-owned subsidiary of Kaiser Reef Limited (ASX: KAU), operator of
the Henty Gold Mine in western Tasmania.
The OPA applies to Flynn Gold’s projects in Tasmania and establishes the framework and
indicative commercial terms under which Henty Gold Mine may buy ore or concentrates supplied
by Flynn Gold for processing through its existing gold processing facility. The commercial terms
of the OPA are confidential but are considered by the Company to be potentially attractive for
both parties.
The Agreement is non-binding. It does not oblige either party to enter into any definitive
transaction, and there can be no assurance that any binding agreement will be reached or that
any transaction will proceed. Nonetheless, the parties have separately executed a Confidentiality
Agreement which allows for the sharing of information and demonstrates a degree of future
collaboration, as appropriate.
The agreement provides Flynn Gold with the opportunity to evaluate a potential low-capex
production pathway capable of accelerating development across its Tasmanian gold portfolio,
initially focused on its flagship Golden Ridge Project.
Subsequent to the end of the Quarter, a 3.7-tonne bulk sample from Golden Ridge was delivered
to the Henty Gold Mine for processing testwork, with results pending as at the date of this report.
Brilliant – Trenching & Drilling Programs
During the Quarter, the Company completed the first part of a trenching and channel sampling
program targeting the north-eastern extension to the Brilliant gold mineralisation.
Results from the first trenches have confirmed a broad footprint of anomalous gold extending
north-east along strike of previous drilling over a strike length of more than 110 metres (Figure
3).
These results define a near-surface mineralisation footprint that underpins priority targeting for
Resource definition drilling. Significant channel sample intervals include:
• Trench BTR01A: 20m @ 0.60g/t Au, including 9m @ 0.84g/t Au
• Trench BTR01B: 28m @ 0.34g/t Au, including 10m @ 0.53g/t Au
• Trench BTR02: 33m @ 0.56g/t Au, including 11m @ 1.04g/t Au
• Trench BTR04: 32m @ 0.37g/t Au, including 10m @ 0.77g/t Au
Where previous drilling information exists below the southern-most trenches (BTR01A and
BTR02B), results indicate that gold mineralisation can extend to significant depth below the
surficial anomalous zones in trenches (Figure 4).
Extensions of the anomalous gold in trenching to the north-east provides a strong vector for
extensional and in-fill drill testing where existing drilling coverage is limited. Significantly, the
anomalous gold results in previous drilling and new trenches defines a trend of gold mineralisation
consistent with the trend towards the Trafalgar prospect, located 2.5km along strike to the
northeast.
Page 6 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
Figure 3 – Brilliant Prospect – Recent Trenching Results and Drilling Plan.
Following completion of the trenching, the Company commenced an initial 21-hole drilling
program totalling approximately 2,500m at Brilliant. The program is designed as a combination of
in-fill and extensional drilling with the following key objectives:
• Systematically test and better define the near-surface gold mineralisation confirmed by
recent trenching;
• Step-out strike and depth extension drilling;
• Generate geological and geotechnical information required to support Mineral Resource
estimation studies; and
• Assess the potential for mining gold mineralisation in the context of the low-capex
production pathway being evaluated under the Ore Purchase Agreement with Henty Gold
Mine.
Brilliant is the first of the Golden Ridge Exploration Target prospects to be advanced toward a
maiden Mineral Resource Estimate.
Historical drilling at Brilliant has identified a significant gold occurrence associated with sheeted
and stockwork quartz-carbonate-sulphide veins in hornfelsed Mathinna Bed sediments over a
200m strike length, up to 40m wide and extending to a depth of over 200m. Mineralisation remains
open along strike and down-dip.
Page 7 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
Planning is also underway for resource definition drilling at the Trafalgar prospect, as well as for
a larger step-out exploration program to test the highly prospective zone between the two
prospects.
Figure 4 – Brilliant Cross-Section.
Page 8 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
Metallurgical testwork
Sighter metallurgical testwork reported during the Quarter on 35 low to medium-grade samples
(0.1g/t - 4.5g/t Au) from the Trafalgar Prospect achieved 94% average gold extraction.
