Drilling Commences at High-Grade Silver King Prospect
Released
Released
Announcement PDF
JOIN FLYNN GOLD’S INTERACTIVE INVESTOR HUB to interact
with Flynn’s announcements and updates by asking questions or
making comments which our team will respond to where possible
ASX Announcement
20 February 2026
ASX: FG1
ABN 82 644 122 216
CAPITAL STRUCTURE
Share Price: A$0.025
Cash (31/12/25): A$3.45M
Debt: Nil
Ordinary Shares: 608.6M
Market Cap: A$15.2M
Options
Listed (FG1O): 50.6M
Listed (FG1OA): 118.7M
Unlisted Options: 65.5M
BOARD OF DIRECTORS
Clive Duncan
Non-Executive Chair
Neil Marston
Managing Director and CEO
Sam Garrett
Technical Director
John Forwood
Non-Executive Director
COMPANY SECRETARY
Mathew Watkins
CONTACT
Suite 2, Level 11
385 Bourke Street
Melbourne VIC 3000
info@flynngold.com.au
www.flynngold.com.au
Henty Silver-Lead-Zinc Project
Drilling Commences at High-Grade
Silver King Prospect at
Zeehan – Western Tasmania
Highlights
• First drilling in approximately 80 years is now underway at the historical
Silver King Mine in Western Tasmania.
• Drilling is targeting down-plunge extensions of historically mined high-
grade silver-lead-zinc mineralisation along the 1.6km-long Silver King
trend.
• Historical drilling in 1947 returned reported assay grades of up to 547g/t
Ag and 47.5% Pb over 0.5m beneath the Silver King Mine.
• Program represents an initial modern proof-of-concept test of the Silver
King Trend, with up to six diamond holes planned totalling 1,200m.
• Silver King represents the first of many prospects Flynn has identified as
being prospective for silver-lead-zinc mineralisation at Henty.
• Zeehan is a mining town on the west coast of Tasmania, known for the
extensive discovery and mining of high-grade vein-style silver-lead
deposits from 1882.
• FG1 owns 100% of the Henty Project with the area having excellent
infrastructure and access to services associated with nearby established
mining operations.
• For further information or to post questions, go to the Flynn Gold Investor
Hub at https://flynngold.com.au/link/rDG6xe
Flynn Gold Limited (ASX: FG1, “Flynn” or “the Company”) is pleased to
advise the commencement of its first-ever diamond drilling program at the
highly prospective Silver King prospect, located within its 100%-owned Henty
Silver-Lead-Zinc Project near Zeehan in Western Tasmania (Figure 1).
The program represents the first drill testing of the Silver King Trend in
approximately 80 years and is designed to evaluate whether the high-grade
shoots mined historically persist at depth.
Flynn’s Henty Project covers many historical silver-lead-zinc deposits and
mines as well as mineralised zones discovered by more recent exploration,
highlighting the exceptional prospectivity of the project area (See Figure 1).
Page 2 of 16 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Managing Director and CEO, Neil Marston commented:
“Silver King is a high-grade silver-lead system that was mined from the late 1880’s to early 1900’s
and has since seen only very limited exploration drilling below the old workings. This program
represents the first modern drill test of the trend in almost 80 years and is designed to assess
whether the structurally controlled ore shoots persist at depth.
“Historical production reports describe the selective mining of massive galena mineralisation
extracted from rich vein shoots with high-grade ore grading approximately 25-45 ounces/tonne
silver and 70-75% lead, with locally reported grades of up to 100 ounces/tonne silver at the South
King mine.
“Importantly, the program is staged, allowing us to expand drilling based on geological
observations and results. Our objective at this stage is to test the proof-of-concept and build a
modern geological understanding of this highly prospective system.”
Figure 1 – Henty Project - Geology and Prospect Locations.
Page 3 of 16 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Silver King Trend
Historical Mining
The Silver King mine was one of the earliest developments at Zeehan following the discovery of a
galena lode in late 1882. The Main Shaft at Silver King was sunk to a depth of 250 feet (76m) and
developed along three levels.
Mining along the Silver King trend commenced in the late-1880s and continued until the early
1900s. Historical reports describe hand-sorted massive galena mineralisation extracted from
narrow, structurally controlled vein shoots.
Selected high-grade ore was reported to grade approximately 25-45oz/t (780-1,400g/t) silver and
70-75% lead, with locally reported grades of up to 100oz/t (3,110g/t) silver at the South King mine1
.
These grades reflect selectively mined material from high-grade shoots and may not represent in-
situ grade distribution within the broader mineralised structures.
