June 2025 Quarterly Activities Report and Appendix 5B
Latest announcements
Announcement summary
June 2025 Quarterly Activities Report and Appendix 5B
HIGHLIGHTS
Exploration – Golden Ridge Project, NE Tasmania
Grenadier Prospect
Significant new quartz vein system extending over a strike length of at least 300m confirmed via trenching and sampling.
Bulk sample collected for metallurgical testwork, with sighter assays averaging 10.5g/t Au and 95% gold recoveries achieved from conventional leach test work
Drilling commenced in late June to test the down-dip continuity of high-grade quartz-sulphide veins exposed near-surface and to investigate structural controls on the gold mineralisation
Trafalgar Prospect
Two drill-holes completed at Trafalgar North for 355.9m, with assays confirming the presence of gold mineralisation along strike
Four drill-holes completed at Trafalgar for 879m, targeting multiple high-grade gold veins beneath historical mine workings – assays pending
Double Event Prospect
Emerging gold target identified with rock chip samples recording grades of up to 44.5g/t Au
Trenching program around historical workings commenced during the quarter – assays pending
Corporate
The Company’s cash position at 30 June 2025 was $1.2 million
Ask a question
Your question will be visible to everyone.
Investor Q&As
Start the conversation
Ask Flynn Gold a question about this announcement.