The samples were sourced from broad zones of lower-grade mineralisation outside of the high-
grade vein domains used to estimate the November 2024 Trafalgar Exploration Target. The
testwork was undertaken to investigate the cyanide leachability of lower-grade mineralisation and
whether it warrants further evaluation as part of potential future bulk-mining scenarios.
In 2023, an initial program of metallurgical testwork was undertaken with the aim of establishing
whether the gold at the Trafalgar Prospect at Golden Ridge was readily recoverable using
conventional cyanide leaching processes. A total of 26 samples across a wide range of gold
grades (only six of which were <1.0g/t Au) were tested for gold extraction by cyanide using a
bottle roll leach (LeachWELLTM
) test at Australian Laboratory Services Pty Ltd (ALS).
This second Trafalgar program used the same LeachWELLTM
method on 35 low to medium grade
(0.1g/t - 4.5g/t Au) samples, 28 of which were <1.0g/t Au.
The results returned gold recoveries ranging from 88% to 97%. Overall, the average achieved
across the 35 samples was 94% gold extraction.
These results are also consistent with previously reported LeachWELLTM
testwork results on six
arsenopyrite-pyrite-bearing quartz vein samples from the Grenadier prospect, which achieved an
average gold extraction of 94.9%.
Collectively, the LeachWELLTM
test results indicate that a high proportion of the gold contained in
the samples tested at Golden Ridge is cyanide extractable and support further evaluation of
conventional cyanide leaching as a potential processing pathway.
It should be noted that LeachWELLTM
test conditions are more intensive than those typically used
in conventional Carbon-in-Pulp (CIP) or Carbon-in-Leach (CIL) processing and the samples were
tested at a fine (85% passing 75 micron) grind size . Accordingly, while the results provide a
positive indication of gold leachability, further testwork is required to establish recoveries under
potential commercial processing conditions. Further metallurgical testwork is planned.
Next Steps
Activities scheduled/planned over the coming months include:
• Resource definition drilling at the Brilliant and Trafalgar prospects;
• Further sampling for metallurgical studies/processing trials;
• Environmental activities including follow-up field surveys (flora and fauna) in spring 2026; and
• Stakeholder engagement activities.
Page 9 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
Firetower Gold-Tungsten Project
The Firetower Project (EL26/2004) is located in northern Tasmania and covers an area of 62
square kilometres. The project lies in the north-eastern end of the highly mineralised Mt Read
volcanic sequence, which hosts major polymetallic base metals and gold deposits such as Hellyer
and Rosebery, copper-gold deposits such as Mt Lyell and the Henty gold mine (see Figure 5).
Historical exploration in the Firetower Project area, beginning in the 1970s, was largely gold
focused. Anomalous cobalt and tungsten were noted by previous explorers but generally not
followed up due to the gold-focused exploration models applied at the time.
The polymetallic mineralisation at Firetower is currently defined by historical drilling over a strike
length of 200m and remains open along a highly prospective 6km-long trend.
Figure 5 – Location of Flynn Gold tenements in NW Tasmania.
Page 10 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
Phase 2 Drilling Program
Assay results were reported during the Quarter from Phase 2 drilling at Firetower targeting depth
extensions to high-grade polymetallic gold-tungsten-cobalt mineralisation and collect fresh core
samples for planned metallurgical testwork.
Results from the program will support the delivery of a maiden Mineral Resource Estimate for
the project.