Figure 2 - Photograph of the Silver King Mine circa 18902.
The Company notes that historical production figures are incomplete, are derived from early mining
records and have not been independently verified. They are not reported in accordance with the
JORC Code (2012) and should not be relied upon as an indication of current mineralisation. Given
the selective nature of historical mining, reported grades may not be representative of the broader
mineralised system.
1
Waller, G.A., 1904. Report on the Zeehan silver-lead mining field, Dept. Mines Tasmania Rep. OS 224
2
Source: Libraries Tasmania – Item NS869/1/5
Page 4 of 16 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
The Silver King vein trend comprises a north-northwest striking zone of steeply-dipping silver-rich
galena-sphalerite fissure veins extending for approximately 1.6km between the historical Sunrise
and Silver King mines (Figure 3).
In preparation for the upcoming drilling program, sampling of the historical workings including
mullock, tailings and slag stockpiles at the South King, Zeehan Bell and Sunrise workings has been
completed with assays pending. Similar sampling at the Silver King mine and other nearby
workings was completed and reported in 20253
(Figure 3).
Figure 3 - Silver King Area Location Plan showing line of workings
3 See FG1 ASX Announcement dated 19 February 2025 for full details.
Page 5 of 16 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Historical Drilling
Previous exploration drilling of the Silver King Trend is reported by North Broken Hill Limited in
19474
and comprised only 10 holes to a maximum depth of 183.2m (approximately 30m below the
old workings) (See Table 1 for drill hole information). The drilling intersected narrow zones of
silver-lead-zinc mineralisation below the historical mine workings at Silver King and South King.
Significant historical intercepts include:
Silver King Mine:
• 0.5m @ 547g/t Ag, 47.5% Pb, 5% Zn from 95.55m (DDH-15)
• 0.2m @ 134g/t Ag, 14.7% Pb, 5.4% Zn from 42.37m (DDH-16)
South King Mine:
• 1.2m @ 134g/t Ag, 13.3% Pb, 12.9% Zn from 139.0m (DDH-21)
• 1.3m @ 37g/t Ag, 3.0% Pb, 5.2% Zn from 92.4m (DDH-17)
The limited historical drilling demonstrates that mineralisation was intersected below the historical
workings; however, the extent and continuity of this mineralisation remain to be tested by modern
drilling.
No drilling has been reported along the broader 1.6km-long Silver King Trend since 1947. The
historical drilling was limited in scope, utilised very small diameter (22mm) drill core, and did not
comprehensively test depth or strike continuity of the mineralised structures.
The current program is therefore designed as an initial proof-of-concept drill test to evaluate the
geometry and continuity of mineralisation beneath and between the historical workings within the
interpreted structural setting.
Current Drilling Program
The current program comprises a staged diamond drilling campaign of up to six holes for
approximately 1,200m along the Silver King Trend. The locations of the proposed drill collars are
shown in Figure 3.
Initial drilling will include a minimum of two holes (approximately 440m), with any additional holes
contingent on geological observations and assay results.
This staged approach allows the Company to manage exploration risk while evaluating the proof-
of-concept for depth extensions of mineralisation.
Silver King Mine
At Silver King, drilling will test interpreted down-plunge extensions of historically mined Ag-Pb-Zn
mineralisation approximately 50-70m below the lowest historical underground levels (equivalent to
approximately 120-140m below surface).
South King Mine
At South King, located approximately 1km along strike to the south, drilling will test interpreted
down-plunge extensions approximately 20-80m below the historical workings (approximately 90-
150m below surface) over a strike extent of approximately 100m.
4
Individual drill hole logs held by Mineral Resources Tasmania under report references 6176-6185
Page 6 of 16 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
In addition to testing depth extensions, the drilling will evaluate the potential for parallel mineralised
structures and provide structural and stratigraphic information to refine the geological model of the
Silver King Trend.
The program represents an initial modern drill test of the mineral system. While not designed to
directly twin historical drill holes, it will assess whether high-grade mineralisation similar to that
reported historically occurs within the interpreted structural framework at depth.
Assay results are expected in due course, and the Company will provide updates as drilling
progresses.
Figure 4 - Drill Rig on site at Silver King Prospect
Approved by the Board of Flynn Gold Limited.
For more information contact:
Neil Marston
Managing Director & CEO
+61 3 9692 7222
info@flynngold.com.au
Nicholas Read
Media & Investor Relations
+61 (0) 419 929 046
nicholas@readcorporate.com.au
Page 7 of 16 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
About Flynn Gold
Flynn Gold is an Australian mineral exploration company with a portfolio of projects in Tasmania (see Figure
5) The Company has ten 100% owned tenements located in northeast Tasmania which are highly
prospective for gold as well as tin/tungsten.
