Shallow High-Grade Gold-Tungsten-Cobalt at Firetower Project
Latest announcements
Announcement summary
Shallow High-Grade Gold-Tungsten-Cobalt at Firetower Project
Highlights
Re-sampling and assaying of historical drill core yields wide, high-grade gold-tungsten intercepts from near surface including:
GP-90-10
17m (7-24m) @ 4.1g/t Au, 0.21% WO₃ and 0.04% Co, including
o 6m @ 9.27g/t Au, 0.59% WO₃ and 0.08% Co from 7m, including
o 3m @ 17.20g/t Au, 1.10% WO₃ and 0.02% Co from 10m
92% increase in tungsten assay to project-wide best of 17 metres @ 0.73% WO₃ in hole 2019FTD007E when samples were re-assayed using a more accurate laboratory method, upgrading the result to:
2019FTD007E
17m (121-138m) @ 2.3 g/t Au, 0.73% WO₃, 0.16% Co and 0.16% Cu including:
o 1.7m @ 6.64g/t Au, 1.08% WO₃, 0.13% Co and 0.14% Cu from 121.0m
o 3.8m @ 2.18g/t Au, 0.88% WO₃, 0.27% Co and 0.10% Cu from 126.2m, and
o 5.5m @ 3.27g/t Au, 0.61% WO₃, 0.24% Co and 0.33% Cu from 132.5m
Re-sampling of remaining historical drill core will accelerate over the coming weeks, targeting a Mineral Resource Estimate in H1 CY2026
Ask a question
Your question will be visible to everyone.
Investor Q&As
Start the conversation
Ask Flynn Gold a question about this announcement.