Extensional drill hole 2019FTD003E intersected a zone of broad polymetallic mineralisation,
returning a significant mineralised intercept of:
• 12.95m @ 2.24g/t Au, 0.46% WO3, 0.18% Cu, 0.23% Co, 7.22g/t Ag from 156.90m,
including:
o 1.20m @ 3.95g/t Au, 0.93% WO3, 0.20% Cu, 0.24% Co, 9.60g/t Ag from 157.30m;
and
o 2.58m @ 4.56g/t Au, 0.92% WO3, 0.22% Cu, 0.32% Co, 8.31g/t Ag from 167.27m,
including
o 0.73m @ 11.95g/t Au, 2.29% WO3, 0.46% Cu, 0.64% Co, 20.3g/t Ag from 167.27m
Extensional drill hole 2019FTD014E also returned a significant mineralised intercept of:
• 9.64m @ 2.49g/t Au, 0.29% WO3, 0.52% Cu, 0.04% Co and 9.9g/t Ag from 200.13m,
including:
o 3.77m @ 4.30g/t Au, 0.30% WO3, 0.37% Cu, 0.13% Co and 11.24g/t Ag from 200.13m,
and
o 1.47m @ 4.62g/t Au, 1.10% WO3, 2.20% Cu, 0.07% Co and 29.42g/t Ag from 208.3m
The 2019FTD003E intercept occurs approximately 50m north-west of hole 2019FTD014E. These
results support the continuity of significant polymetallic mineralisation and demonstrate the
potential for further extensions both at depth and along strike.
2019FTD015E, which is located approximately 25 metres to the east of 2019FTD014E, was
drilled as an extension to historical hole 2019FTD015 (original depth of 157m). The extension
drilling intersected three zones of mineralisation.
2019FTD015E:
• 1.9m @ 2.02g/t Au, 0.56% WO3, 0.11% Cu, 0.12% Co, 7.86g/t Ag from 167.3m within a
broader intercept of:
o 12.5m @ 0.55g/t Au, 0.11% WO3, 0.09% Cu, 0.10% Co, 4.5g/t Ag from 158.5m;
• 1.20m @ 2.1g/t Au, 0.23% WO3, 0.53% Cu, 0.10% Co, 9.02g/t Ag from 194.8m; and
• 2.35m @ 1.46g/t Au, 0.21% WO3, 0.55% Cu, 0.09% Co, 7.23g/t Ag from 241.9m, including:
o 0.20m @ 13.5g/t Au, 2.26% WO3, 4.37% Cu, 0.74% Co, 53.4g/t Au from 242.35m.
Page 11 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
Figure 6 – Firetower Drill Hole Plan.
Updated Geological Model
Ongoing geological interpretation, incorporating recent drilling results and a review of historical
data, has identified two principal mineralised structural trends at Firetower (Figure 6):
• F300 Zone: A northwest-trending corridor characterised by broad zones of polymetallic
gold-tungsten-copper-cobalt mineralisation, including discrete high-grade intervals.
• F90 Zone: An approximately east-west trending corridor characterised by broad zones of
predominantly gold mineralisation, generally with lower tungsten and base metal grades,
but containing localised higher-grade gold and polymetallic intervals.
The latest drilling results have further strengthened the geological interpretation of the F300
Zone, confirming the extension of significant polymetallic mineralisation below and north-west of
previous drilling. In particular, the intercept in 2019FTD003E, approximately 50m north-west of
2019FTD014E, supports the interpretation of a possible northwest-plunging zone of higher-grade
mineralisation within the broader F300 structural corridor (Figure 7).
Importantly, the F300 Zone remains open to the north-west and at depth, highlighting the
potential to extend the currently defined mineralised footprint.
Page 12 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
The F90 Zone appears to terminate against the F300 structural corridor (Figure 8). Historical
drilling indicates broad zones of predominantly gold mineralisation containing locally developed,
narrower polymetallic intervals, typically 1-3m down-hole. However, wider and higher-grade
polymetallic mineralisation occurs near the F300 Zone, where the two mineralised trends appear
to converge. This suggests that structural interaction may have influenced the distribution and
intensity of polymetallic mineralisation.
The revised geological interpretation provides an improved understanding of the distribution of
higher-grade mineralisation and will help guide future exploration and drill targeting.
Figure 7 – Long Section A-A’: Firetower F300 Zone.
Page 13 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
Figure 8 – Long Section B-B’: Firetower F90 Zone.
Geophysical Study
Several generations of geophysical surveys have been completed historically in a piecemeal
approach over a zone of 6 kilometres between Firetower West and Firetower East (Figure 9).