The Company also has the Henty zinc-lead-silver project on Tasmania’s mineral-rich west coast and the
Firetower gold and critical metals project located in northern Tasmania.
Flynn has also established a portfolio of gold-lithium exploration assets in the Pilbara and Yilgarn regions of
Western Australia.
For further information regarding Flynn Gold please visit the ASX platform (ASX: FG1) or the Company’s
website www.flynngold.com.au.’
Figure 5 – Location of Flynn Gold tenements in Tasmania.
Page 8 of 16 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Table 1 – North Broken Hill Ltd 1947 Drill Hole Information
Hole ID Easting Northing Elevation Dip Azimuth Depth Prospect
DDH-13 362555 5360620 172 -45 61.5 183.2 Silver King
DDH-14 363015 5359800 168 -45 60.5 86.9 South King
DDH-15 362630 5360590 169 -54 59.5 114.9 Silver King
DDH-16 362690 5360510 165 -60 64 106.7 Silver King
DDH-17 363055 5359814 168 -76 60 100.6 South King
DDH-18 363130 5359533 160 -45 51 149.7 Zeehan Bell
DDH-19 362995 5359885 173 -60 58 156.7 South King
DDH-20 363100 5359595 162 -56 57 153.6 Zeehan Bell
DDH-21 363030 5359670 166 -50 57 151.8 Zeehan Bell
DDH-22 363125 5359880 167 -36 234 152.1 South King
References
Waller, G.A., 1904. Report on the Zeehan silver-lead mining field, Dept. Mines Tasmania Rep. OS 224
ASX Announcement 15 June 2021 – Prospectus dated 30 March 2021
Previous rock sampling assay results referenced in this release have been taken from the following ASX
releases:
ASX Announcement 19 February 2025
In accordance with Listing Rule 5.23.2, the Company confirms in this subsequent public report that it is
not aware of any new information or data that materially affects the information included in any previous
market announcements.
Page 9 of 16 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Competent Person Statement
The information in this ASX Announcement that relates to Exploration Results, including historical
Exploration Results, is based on information compiled and reviewed by Mr Sean Westbrook, a
Competent Person who is a Member of the Australian Institute of Geoscientists. The historical
Exploration Results referenced in this announcement have been compiled and reviewed based on
available documentation.
Mr Westbrook is a consultant to Flynn Gold and is a shareholder in Flynn Gold. Mr Westbrook has
sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration
and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of
the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr
Westbrook consents to the inclusion in this announcement of the matters based on his information in the
form and context in which they appear.
This announcement includes information that relates to Exploration Results prepared and first disclosed
under the JORC Code (2012) and extracted from the Company’s previous ASX announcements as
noted, and the Company’s Prospectus dated 30 March 2021. Copies of these announcements are
available from the ASX Announcements page of the Company’s website: www.flynnngold.com.au.
The Company confirms that it is not aware of any new information or data that materially affects the
information included within the Prospectus dated 30 March 2021.
Historical Exploration Results
This announcement includes historical Exploration Results derived from archived government and
company reports relating to mining and drilling conducted in the late 1800s to mid-1900s. These historical
Exploration Results are reported in accordance with the JORC Code (2012), with supporting commentary
provided in the JORC Code Table 1 included in this announcement.
The original sampling, assaying and drilling procedures were not conducted to modern industry
standards and documentation relating to quality control, laboratory methods and sample security is
limited. The Company has not independently verified the original assay certificates or laboratory
procedures associated with the historical data.
The historical information is presented for the purpose of providing context to exploration targeting and
should not be relied upon as an indication of the presence or grade of mineralisation.
Forward Looking and Cautionary Statements
Some statements in this announcement regarding estimates or future events are forward-looking
statements. They include indications of, and guidance on, future earnings, cash flow, costs and financial
performance. Forward-looking statements include, but are not limited to, statements preceded by words
such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”,
“believes”, “potential”, "predict", "foresee", "proposed", "aim", "target", "opportunity", “could”, “nominal”,
“conceptual” and similar expressions. Forward-looking statements, opinions and estimates included in
this report are based on assumptions and contingencies which are subject to change without notice, as
are statements about market and industry trends, which are based on interpretations of current market
conditions. Forward-looking statements are provided as a general guide only and should not be relied
on as a guarantee of future performance. Forward-looking statements may be affected by a range of
variables that could cause actual results to differ from estimated or anticipated results and may cause
the Company’s actual performance and financial results in future periods to materially differ from any
projections of future performance or results expressed or implied by such forward-looking statements.
So, there can be no assurance that actual outcomes will not materially differ from these forward-looking
statements.
Page 10 of 16 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
JORC Code Table 1 for Exploration Results
Section 1: Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g.
cut channels, random chips, or
specific specialised industry standard
measurement tools appropriate to
the minerals under investigation,
such as downhole gamma sondes, or
handheld XRF instruments, etc.).
These examples should not be taken
as limiting the broad meaning of
sampling.
The historical mining grades referenced in this announcement are
derived from archived government and company mining reports
dating from the late 1800s to early 1900s. These grades relate to
selectively mined, hand-sorted ore and no documentation describing
sampling methodology, analytical procedures or quality control
measures has been located. Historical production grades may not
represent in-situ grade distribution within the broader mineralised
structures.
The historical drill intercepts referenced were reported by North
Broken Hill in 1947 and are understood to have been derived from
diamond core drilling. Limited documentation describing sampling
procedures, core handling or assay protocols has been identified.
No new exploration results are reported in this announcement.
Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used.
No documentation has been located describing measures taken to
ensure sample representivity during the historical mining operations
or the 1947 drilling program. Information regarding calibration of
analytical instruments or laboratory quality control procedures is not
available.
Given the age of the data, historical sampling and analytical practices
cannot be assessed against modern industry standards.
Aspects of the determination of
mineralisation that are Material to
the Public Report.
The mineralisation referenced in this announcement comprises
steeply dipping, structurally controlled silver-lead-zinc fissure veins
hosted within Silurian Bell Shale.
Historical mining grades reflect selectively mined high-grade material
from narrow vein shoots. Historical drill intercepts represent
downhole intersections of these vein systems as documented in 1947
company reports. True widths are unknown.
The historical information is presented for the purpose of providing
context to exploration targeting. The current drilling program is
designed to provide an initial modern test of the interpreted mineral
system and is not intended to directly validate historical sampling or
assaying procedures.
Drilling
techniques
Drill type (e.g. core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic,
etc.) and details (e.g. core diameter,
triple or standard tube, depth of
diamond tails, face-sampling bit or
other type, whether core is oriented
and if so, by what method, etc.).
The historical drilling referenced in this announcement was completed
by North Broken Hill Limited in 1947 and comprised diamond core
drilling. Historical drill logs indicate that very small diameter core
(approximately 22mm) was recovered. No detailed documentation
describing drill rig type, core orientation methods, downhole survey
procedures or drilling parameters has been located.
Drill sample
recovery
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Historical drill logs from the 1947 North Broken Hill drilling program
record core recovery measurements. Recovery within mineralised
zones is reported as variable but generally between approximately
75% and 100%.
Detailed recovery statistics for the current drilling program will be
reported when assay results are released.
No new assay results are reported in this announcement.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
No detailed documentation describing procedures used to maximise
core recovery has been located. Given the small diameter of the core
recovered (approximately 22mm), variability in recovery may have
influenced sample representativity.
Page 11 of 16 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Criteria JORC Code explanation Commentary
Whether a relationship exists
between sample recovery and grade
and whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material.
The relationship between reported recovery and grade cannot be
assessed from the available limited historical records.
Logging Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
Historical drill logs from the 1947 North Broken Hill drilling program
indicate that geological logging was undertaken. The available logs
record brief notes on lithology and mineralisation; however, detailed
documentation describing logging procedures, geotechnical
measurements or logging standards has not been located.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
The historical logging is considered qualitative in nature and
insufficient to support Mineral Resource estimation.
No records of core photography from the 1947 drilling program have
been identified.
The total length and percentage of
the relevant intersections logged.
Historical drill logs from the 1947 North Broken Hill drilling program
indicate that geological logging was undertaken on all intersections.
The available logs record brief notes on lithology and mineralisation
only.
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and
whether quarter, half or all core
taken.
Historical drill logs indicate that very small diameter diamond core
(approximately 22mm) was recovered during the 1947 drilling
program. Based on available documentation, it is understood that
whole-core sampling was undertaken.
No documentation describing core cutting or splitting procedures has
been located.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
The historical drilling referenced comprised diamond core drilling. No
non-core drilling methods are reported in available historical
documentation.
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
No documentation describing sample preparation procedures,
crushing, pulverising or laboratory preparation methods used during
the 1947 drilling program has been identified.
The appropriateness of historical sample preparation techniques
cannot be assessed against modern industry standards.
Quality control procedures adopted
for all subsampling stages to
maximise representivity of samples.