The main Induced Polarisation (IP) surveys completed to date are shown with similar
chargeability images, highlighting an apparent continuity of mineralisation, particularly between
the Firetower and Firetower East prospects.
At the Firetower deposit, sub-surface gold-tungsten mineralisation identified in drilling to date is
spatially associated with a zone of high chargeability, which appears to continue for several
kilometres along strike.
While the earlier IP surveys clearly indicate the large potential scale of the system, the amount
of drilling outside the Firetower prospect is very limited to date (see Figure 10).
Page 14 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
Figure 9 – Compilation Plan of historical IP surveys over the Firetower Project.
Figure 10 – Regional Geology Plan of the Firetower-Firetower East Zone
showing IP and drill-hole positions.
Page 15 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
Resource Potentials Pty Limited has been engaged to undertake a project-wide re-interpretation
of historical geophysical datasets using their latest processing software.
The study is expected to be completed in Q4 2026.
Next Steps
Planned activities for the remainder of 2026 at the Firetower Project are:
• Metallurgical testwork;
• Geological modelling leading to maiden Mineral Resource Estimate; and
• Review of historical geophysical surveys across the entire Firetower Project area.
Warrentinna Project
During the Quarter the Company commenced a trenching program at the Gorge Creek Tungsten
Prospect within the Warrentinna Project. Vein mapping and selective channel sampling of the
trenches will be undertaken during the summer period.
The Company also executed a Grant Deed under Round 12 of the Exploration Drilling Grants
Initiative Program whereby the State Government of Tasmania has agreed to co-fund $100,000
of diamond drilling at the Gorge Creek prospect, which is to be completed by November 2027.
Exploration – Western Australia
Flynn Gold retains the Yarrie (one exploration licence application) and Mount Dove Projects (two
exploration licence applications) in the Pilbara region of Western Australia, which are prospective
for gold/lithium and iron ore mineralisation.
During the quarter, two granted exploration licences at the Yarrie Project were surrendered.
Corporate
Renounceable Rights Issue
During the Quarter, Flynn Gold launched a one-for-three renounceable rights issue at an issue
price of $0.015 (1.5 cents) per share. For every two new shares subscribed, Eligible
Shareholders received one free attaching new option with an exercise price of $0.03 (3 cents)
per option, expiring 30 months from the date of issue.
The Rights Issue was underwritten to $1.5 million by Lead Manager and Underwriter Mahe
Capital Pty Ltd (ACN 634 087 684) (AFSL 517246).
The Rights Issue closed on 21 October 2026 and successfully raised $1.5 million (before costs).
The issue of 99,999,998 new fully paid ordinary shares and 50,000,032 new options to
participants was completed on 28 October 2026.
Page 16 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
ATM Facility
During the quarter, Flynn Gold utilised its At-The-Market (ATM) Subscription Agreement with
Dolphin Corporate Investments to raise $61,184 (after costs) through the set-off of 3,200,000 FG1
shares previously issued under the ATM. No further shares were issued.
The set-off shares reduce the total number of Security Shares to 3,200,000 shares that Dolphin
Corporate Investments is otherwise required to return to the Company upon termination or
maturity of the ATM.
Research and Development Tax Refund
During the Quarter, the Company received a Research and Development Tax Initiative refund for
the Financial Year ended 30 June 2025 of $247,285.
Sale of Shares
During the Quarter the Company disposed of 641,378 shares held in Forrestania Resources
Limited (ASX:FRS), realising $246,261.
Cash Position
The Company’s cash position at 30 September 2026 was $0.41 million.
Summary of expenditure
The Company’s major cashflow movements for the quarter included:
• Exploration & Evaluation expenditure - $872k;
• Employee costs - $122k; and
• Administration and corporate costs - $255k.
Payments to related parties of the entity and their associates
In the September quarterly Appendix 5B, the figure of $104k as disclosed in section 6.1 and 6.2
relates to salaries and fees (including superannuation) paid to directors and their associates
during the quarter.
Approved by the Board of Flynn Gold Limited.
30 October 2026
For more information:
Neil Marston
Chief Executive Officer
+61 3 9692 7222
info@flynngold.com.au
Nicholas Read
Media & Investor Relations
+61 (0) 419 929 046
nicholas@readcorporate.com.au
For further information or to post questions go to the Flynn Gold Investor Hub at
https://flynngold.com.au/link/yz8pbr.
Page 17 of 17 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
Interests in Mining Tenements
The Company holds a granted beneficial interest in the following tenements as at 30th
September
2026:
References
ASX Announcement 10 April 2026 - Flynn Ramps Up Gold Exploration at Golden Ridge, NE Tasmania
ASX Announcement 1 June 2026 - Expanded Drilling Program at Firetower Gold-Tungsten Project
ASX Announcement 15 July 2026 - Amendment to Announcement on Firetower Project
ASX Announcement 16 July 2026 - First Firetower Drill Hole Extends High-Grade Gold-Tungsten
ASX Announcement 22 July 2026 - Key Mining Lease Application Registered for Golden Ridge
ASX Announcement 29 July 2026 - Study to Unlock New Firetower Gold-Tungsten-Copper Targets
ASX Announcement 6 August 2026 - Ore Purchase Agreement with Henty Gold Mine
ASX Announcement 10 August 2026 - Gold Resource Drilling to Commence at Brilliant Prospect
ASX Announcement 18 August 2026 - 94% Gold Extraction Achieved in Metallurgical Tests
ASX Announcement 28 August 2026 - Multiple Polymetallic Gold-Tungsten Zones at Firetower
ASX Announcement 21 September 2026 - Renounceable Rights Issue to Raise Up to $3 Million
ASX Announcement 6 October 2026 - Bulk Sample Sent to Henty Gold Mine for Processing Testwork
ASX Announcement 19 October 2026 - Firetower High-Grade Gold-Tungsten Mineralisation Extended
ASX Announcement 28 October 2026 - Rights Issue Completion
In accordance with Listing Rule 5.23.2, the Company confirms in this subsequent public report that it is not aware of
any new information or data that materially affects the information included in any previous market announcements.
Mining
Tenement
Location
Beneficial
Percentage
held
Licence
Description
Interest
acquired/farm-in or
disposed/farm-out
during the quarter
EL11/2012 NE Tasmania 100% Portland -
EL13/2024 NE Tasmania 100% Beaconsfield
EL18/2016 NE Tasmania 100% Cameron -
EL17/2018 NE Tasmania 100% Golden Ridge -
EL16/2021 NE Tasmania 100% Bendover Hill -
EL02/2019 NE Tasmania 100% Mangana -
EL3/2020 NE Tasmania 100% Lisle -
EL16/2024 NE Tasmania 100% Lisle -
EL4/2020 NE Tasmania 100% Lyndhurst -
EL30/2004 NE Tasmania 100% Warrentinna -
EL26/2004 NW Tasmania 100% Firetower -
EL6/2015 W Tasmania 100% Henty South -
EL3/2018 W Tasmania 100% Henty North -
E45/5730 Yarrie, WA 0% Shay Gap Surrendered
E45/5731 Yarrie, WA 0% Shay Gap Surrendered
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Flynn Gold Limited
ABN Quarter ended (“current quarter”)
82 644 122 216 30 September 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
1. Cash flows from operating activities -
1.1 Receipts from customers
1.2 Payments for
(872) (872)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (122) (122)
(e) administration and corporate costs (255) (255)
1.3 Dividends received (see note 3) - -
1.4 Interest received 8 8
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives 228 228
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating
activities (1,013) (1,013)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) exploration & evaluation - -
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments 246 246
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
246 246
3. Cash flows from financing activities
64 64
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
- -
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
(3) (3)
3.8 Dividends paid - -
3.9 Other (payments of Lease Liabilities) - -
3.10 Net cash from / (used in) financing
activities
61 61
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
1,115 1,115
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(1,013) (1,013)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
246 246
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
61 61
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
409 409
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 409 265
5.2 Call deposits - 850
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
409 1,115
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
104
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
Share your feedback
Discover