No documentation describing quality control procedures, standards,
blanks, duplicates or check assays associated with the 1947 drilling
program has been located.
Quality control measures applied to the historical sampling cannot be
verified.
Measures taken to ensure that the
sampling is representative of the in-
situ material collected, including for
instance results for field
duplicate/second-half sampling.
Whole-core sampling of small diameter (approximately 22mm) core
was reportedly undertaken during the 1947 drilling program, which
would have reduced potential sub-sampling bias.
No documentation describing duplicate sampling or other
representivity checks has been identified.
Historical production grades reflect selectively mined material
extracted from high-grade shoots. Sampling and preparation methods
for this material are not documented.
Whether sample sizes are
appropriate to the grain size of the
material being sampled.
The mineralisation comprises coarse galena-sphalerite vein material
hosted within fissure veins. The small diameter core (approximately
22mm) utilised during the 1947 drilling program may have increased
the potential for sampling variability where coarse mineralisation was
present.
The appropriateness of historical sample size relative to grain size
cannot be fully assessed from available records.
Page 12 of 16 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Criteria JORC Code explanation Commentary
Quality of
assay data
and
laboratory
tests
The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
Historical assay results referenced in this announcement are derived
from 1947 North Broken Hill company reports. No documentation
describing analytical methods, laboratory procedures, digestion
techniques or whether assays were partial or total has been located.
The appropriateness of the historical assaying techniques cannot be
assessed against modern industry standards.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make
and model, reading times,
calibrations factors applied and their
derivation, etc.
No geophysical tools, spectrometers, handheld XRF instruments or
similar analytical devices are referenced in the historical
documentation.
No such data is reported in this announcement.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory
checks) and whether acceptable
levels of accuracy (i.e. lack of bias)
and precision have been established.
No documentation describing quality control procedures, including the
use of standards, blanks, duplicate samples or external laboratory
checks associated with the 1947 drilling program, has been identified.
Accordingly, the accuracy and precision of the historical assay data
cannot be assessed against modern quality assurance and quality
control (QA/QC) standards.
Verification
of sampling
and assaying
The verification of significant
intersections by either independent or
alternative company personnel.
The significant historical drill intersections reported in this
announcement have been compiled from 1947 North Broken Hill
company reports and associated drill logs. The information has been
reviewed by the Company’s Competent Person for relevance to
exploration targeting.
No independent verification drilling or twinning of historical holes has
been undertaken to date.
The use of twinned holes. No twinned drill holes have been completed to verify the historical
drilling results referenced in this announcement.
Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols.
Historical drilling data has been compiled from archived company drill
logs and publicly available government records. Available drill logs,
including core recovery and assay information, have been reviewed
and digitised where appropriate.
Original assay certificates and laboratory documentation have not
been located.
The compiled historical data is stored electronically by the Company
for exploration targeting purposes.
Discuss any adjustment to assay data. No adjustments, top-cuts or recalculations have been applied to the
historical assay data reported in this announcement, other than the
mathematical conversion of interval widths from imperial to metric
units and silver grades from ounces per tonne (oz/t) to grams per
tonne (g/t) for reporting consistency. No reinterpretation of historical
assay data has been undertaken. Converted values have been rounded
to an appropriate number of significant figures for reporting purposes.
Location of
data points
Accuracy and quality of surveys used
to locate drillholes (collar and
downhole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation.
Historical drill hole collar locations are derived from archived company
reports and plans associated with the 1947 drilling program. Collar
positions have been interpreted and digitised where possible.
The accuracy of historical collar locations is uncertain due to the scale
and age of the original plans. No documentation describing downhole
survey methods for the 1947 drilling has been identified.
The historical data is not considered sufficiently accurate for Mineral
Resource estimation.
Specification of the grid system used. Where possible, interpreted historical drill hole collar positions have
been converted to MGA94 Zone 55.
The coordinate reference system for the original historical drilling is
not documented.
Page 13 of 16 | ABN 82 644 122 216 | ASX: FG1
Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
info@flynngold.com.au | www.flynngold.com.au
Criteria JORC Code explanation Commentary
Quality and adequacy of topographic
control.
Historical collar positions have been interpreted relative to mapped
historical mine workings and available topographic data. Due to the
age of the historical plans, the adequacy of original topographic
control cannot be verified.
Proposed collar locations for the current drilling program are based on
modern topographic data and are shown in figures included in the
body of the announcement.
Data spacing
and
distribution
Data spacing for reporting of
Exploration Results.
The 1947 drilling program along the Silver King Trend was limited in
scope and selectiv
Share your feedback
Discover